Download presentation
Presentation is loading. Please wait.
Published byLeo Ferguson Modified over 9 years ago
1
Profiler
2
2 07.09.2015 17:39 2 1 WebService 2 IconNMR Configuration 5 SampleTrack Order Setup Using a Super Method 6 SampleTrack Order Setup manually 7 PrepGilsonST 8 IconNMR BestNMR 3 PrepGilsonST Configuration Contents 4 SampleTrack Configuration
3
Profiler 3 07.09.2015 17:39 3 Instruments IconNMRSoftwareName + Key PrepGilsonSoftwareName + Key MSSoftwareName + Key InstrumentName = IconNMRSoftwareName Key=IconNMRSoftwareNameKey ResourceName = Gilson1 InstrumentName = PrepGilsonSoftwareName Key=PrepGilsonSoftwareNameKey ResourceName = Gilson1 InstrumentName = MSSoftwareName Key=MSSoftwareNameKey ResourceName = Gilson1 Gilson1 Configuration DB Table Resources: Web Service Gilson1 NMR Spectrometer MS MicroTOF Spectrometer Configuration Transfer Line
4
Profiler 4 07.09.2015 17:39 4 Configuration
5
Profiler 5 07.09.2015 17:39 5 IconNMR Configuration – SampleTrack Options SampleTrack Options: WebService URL IconNMR Software Name Gilson Resource Name
6
Profiler 6 07.09.2015 17:39 6 IconNMR Configuration – Master Switches Master Switches: “Metabolic Profiler“ is set as the default Automation Mode BEST-NMR is enabled “Metabolic Profiler“ is selected as BEST-NMR automation mode.
7
Profiler 7 07.09.2015 17:39 7 Configuration
8
Profiler 8 07.09.2015 17:39 8 PrepGilsonST Configuration Settings Edit Settings: WebService URL Name of this Application Gilson Instrument Name
9
Profiler 9 07.09.2015 17:39 9 Configuration
10
Profiler 10 07.09.2015 17:39 10 SampleTrack Configuration
11
Profiler 11 07.09.2015 17:39 11 SampleTrack Configuration
12
Profiler 12 07.09.2015 17:39 12 SampleTrack Configuration
13
Profiler 13 07.09.2015 17:39 13 SampleTrack Configuration
14
Profiler 14 07.09.2015 17:39 14 SampleTrack Order Setup Select Metabolic Profiler in the left tree view. Click the new order button to start the Metabolic Profiler wizard.
15
Profiler 15 07.09.2015 17:39 15 SampleTrack Order Setup Supermethod
16
Profiler 16 07.09.2015 17:39 16 Follow the wizard step by step. SampleTrack Order Setup Supermethod
17
Profiler 17 07.09.2015 17:39 17 Follow the wizard step by step. SampleTrack Order Setup Supermethod
18
Profiler 18 07.09.2015 17:39 18 SampleTrack Order Setup Supermethod Follow the wizard step by step.
19
Profiler 19 07.09.2015 17:39 19 Using a ‘Supermethod‘ shortens the setup time. To enter all method steps manually, click here and follow the steps. SampleTrack manual Order Setup SampleTrack Order Setup Supermethod
20
Profiler 20 07.09.2015 17:39 20 The order details are summarized. SampleTrack Order Setup Supermethod
21
Profiler 21 07.09.2015 17:39 21 Click ‘Finish‘ to end the order setup or start further orders. SampleTrack Order Setup Supermethod
22
Profiler 22 07.09.2015 17:39 22 Sample order ‘mysampleID0001‘ is set automatically to verified and is ready for preparation with the Gilson System. SampleTrack Order Setup Supermethod
23
Profiler 23 07.09.2015 17:39 23 PepGilsonST reads the open order from the Web Service Interface and starts the preparation SampleTrack Order Setup Supermethod
24
Profiler 24 07.09.2015 17:39 24 SampleTrack Order Setup Manually
25
Profiler 25 07.09.2015 17:39 25 SampleTrack Order Setup without a Supermethod
26
Profiler 26 07.09.2015 17:39 26 SampleTrack Order Setup without a Supermethod
27
Profiler 27 07.09.2015 17:39 27 SampleTrack Order Setup without a Supermethod
28
Profiler 28 07.09.2015 17:39 28 SampleTrack Order Setup without a Supermethod
29
Profiler 29 07.09.2015 17:39 29 SampleTrack Order Setup without a Supermethod
30
Profiler 30 07.09.2015 17:39 30 SampleTrack Order Setup without a Supermethod
31
Profiler 31 07.09.2015 17:39 31 SampleTrack Order Setup without a Supermethod
32
Profiler 32 07.09.2015 17:39 32 SampleTrack Order Setup without a Supermethod
33
Profiler 33 07.09.2015 17:39 33
34
Profiler 34 07.09.2015 17:39 34 Select “Profiler preparation“. Click OK. Start PrepGilsonST program with a double click. PrepGilsonST Start
35
Profiler 35 07.09.2015 17:39 35 The program shows trhe status of the system: connected with Gilson and running connected with Gilson and finished disconnected PrepGilsonST Status
36
Profiler 36 07.09.2015 17:39 36 The NMR experiment is being prepared.
37
Profiler 37 07.09.2015 17:39 37 The first preparation is finished and the second preparation (MS) is running.
38
Profiler 38 07.09.2015 17:39 38 Both preparations are finished.
39
Profiler 39 07.09.2015 17:39 39
40
Profiler 40 07.09.2015 17:39 40
41
Profiler 41 07.09.2015 17:39 41
42
Profiler 42 07.09.2015 17:39 42
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.