Presentation is loading. Please wait.

Presentation is loading. Please wait.

· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012.

Similar presentations


Presentation on theme: "· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012."— Presentation transcript:

1 www.perspectives.cc · info@perspectives.cc © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012

2 www.perspectives.cc · info@perspectives.cc New PoA Standards  Standard for demonstration of additionality, development of eligibility criteria and application of multiple methodologies for Programme of Activities -Approved EB 65  Also relevant: Standard for sampling and surveys for CDM project activities and programmes of activities -Approved EB 65 2

3 www.perspectives.cc · info@perspectives.cc Key challenges of PoA standards - timing  Deadline of 25 July for uploading for registration -226 PoAs in validation* -15 PoAs submitted in February -Average time for start of comment period to requesting registration: 255 days, approximately 8.5 months -Average time from requesting registration until registration: 100 days (approximately 3.3 months) -= Already a tight schedule for being registered by 2012 -High number of PoAs in non- LDCs: 32 PoAs in China, 27 in South Africa, 22 in India, 12 in Indonesia, 10 in Kenya  Compliance with the standards adds further complications/ possible delays to validation 3 * March 2012 CDM Pipeline, UNEP Risoe

4 www.perspectives.cc · info@perspectives.cc Key challenges of PoA standards - Implementation  Co-ordinating & Managing Entity (CME) Manual -Useful document for thinking long term -But adds significant complications during validation -20 – 40 page document -Adds a substantial amount of extra work (and therefore adds to the cost) during validation which adds to the 2012 time pressure -Currently no precedence for a CME manual -A standardized optional template would be useful for facilitating writing and validation 4

5 www.perspectives.cc · info@perspectives.cc Sampling and survey standards  Single sampling plan covering a group of Component Project Activities (CPAs) now allowed -For micro or small scale PoAs applying a 95/10 confidence/precision -When there is either homogeneity of included CPAs or the differences among the included CPAs is taken into account in the sample size calculation -Highly relevant for i.e. energy efficient lighting and cookstove PoAs  Reduces transaction costs by not needing to sample each and every CPA  Very positive step: remains to be seen how DOEs apply the standards during validation 5

6 www.perspectives.cc · info@perspectives.cc © 2012 Perspectives GmbH Thank you! Courtney Blodgett Blodgett@perspectives.cc +49 (0)40 399 99 06 53


Download ppt "· © 2012 Perspectives GmbH PoA Standards Courtney Blodgett Joint Coordination Workshop, Bonn 24 March 2012."

Similar presentations


Ads by Google