Download presentation
Presentation is loading. Please wait.
Published byAldous Booth Modified over 9 years ago
1
Technical Specification April 23rd-24th 2013Handling Engineering Group1 Technical documents during tender Contract execution Documents during contract Technical requirements
2
Technical Documents during Tender April 23rd-24th 2013Handling Engineering Group2
3
Contract Execution April 23rd-24th 2013Handling Engineering Group3
4
Contract Execution April 23rd-24th 2013Handling Engineering Group4
5
Contract Execution April 23rd-24th 2013Handling Engineering Group5
6
Contract Execution April 23rd-24th 2013Handling Engineering Group6
7
Contract Execution April 23rd-24th 2013Handling Engineering Group7
8
Contract Execution April 23rd-24th 2013Handling Engineering Group8 Sorting of waste from radioactive areas: CERN Radiation Protection will provide waste containers 1000 x 1200 x 650 high. These containers will be lined with a vinyl sheet to allow wrapping of waste before it is transported. Contractor to sort waste: Metal Electrical cables (cut into 1m lengths) Oil (CERN will provide liquid containers) Electrical cubicles (no dismantling of individual cubicles) Old trolley structure will not need to be cut up The contractor shall allow for cost of wrapping waste in vinyl (CERN will provide vinyl).
9
Contract Execution April 23rd-24th 2013Handling Engineering Group9
10
Contract Execution April 23rd-24th 2013Handling Engineering Group10
11
Contract Execution April 23rd-24th 2013Handling Engineering Group11
12
Contract Execution April 23rd-24th 2013Handling Engineering Group12
13
Documents during Contract April 23rd-24th 2013Handling Engineering Group13
14
Documents during Contract April 23rd-24th 2013Handling Engineering Group14
15
Documents during Contract April 23rd-24th 2013Handling Engineering Group15
16
Documents during Contract April 23rd-24th 2013Handling Engineering Group16
17
Technical Requirements April 23rd-24th 2013Handling Engineering Group17
18
Technical Requirements April 23rd-24th 2013Handling Engineering Group18
19
Technical Requirements April 23rd-24th 2013Handling Engineering Group19
20
Technical Requirements April 23rd-24th 2013Handling Engineering Group20
21
Technical Requirements April 23rd-24th 2013Handling Engineering Group21
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.