Updates on the MDGs Needs Assessment Process in Ethiopia By Getachew Adem Head, Development Planning and Research Department (DPRD) & National Coordinator for the PRSP and MDGs, Ministry of Finance and Economic Development (MOFED) Federal Democratic Republic of Ethiopia March 2, 2006 Dar es Salaam Tanzania
2
Outline of the Presentation Background; Study to Localize the MDGs; The MDGs Needs Assessment Study; Scope of the MDGs Needs Assessment Strudy; The MDGs Needs Assessment Synthesis Study; The Formulation of the PASDEP ; Where are We Now?
3
Background Formulation of Ethiopia’s First PRSP entitled SDPRP; SDPRP anchored in Existing Government Policies Strategies and Programs; Preceded by I-PRSP issued in November 2000; Issued in August 2002; Ethiopia reached Decision Point in September 2001; Ethiopia Reached Completion Point in March 2004;
4
Study to Localize the MDGs Linkages between the PRSPs and MDGs: Vehicle towards reaching the MDGs; Linkages between policies,strategies, and programs; Adapting the Indicator Systems; Indicative Budgets based on ICOR; Refocus the Organizational Structure to facilitate the MDGs Process(Coordination between line ministries);
5
The MDGs Needs Assessment Study Preparation to launch the Study Started from January 2004; The Study officially launched in July 2004; Technical Backstopping to line ministries through support from UNCT, DAG, UNDP, UNICEF, WHO, World Bank; Sect oral Needs Assessment Study Commenced in September 2004; Methodological Workshop conducted in the presence of all stakeholders including the World Bank and IMF; The Draft Study completed in October 2004; Workshop on the Draft MDGs Needs Assessment Conducted from November 29 bto December 1 2004;
6
Scope of the MDGs Needs Assessment Study Social Sectors (Education, Health, HIV/AIDS, Water supply and Sanitation); Growth Enhancing Sectors (Agriculture and Rural Development, Roads, Urban Development, Power, Telecom, Small and Medium scale Irrigation); Cross-cutting Issues (Gender and Development, Population and Development;
7
The MDGs Needs Assessment Synthesis Study Brings all the Sect oral pieces together in to a consistent Macroeconomic Framework; Analyze the Financing Strategy based on the Sect oral Needs Assessment studies; Analyze the Implications of Implementing the Ethiopian ten year MDGs Investment Plan; Link Ethiopia’s Second Generation PRSP (Ethiopia: A Plan for Accelerated and Sustained Development to End Poverty (PASDEP)), the first Fiver phase of the MDGs Plan to the MDGs Investment Plan;
8
The Formulation of the PASDEP The PASDEP builds on the four SDPRP Pillars: ADLI, Decentralization and Empowerment, Capacity Building, Justice and Civil Service Reform; Linked to the MDGs Plan with Front loaded infrastructure investment; The PASDEP now considered as a National Development Plan; Poverty Reduction and its ultimate eradication seen as an integral part of the Five Year Development Plan (2005/06-2009/10)
9
Where are We Now? The MDGs Investment Plan Finalized and Issued; The PASDEP has been discussed by the Council of ministers and endorsed in its broad terms but to be further refined based on feed backs from non-state actors; The PASDEP is being augmented and refined and is in its final stage and will be approved by the Parliament with in the coming month;