Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Tool 1 Health & Performance Check
2
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Tool 1: Health & Performance Tool 2: Cost/Benefit Tool 3: WORX for SMes Tool 4: Skills (contractor) Tool 5: Skills (operator) Tool 6: Ergo-Check Tool 7: Sitting- Check COMFOR educative packages
3
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Tool 1: Health & Performance Check The tool helps you to monitor and manage your machine operators' health situation their level of performance. This is necessary to observe and act upon changes that might impede production.
4
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Structure of tool The tool consists of four parts: 1.An operator questionnaire 2.A contractor logbook 3.A result presentation 4.Values for Tool 2
5
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 To install the tool 1.Save a copy of tool on hard disc 2.Open Excel and tool 3.Push ‚Enable Macros‘ in window which opens → 4.Set ‚security level‘ to medium
6
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 To set security level in Excel a)Open menu ‚Tools‘ b)Choose ‚Macros ‘ Security... c)Choose ‚Medium‘ under tag: ‚Security level‘ in window which opens → d)Push ‚OK‘
7
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Data collection template Working hours Complaints Accidents or near accidents Recovery Sickness Performance Counter measures Other circumstances Questions reflecting:
8
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Managers data input sheet Insert date for data collection Adjust for current number of operators Enter data from questionnaires 6.When do you consider yourself fully recovered after work? (1) After a night's rest (2) After a week-end (3) After a week off or more (4) After a longer vacation (5) Practically never
9
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Managers data input sheet Insert date for data collection Adjust for current number of operators Enter data from questionnaires into appropriate cells
10
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Managers data input sheet Insert date for data collection Adjust for current number of operators Enter data from questionnaires into appropriate cells Results will be calculated automatically
11
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 IMPORTANT 1 ! The analysis program will not work correctly, if you do not specify the ‘number of working hours last week’ in row 23 for each operator: 231 Working hours last week 424736125511
12
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 IMPORTANT 2 ! The analysis program will not give the correct values for Tool 2: Cost/Benefit-Check unless you enter in row 22 for each operator whether he is mainly a harvester or mainly a forwarder operator. 22 Operating: harvester (1), forwarder (2) 122211
13
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Contractor’s log book 1.The number of periods must correspond to the number of periods in ‘Data input’. 2.Document ill health and lost performance in the blue fields with data from own records.
14
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Contractor’s log book 3.Record circumstances of importance in the blue field THE PERIODS WERE CHARACTERIZED BY: Period 1: Period 2: Period 3: Period 4: Period 5: These records are important for estimation of costs and working out preventive measures.
15
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Contractor’s log book HARVESTER Period 1Period 2Period 3Period 4Period 5 Number of harvester operator sick days: thereof with replacement:321002 thereof without replacement (machine stand still):55555 Salary for replacement harvester operator: (in % of salary for ordinary operator) 120 130120 Performance of replacement harvester operator: (in % of performance of ordinary operator) 90 85 90 4.Enter data for harvester and forwarder operators
16
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Collection of ideas 5.Document information from questions 10 and 11 Best means to improve health and performance? Other important circumstances?
17
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Longitudinal follow up Check once more! that all operators has a value for ‘number of working hours last week’ in row 23 on the 'Data input' sheet. make sure that every new period is labeled in the first column of the period on row 19 on the ‘Data input’ sheet.
18
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Colour key to results Green No action needed. All operators have chosen the most positive answer. Light yellow Action might be necessary within time Dark yellow Action must be taken soon Orange Action must be taken immediately Red Severe problem. Action must be taken immediately
19
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Interpretation of results Identify: 1.Company strengths green cells 2.Company weaknesses red cells dark yellow cells … to target the ergonomic investments!
20
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Result tables Question 3: Shoulders Mar 08Jun 08Sep 08Dec 08Mar 09 Never01111 A few times per month32132 A few times per week30200 Almost every day01122 Every day01111 No. of operator questionnaires that the analysis is based on Mar 08Jun 08Sep 08Dec 08Mar 09 No. of questionnaires65676 Discuss (for each result table): 1.How is the trend? 2.What might lay behind the figures? 3.What measure might improve the situation? (Consult previous sheet) 4.What is the cost of the measure? 5.How effective might it be?
21
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Values for Tool 2 IMPORTANT! In order to get correct values the number of data periods related to the last twelve months have to be entered in cell D8.
22
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Decisions table Specify after discussion for each measure 1.Costs 2.Goal 3.Indicators 4.Responsible person 5.Involved persons 6.Starting date 7.Finishing date 8.Follow up and close
23
Ewa Lidén Kassel Project No. 030300-2 Presentation 2009 Tool 1: Health & Performance Check Field of applicationManage machine operators' health situation and level of performance Type of toolLongitudinal monitoring and analysing instrument, basis for decisions DocumentsExcel-file Frequency (recommended) Every 3 rd month