Download presentation
Presentation is loading. Please wait.
Published byMarjory Griffin Modified over 9 years ago
1
LBT Q1 2007 Engineering Review PSPI: PEPSI installation preparation, includes all of the pier modifications
2
2 Highlights (Q1/2007) Install conduit for FO Install conduit for FO Install LIU at bridge location Install LIU at bridge location Install 36 fiber FO cable computer room to PEPSI bridge Install 36 fiber FO cable computer room to PEPSI bridge
3
3 Open Issues Technical Technical Painting floor and walls Painting floor and walls Schedule Schedule Not yet Not yet Financial Financial None None Resource Resource Identify paint and paint contractor Identify paint and paint contractor
4
4 Progress (Q1/2007) Fiber optic cable and conduit has been installed Fiber optic cable and conduit has been installed LIU is installed LIU is installed
5
5 Planning (Q2/2007) Terminate fibers Terminate fibers Define and install the connection point box Define and install the connection point box Install some services Install some services
6
6 Planning (before 2008) Install services Install services install E-net, install E-net, install E-stop install E-stop install telephone install telephone install cooling water, 47 deg install cooling water, 47 deg install clean, dry air install clean, dry air install power and conduit install power and conduit Move florescence lights up to 4 M Move florescence lights up to 4 M Insulate all pipe carrying liquids Insulate all pipe carrying liquids Move J box up to 4 M Move J box up to 4 M Epoxy paint entire floor Epoxy paint entire floor Paint walls with epoxy paint Paint walls with epoxy paint Install the support brackets on the telescope gallery Install the support brackets on the telescope gallery
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.