1 26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler

2 26 September 2000 Fowler Duke HEP Sense Wire Procurement  Luma, Osram and Toshiba wires were evaluated  Toshiba was considered the highest quality from initial test  Two pre-series of wire have been procured from Toshiba  Both have been evaluated  One has been approved and is being used in production  Full production order being submitted  Audit of facility tentatively scheduled for Oct 2000

3 26 September 2000 Fowler Duke HEP Evaluate Cleaning Effects  Evaluate the affects of cleaning the wire in ultrasonic cleaner after wire joint process  First evaluate any damage to the wire due to the cleaning  Second evaluate the effectiveness of the cleaning process  Samples were evaluated uncleaned, after 30 seconds, 1 minute, 5 minutes, and 10 minutes  30 seconds was found to be as effective as longer cleanings

4 26 September 2000 Fowler Duke HEP Cleaning Results Uncleaned 30 seconds

5 26 September 2000 Fowler Duke HEP Cleaning Results 1 minute5 minutes

6 26 September 2000 Fowler Duke HEP Cleaning Results 10 minutesAnalysis of dark area

7 26 September 2000 Fowler Duke HEP Mass Spectrograph of “Dark Area”

8 26 September 2000 Fowler Duke HEP Diameter Analysis

9 26 September 2000 Fowler Duke HEP Evaluate Wire for Damage  Evaluate any damage of wire outside of the glass bead during the fusing process  No damage has been detected  Further testing will follow  Also evaluating the cleanliness of wire after the production process

10 26 September 2000 Fowler Duke HEP Production and Wire Analysis Results  Actual Wire Joints produced - 4606 single, 270 double  Planned Wire Joints - 6500 single, 600 double  Second wire joint station online in November 2000  Production goal 120 to 150 daily  Wire meets specification based on our testing  More studies on cleanliness after production planned


Download ppt "26 September 2000 Wire Procurement and Wire Joint Production Jack Fowler."