Presentation is loading. Please wait.

Presentation is loading. Please wait.

Update for 2011 ITRC Spring Anna Willett ITRC Director 2011 ITRC Spring Meeting Minneapolis, MN, April 4-8, 2011.

Similar presentations


Presentation on theme: "Update for 2011 ITRC Spring Anna Willett ITRC Director 2011 ITRC Spring Meeting Minneapolis, MN, April 4-8, 2011."— Presentation transcript:

1 Update for 2011 ITRC Spring Anna Willett ITRC Director 2011 ITRC Spring Meeting Minneapolis, MN, April 4-8, 2011

2 2 2011 ITRC Membership (Ongoing)

3 3 2011 State/Local Gov’t ITRC Membership Total State/Local ITRC Members = 162  CA – 18  NJ – 13  DE, FL – 7  MN, MO, OK, WY – 6  AL, MI, PA, SC, TX, UT - 5 States with no ITRC state/local gov’t members: DC, IA, ID, MT, NM

4 4 2009-2011 Budget Summary Budget vs. Planned Income The ITRC budget is approximately 1/3 DOE funding 1/3 DOD funding 1/4 IAP + misc 1/10 EPA

5 5 Industry Affiliates Program (IAP)  65 IAP members (ongoing)  2011 revenue is $341,250 (ongoing)

6 6 2011 ITRC Teams 1.Biochemical Reactors for Mine Influenced Water - NEW 2.Contaminated Sediments – Remediation - NEW 3.Groundwater Statistics and Monitoring Compliance - NEW 4.Environmental Molecular Diagnostics (EMD) –CLOSING 2012 5.Incremental Sampling Methodology (ISM) – CLOSING 2012 6.Biofuels – CLOSING 2011 7.Green & Sustainable Remediation (GSR) – CLOSING 2011 8.In Situ Stabilization and Solidification (ISS) – CLOSING 2011 9.Integrated DNAPL Site Strategy (IDSS) – CLOSING 2011 10.Permeable Reactive Barriers – CLOSING 2011 11.Contaminated Sediments – CLOSING Spring 2011

7 7 2010 Products Project/Team Overview Document Tech Reg Document Internet Based Training Course UXO Wide Area Assessment ● Mass Flux (Integrated DNAPL Team) ●● Mining Waste●● Natural Attenuation of Metals and Radionuclides ●● 4 documents, 3 training courses

8 8 2011 Products - 10 documents, 8 training courses Project/Team Overview Document Tech Reg Document Internet Based Training Course LNAPL Classroom Training Course ● (classroom) Remediation Risk Management ●●● Contaminated Sediments - Bioavailability ●● Green & Sustainable Remediation ●●● Permeable Reactive Barriers ●●

9 9 2011 Products Project/Team Overview Document Tech Reg Document Internet Based Training Course Solidification/Stabilization●● Biofuels●● Integrated DNAPL Site Strategy ●● Environmental Molecular Diagnostics ● 10 documents, 8 training courses

10 10 ITRC Training Totals

11 11 Breakdown of Overall Training Totals Type# State/Local Government24,822 U.S. EPA2,979 U.S. DOD3,958 U.S. DOE1,073 Other Federal Agency879 Consultant/Engineering30,796 Community Stakeholder207 Site Owner1,472 Technology Vendor620 Academia819 Other2,991 TOTAL70,616

12 12 Vapor Intrusion Classroom Training  Course Overview How to conduct site screening and investigations How to collect quality data and evaluate the results Apply multiple lines of evidence to ensure quality decision making Understand and implement mitigation options “Vapor Intrusion Pathway - A Practical Guideline” 4 offerings in 2011– TX, NJ, MI, CO

13 13 2010 State Engagement Program Accomplishments  46 Points of Contact (POCs)  32 states provided environmental priorities  43 states reviewed and rated 2011 ITRC project proposals  ITRC POCs: Reviewed 7 documents Participated in 3 internet-based training dry runs Responded to 3 surveys on technical topics Participated in 7 project technical & implementation sessions Initiated or contributed to 4 project proposals Identified 40 ITRC success story leads Assisted with team leader and member recruitment

14 14 2012 Project Proposal Process  ITRC received 12 proposals for 2012 projects  Focused discussions with states and funders on specific project ideas  Idea session at the 2010 SERDP Symposium  ITRC selected 7 proposals to move forward in the evaluation process (see meeting book)  April - June 2011: ITRC member input on proposals  June – July 2011: voting ITRC Board of Advisors members rank proposals for funding preference based on member input and other criteria  August 2011: ITRC Board of Advisors meeting to finalize draft 2012 budget

15 15 2011-2012 ITRC Meetings 2011 ITRC Meetings:  Kick-off Meeting – Asilomar, CA  Spring Meeting – Minneapolis, MN  Board Meeting – Portland, ME  Fall Meeting – Denver, CO Planned 2012 ITRC Meetings  Kick-off Meeting – TBD  Spring Meeting – Montgomery, AL  Board Meeting – West Coast  Fall Meeting – Midwest location (Chicago, Des Moines, Omaha)

16 16


Download ppt "Update for 2011 ITRC Spring Anna Willett ITRC Director 2011 ITRC Spring Meeting Minneapolis, MN, April 4-8, 2011."

Similar presentations


Ads by Google