Download presentation
Presentation is loading. Please wait.
1
Reliance Agro-Initiatives
Role of ICT IN Reliance Agro-Initiatives The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities. Jamnagar R.T. Gunjate
2
Vision To establish a pilot project aimed at fulfilling the Founder Chairman’s vision of bringing Waste lands into productive usage …in the process transforming the arid desert refinery site into an ever green environmental show piece. The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
3
Objectives Improve visual relief, biomass, aesthetics, & ecology and abet pollution. Transform arid lands of Jamnagar Farms to an evergreen environment Maximize Financial returns by optimal utilization of resources. Catalyze faster agricultural growth and higher wealth generation through agriculture. The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
4
Location of RAI , Jamnagar
Lat. : deg. N Long. : deg. E Jamnagar The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
5
Agroclimate Annual Rainfall: 490mm in 21 rainy days from June to Oct.
Mean minimum temp: 6 to 22 0 C Mean maximum temp:25 to 34 0 C (Maximum 43o C. Relative Humidity: % 5. Average foggy days in a year: 9 6 Wind Velocity: KMPH. (Maximum 70 KMPH) . The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
6
Water availability Limitations : Scarcity Quality Sources :
Effluent treated water Sewage treated water Storm water ponds Desal The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
7
Soils 1. Sandy to medium black 2. pH : 7.5 to 9.2 3. EC: 1.5 to 5.3
4. Very low in Organic Carbon. 5. Medium to low in fertility The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
8
RAI Plantation areas The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
9
Plantation Plan The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
10
Crop Mix The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
11
Mango Production Technology
1. Varieties: Kesar- 90% + Alphonso -5% +Exotics& others 100 var. 5% 2. High Density Planting: 5m X 3m, i.e. 666 plants/ha 6m X 2m, i.e plants/ha 3. INM - based on soil and leaf analysis 4. Fertigation 5. Pruning to hedge row 6. Application of Paclobutrazol (Cultar) 7. IPM 8. High productivity of 25MT/ha at steady state The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
12
Mango Production Technology
The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
13
Specialties of Jamnagar Mango
1. Growth comparatively slow. 2. No incidence of diseases and pest during flowering/ fruiting 3.Millions of honey bees on blossom 4. Heavy fruit set and low fruit drop 5. Spotless fruits The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
14
Crop :Cultivars The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
15
Crop :Cultivars The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
16
Timber Crops Teak (Tectona grandis) and Sawan (Gmelina arborea).
HDP with 2200 to 2778 plants/ha. Fertigation. Irrigated with ETP water. Thinning. Teak : 50% in 6th year. 50% of remaining in 12th year. Harvesting in 17th to 20th year. 18 cft/tree. Sawan : The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
17
Achievements “Perhaps the most organized Corporate initiative witnessed in India in the farm sector” ------Cornell Faculty visit, Jan 2002 The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
18
Automated weather station
Parameters of interest: Temperatures: Humidity Rainfall Wind velocity Sunlight CO2 conc. Pan evaporation The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
19
Automated agro-portal
The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
20
Automated agro-portal
The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
21
Automated agro-portal
The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
22
Automated MIS portal The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
23
Automated MIS portal The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
24
Irrigation Automation
Entire plantation on micro-irrigation DIS pilot project on 20 acre compact block Currently manually activated for fixed hours /day Proposed to use feedback system based on sensors like Soil moisture sensing SAP flow (Six spp.: chiku, citrus, guava, grapefruit, litchi, grape) Leaf temp. sensor Possibility of solar cells to provide power for this The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
25
Green House Automation
Present Automation : Partial control of temperature and humidity by fogging in Natural ventilated Green House. Control of temperature and Humidity using fogging and ID Fan operation in Forced Ventilated Green House Automation proposed: Temp, humidity, sunlight, photoperiod . pH, EC etc of nutrient solution Water Backwash of DIS filters Closing/opening of curtains The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
26
Green House Automation
Temperature & RH control Water Quantity based on water flow meter pH & TDS control of Fertilizer Solution Radiation control Controls photoperiod Close curtains during storm Stop pump if leakage in pipeline Backwash filters, when differential pressure exceeds the set pressure. The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
27
Automation of Biometric data
All plants are numbered Growth / fruiting parameters being monitored regularly Plant identification and data entry done manually at site Possibility of using RFID & portable computing device Use of RFID for keeping track of products from harvesting to delivery at customer sites The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
28
Maturity indices Right stage of maturity at harvest is key to quality and shelf life of fruits Visual shape ,colour, size, chem, parameters, sp. grav. etc destructive methods being used Not precise leading to % variability Non-destructive reliable sensor based method required The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
29
Use of GIS Soil mapping Plant health Nutritional status
Disease –pest incidence Yield estimates Bio-mass estimates The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
30
Central Control Room RAI Farm activities of 2000acres scattered on 7500 acre area with 21 Km circumference Five zones and 20 sub-zones ,more than 10 imp crops Necessary to set up Central Control Room to monitor the activity CDMA technology along with sensor network to collect /display data at central place Data available to authorized persons through network PCs. Possibility of using cheap CMOS image sensors to get photograph of some plants on line in control room as and when required The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities.
31
The responsibilities relating to the implementation of MAP projects need some clarity for incorporating in to this set up. However this may not have any bearing on the broader framework. The recently formed steering committee will help in improving the coordination between the implementing group, local RPL groups and the policy making authorities. THANKS
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.