Download presentation
Published bySharleen Bryan Modified over 9 years ago
1
Electrical stations, switch rooms and server rooms
Raised Access Floors Electrical stations, switch rooms and server rooms
2
Raised Floor Pedestals
Head plate For screwing of panels and stringers For fixing of the pedestal bracing For fixing of the gasket For fixing of the gasket Fixing of standard stringer Hole for locking glue
3
Reinforcement profiles
Overview CL 41 x 40 x 1 CM 84 x 40 x 1.7 CH 126 x 40 x 2 CS 41 x 40 x 1.7 Profile dimensions
4
C – Profiles Advantages: Easy installation
Huge time saving with spring clip installation Standard range of pedestals Product is protected by utility patent
5
High Strength Reinforcement Profiles Fixing
Variant 1: Install spring clip from below into the slot Turn of 90° clockwise Also with deinstallation!
6
High Strength Reinforcement Profiles Fixing
Variant 2: Install hammer head screw from below into the slot Rotate screw 90° and tighten it
7
High Strength Reinforcement Profiles Panel support
Fixing gasket: Support of the raised floor panels Fixing gasket with four noppes for supporting the corners of the panel
8
High Strength Reinforcement Profiles Parallel and cross connectors
Connection of reinforcement profiles: Cross connector: - Connection on the reinforcement profile with drilling screws - Connection of the crossing reinforcement profile with drilling screws
9
High Strength Reinforcement Profiles Parallel and cross connectors
Connection of reinforcement profiles: Parallel connector: - Connection on the reinforcement profile with drilling screws - Connection of the additional reinforcement profile with drilling screws
10
Reinforcement profiles
11
Switchgear Construction for Server / Control Rooms
Installation frame Panel Reinforcement profile System solution: Placing of the pedestals (grid acc. to plan) Installation of the reinforcement profiles regardless the later position of the control resp. Server cabinets Mounting of a installation frame: Support structure for later installations Position of the frame anywhere possible Keeping of the floor grid by displacing the installation frame by the half of the switchgear width - No cut panels necessary with the positioning of the installation frame in the grid
12
Switchgear construction Later conversion
Flexibility with change of use: Replacing of switchgear cabinet / server is easily possible Replacing of the installations in the panel grid: - Replacing of the installation frame in a different grid field - Closing of the previous opening with the panel which were taken out of the new opening - Replacing and cabling of the equipment
13
Switchgear construction Later conversion
Flexibility with change of use: - Replacing of the installation frame in any desired position regardless the panel grid - Fixing of the installation frame with cross resp. longitudinal connectors - Closing of the previous opening with the panel which were taken out of the new opening - If necessary, cut panels have to be supported with additional reinforcement profiles - Replacing and cabling of the equipment
14
Switch Room Construction
for server rooms / switch rooms Application area: With high loads In computer centres or switch rooms With high construction heights of the system floors With dynamic loads
15
Thank you for your attention!
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.