Network Background August 2006
2
1 Topics Services Connected Institutions Architecture Operations Finances/Co-pay Looking Forward Services Connected Institutions Architecture Operations Finances/Co-pay Looking Forward
3
2 K-20 Services Washington State Education Intranet –Distance Learning –Research –Video Conferencing (including multi-point) –Business Applications and Business Continuity Internet Access –Internet & WWW –Internet 2 Washington State Education Intranet –Distance Learning –Research –Video Conferencing (including multi-point) –Business Applications and Business Continuity Internet Access –Internet & WWW –Internet 2
4
3 Currently Connected Institutions K-12 Locations306 Community & Technical College Sites72 Public Baccalaureate Sites40 Public Library Sites26 Telemedicine Sites19 Private College and University Sites7 Tribal Education Centers11 Correctional Facilities3 TOTAL K-20 SITES:484 K-12 Locations306 Community & Technical College Sites72 Public Baccalaureate Sites40 Public Library Sites26 Telemedicine Sites19 Private College and University Sites7 Tribal Education Centers11 Correctional Facilities3 TOTAL K-20 SITES:484
5
4 Network Responsibilities K-20 ON-GOING COSTS Transport KOCO Maintenance Depreciation INSTITUTION ON-GOING COSTS Video maintenance & depreciation PCs & LANs Training Intra-district infrastructure ISP District/Campus Routers Institution Router K-20 Data Equipment Codec & Video Equipment District/Campus Video Equipment K-20 Network K-20 Network Control (KOCO)
6
5 K-12 (306) Community/Technical College (72) Public College/University (40) Tribal Education Center/ (11) (includes branch campuses)(includes branch campuses) Tribal College Library (26) Correctional Facility (3) Independent College/University (8) Telemedicine (19)
7
6 Carrier circuits provide protection switching SONET only Ring of Rings State manages protection Wave basis/MSPP Ring architecture Carrier circuits provide protection switching SONET only Ring of Rings State manages protection Wave basis/MSPP Ring architecture Current vs. NGN Architecture Current NGN
8
7 K20/DIS NGN Benefits Will efficiently and cost-effectively: –Create a resilient architecture – no single point of failure –Increase the robustness – better scaling –Reduces dependency on carrier’s ability to build resiliency in their networks –Allow state to leverage all state transport resources Will efficiently and cost-effectively: –Create a resilient architecture – no single point of failure –Increase the robustness – better scaling –Reduces dependency on carrier’s ability to build resiliency in their networks –Allow state to leverage all state transport resources
9
8 K-20 Operations Cooperative KOCO: DIS, UW, SBCTC Monitor Network & Server Status Troubleshoot Network Problems Coordinate Problem Resolution Provide & Analyze Network Performance Data Provide Technical Support Manage Video Switched Network and MCUs Schedule Multipoint Video Resources Program Office Support KOCO: DIS, UW, SBCTC Monitor Network & Server Status Troubleshoot Network Problems Coordinate Problem Resolution Provide & Analyze Network Performance Data Provide Technical Support Manage Video Switched Network and MCUs Schedule Multipoint Video Resources Program Office Support
10
9 Internet Traffic and Cost ISP cost per Mbps ISP traffic FY00 FY01FY02FY03FY04FY05 FY06 Mbps
11
10 Co-pay Basic Principles Co-pay for the same services is to be independent of geographic location Co-pay must compete with similar services in low-cost areas Co-pay must be independent of type of transport Co-pay must encourage proper management of resources Co-pay for the same services is to be independent of geographic location Co-pay must compete with similar services in low-cost areas Co-pay must be independent of type of transport Co-pay must encourage proper management of resources
12
11 Capacity vs. Usage Based Co-pay Capacity Based: –User charge based upon capacity provided Usage Based: –User charge based upon usage of the capacity provided, calculated at 95 th % 0 2 4 6 8 10 6 amnoon 6 pm midnight Mbps capacity (10 Mbps) usage (2.5 Mbps)
13
12 Co-pay for Data Circuits 95th Percentile Usage (Mbps) Quarterly Fee $- $625 $1,250 $1,875 $2,500 $3,125 $3,750 $4,375 $5,000 0.01.53.04.56.07.59.010.512.013.515.0
14
13 K-20 Board – Budget Responsibilities RCW 43.105.805 Prepare a budget for network development, operation, and expansion including: –Network transport and equipment –Co-payments for public entities connected to the network –Charges to non-governmental entities connected to the network Prepare a budget for network development, operation, and expansion including: –Network transport and equipment –Co-payments for public entities connected to the network –Charges to non-governmental entities connected to the network
15
14 K-20 Office Develops Draft Detailed Budget Budget Reviewed and Approved by NTSC and Finance Subcommittee Budget Development Process Technical Subcommittee Develops Network Design Updates Budget Recommended To K-20 Board Support Organizations Develop Support Costs Educational Sectors Assess 07-09 Needs
16
15 K-20 Operations Categories of Expense (07-09) Maintenance & Depreciation $7.3 M (27%) KOCO $9.0 M (34%) Transport $8.7 M (32%) Program Office $2.0 M (7%) $27 M in Expenses
17
16 K-20 07-09 Revenue Sources State General Fund$20.2 M Participant Co-Pay6.0 M Qwest (Libraries).8 M $27.0 M State General Fund$20.2 M Participant Co-Pay6.0 M Qwest (Libraries).8 M $27.0 M
18
17 K-20 Intranet Traffic 6000 5000 4000 3000 2000 0 1000 FY 00 FY 01 FY 02FY 03FY 04 FY 05FY 06 FY 07FY 08FY 09 billions of bytes
19
18 K-20 Expense 6000 5000 4000 3000 2000 0 1000 $ 60 M $ 50 M $ 40 M $ 30 M $ 20 M $ 0 $ 10 M FY 00 FY 01 FY 02FY 03FY 04 FY 05FY 06 FY 07FY 08FY 09 billions of bytes $ 27.8 M$ 27.0 M$ 28.2 M$ 26.3 M$ 27.0 M
20
19 State General Fund Requests 6000 5000 4000 3000 2000 0 1000 $ 60 M $ 50 M $ 40 M $ 30 M $ 20 M $ 0 $ 10 M FY 00 FY 01 FY 02FY 03FY 04 FY 05FY 06 FY 07FY 08FY 09 billions of bytes $ 22.8 M$ 22.6 M 1 $ 20.9 M$ 19.8 M 2 $ 20.2 M (1) includes $11.3 M provided by K-20 accumulated cash(2) includes $3 M Qwest Settlement Funds; $3.1 M K-20 accumulated cash
21
20 Capital Purchases Budget includes estimated 07-09 capital purchases –Replacement of aging network equipment –Continued phase-in of IP-based video –Equipment to support updated architecture and migration to high-speed Ethernet –Network management capabilities Purchases to be made from K-20 revolving fund (accumulated depreciation) Budget includes estimated 07-09 capital purchases –Replacement of aging network equipment –Continued phase-in of IP-based video –Equipment to support updated architecture and migration to high-speed Ethernet –Network management capabilities Purchases to be made from K-20 revolving fund (accumulated depreciation)
22
21 K-20 Revolving Fund (07-09) Estimated cash position 6/30/07$2.1 M Revenues –GF state appropriation20.2 M –Co-pay6.0 M –Qwest library funds0.8 M Operating expenses (less depreciation)(22.1 M) Capitalized purchases(4.7 M) Estimated cash position 6/30/09$2.3 M Estimated cash position 6/30/07$2.1 M Revenues –GF state appropriation20.2 M –Co-pay6.0 M –Qwest library funds0.8 M Operating expenses (less depreciation)(22.1 M) Capitalized purchases(4.7 M) Estimated cash position 6/30/09$2.3 M
23
22 Looking Forward Board Subcommittee for Program –Biennial report –Value stories –New website; education focused FY08/FY09 Budget Process –Approved by the K-20 Board –Will submit to OFM in August Next Generation Network –Procurement Summer & Fall 2006 –Construction Winter 2006; Transition 2007 Board Subcommittee for Program –Biennial report –Value stories –New website; education focused FY08/FY09 Budget Process –Approved by the K-20 Board –Will submit to OFM in August Next Generation Network –Procurement Summer & Fall 2006 –Construction Winter 2006; Transition 2007