Download presentation
Presentation is loading. Please wait.
Published byOsborne Parker Modified over 9 years ago
1
Neponset Watershed CIC Grant Task 7: Regional O&M Database Framework for a cloud-based tool for stormwater management operations & maintenance plan development, reporting, enforcement, and public records access
2
User Types Local permitting authority – View reporting history – Issue enforcement orders Owner / Operator – Create O & M plan based on template – Report O & M activity Public Users – View O & M plans – View reporting history
3
Owner/Operator: Create O&M Plan Record Specify local permitting authority Project name Parcel numbers (pre- & post subdivision) Watershed / subwatershed (auto generated) Legally responsible party Reporting point of contact Spill prevention / emergency contact Registry of Deeds book & page
4
File Uploads – O & M Plan PDF site plan of stormwater system (as-built) CAD, shapefile, or KMZ of system (as-built) PDF of final permit documents: – Order of Conditions – Stormwater permit – Special Permit – Subdivision Approval
5
O & M Plan Template: BMP list Select BMP type (bioretention, hydro separator, retention basin, etc) Indicate number of BMPs on-site Text field describing location / function Boilerplate inspection requirements (editable) Boilerplate maintenance requirements (editable) Confirm schedule of BMP tasks Specify start date and milestone dates
6
Plan Template: BMP Task Matrix BMP TypeFrequencyTaskTask Type Sweeping QuarterlySweeping Maintenance Hydro Separator AnnualClean-out Maintenance General WeeklyInspect Parking Lot Inspection Bioretention BiannualMulch Maintenance
7
Plan Template: Pollution Prevention Select materials covered – Multiple choice (& “other, specify”) Boilerplate materials management plan (editable)
8
Plan Template: Export & Finalize Export O &M Plan as MS Word document Local authority review Edit plan template online Export final O & M plan as PDF and upload to site Municipal user “locks” O & M activities template once plan is approved
9
Owner/Operator: Reporting Module Swear by pains of perjury that this is an accurate record of inspection and maintenance SUBMIT BMP TypeTaskDue DateDescriptionCorrective Action Status Hydro Separator Clean-out 1/1/15 CleanedNoneDelayed General Inspect Parking Lot 12/15/14 Inspected Picked up trash Not Complete Sweeping 11/1/14 SweptNone Not Complete BioretentionMulch 1/1/15 Maintained Replanted & mulched Complete
10
Municipal User: Overview Plan #AddressOwnerView Report GradeView Enforcement View Plan Owner/ Operator Details 5003 Main St3M LLC 95% 5012 Oak DrJones 60% 50251 Elm StWendy’s 100% 5032 1 st AveFrank 89% “Grade” is percent of maintenance & inspection requirements completed and reported on-time within past 21 months
11
Municipal User: Plan Report Plan # 500; 3 Main Street; 3M LLC “Issue Enforcement” generates boilerplate letter/email to Owner/Operator point of contact BMP TypeTaskDue DateDescriptionCorrective Action StatusIssue Enforcement Hydro Separator Clean-out 1/1/15 CleanedNoneDelayed General Inspect Parking Lot 12/15/14 Inspected Picked up trash Not Complete Sweeping 11/1/14 SweptNone Not Complete Bio- retention Mulch 1/1/15 Maintained Replanted & mulched Complete
12
Alerts Owner / Operator: Due date approaching – 1 week in advance, 1X Owner / Operator: Due date passed – Weekly digest Municipal Staff: New report submitted – As submitted Municipal Staff: Reports overdue – Weekly digest
13
Public Users: Overview & Plan Report Plan #AddressOwnerView Report GradeView Enforcement View Plan Owner/ Operator Details 5003 Main St3M LLC 95% 5012 Oak DrJones 60% 50251 Elm StWendy’s 100% 5032 1 st AveFrank 89% Plan # 500; 3 Main Street; 3M LLC “Issue Enforcement” generates boilerplate letter/email to Owner/Operator point of contact BMP TypeTaskDue DateDescriptionCorrective Action StatusIssue Enforcement Hydro Separator Clean-out 1/1/15 CleanedNoneDelayed General Inspect Parking Lot 12/15/14 Inspected Picked up trash Not Complete Sweeping 11/1/14 SweptNone Not Complete Bio- retention Mulch 1/1/15 Maintained Replanted & mulched Complete
14
All Users: Interactive Map Report “Grade” Good (>90%) Fair (70% - 90%) Poor (<70%) 18 Unquity Road Reporting Rate: 65% Owner: Milltown LLC View Plan Report
15
Next Steps Refine desired functionality Develop website specifications Prepare RFP
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.