Download presentation
Presentation is loading. Please wait.
Published byMervyn Johns Modified over 9 years ago
1
City of Vancouver, WA Existing Conditions Photos for BID #13-07 Interceptor E Sewer Rehabilitation Project Project No. 083398 June 2013 These are the same photos and comments are found individually on the project’s FTP site
12
10B_P1010094.JPG: Looking into MH Structure #12759. Facing north. Only bench is visible at 4.6 feet below rim. Three feet (3’) of riser rings. Chemical line (inactive) south.
13
10C_P1010095.JPG: Looking into MH Structure #12759. Facing south. Only bench is visible at 4.6 feet below rim. Three feet (3’) of riser rings. Chemical line (inactive) south.
34
31_P1010085.JPG: Standing north of secondarys looking west towards plant influent.
35
32_P1010086.JPG: Standing north of secondarys looking southeast towards ETC.
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.