Presentation is loading. Please wait.

Presentation is loading. Please wait.

30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Welcome SI Sustainability Trainers Adobe Connect Forum 1: 9.30-10.30am 30 April.

Similar presentations


Presentation on theme: "30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Welcome SI Sustainability Trainers Adobe Connect Forum 1: 9.30-10.30am 30 April."— Presentation transcript:

1 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Welcome SI Sustainability Trainers Adobe Connect Forum 1: 9.30-10.30am 30 April TODAY’S AGENDA: Welcome and overview of agenda Project Update – revised timetable, deadlines, what should be done by now Project Plan – feedback overview, questions/ comments Support – Roles (Lisa, Evelyn, Jeffrey, Paulis); Wiki & peer support; Sub groups & first F2F meeting. Project Report – basis for F2F meeting discussions. Overview (Lisa); Sample case studies (Jeffrey). Final reports due – 25 June Online program/ BSB sustainability units/ assessment (Evelyn) Comments / where to from here.

2 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 PROJECT UPDATE – Revised Timetable

3 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Key Deadlines: 23 April – plans should all be in, 30 April - individual feedback provided on all plans/ College Director sign off on your plan Sub Gp Meeting 1 – (mid May) – mid term project reports in 25 June – projects completed, final reports due. by now you should have: been contacted by Lisa or Evelyn to discuss progress submitted your plan & received feedback had your plan signed off by your College Director had a look at the wiki and resources available on it checked key dates begun to establish support arrangements with other Sustainability Trainers in your industry area/ sub group – see sub group list on the wiki. Erica Dale PROJECT UPDATE – Deadlines/ what should be done by now

4 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Feedback Lisa/ Jeffrey. Comments Comments, questions, issues arising are now invited from the group Erica Dale PROJECT PLAN– Feedback & Comments

5 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 SUPPORT – Overview of roles/ facilitation & mentoring (Lisa)

6 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Support – Roles (Lisa, Evelyn, Jeffrey, Paulis); Wiki & peer support; Sub groups & first F2F meeting. Allan Lee SUPPORT ROLES – brief outline from: Evelyn Goodwin - project facilitator, co- facilitator of sub groups, key contact person for project, assessment Jeffrey Crass – sustainability technical expert, mentor, networks & resource person Paulis Cheung – technology expert, wiki, advice on moodle, wikis, online programs, blogs, Adobe Connect & accessing these

7 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Erica Dale Sub-groups & the first face to face sub-group meeting – NB For full details see Excel list of subgroups and timetable on wiki Sub group 1: Proposed first F2F Meeting dates: Sub Group 1 : 10am-12pm 10 May – Ultimo College Sub Group 2 : 2pm- 4pm 10 May – St George College Sub Group 3 : 10am-12pm 11 May – Ultimo or Enmore College NoTrainerTitleIndustry AreaCollege 1Cathie HilliardPart-time TeacherHospitalityLoftus 2Patricia LanePT TeacherOutreachPetersham 3Tony AucielloTeacherHairdressing & BeautyPetersham 4Alison BernasconiTeacherLanguageSt George 5Catherine PierceA/Head TeacherA/HT, Travel and HospitalitySt George 6Billeigh BrunjesTeacherHairdressing & BeautyUltimo 7Michele VenessTeacherAllied Health & Life SciencesUltimo

8 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Erica Dale Sub group 2: Sub group 3: NoTrainerTitleIndustry AreaCollege 1Deborah JohnstonPart-time TeacherGraphic DesignEnmore 2Robert ReidHT, Product DesignGraphic DesignEnmore 3Stanley TonkinsPart-time TeacherInformation TechnologyPetersham 4Christine WrightLibrarianInformation TechnologyRandwick 5Alan BoothPT/TeacherAccountingSt George 6Irene SimatosA/Head TeacherManagement & Small BusinessSt George NoTrainerTitleIndustry AreaCollege 1David CashmereHead TeacherConstruction/PlumbingGymea 2Steve NortonTeacherConstruction/BuildingGymea 3Ian UgarteHead TeacherPlumbingRandwick 4Christina TotsisTeacherBuilding ServicesSt George 5George LoupisTeacherArchitectural TechnologySt George 6Joseph FamularoHead TeacherTransport/LogisticsSt George 7Phillip CuomoHead TeacherAutomotiveSt George 8Felicity Le ClaireTeacherArchitecture / BuildingUltimo 9Irfan HaiTeacherElectro/RefrigerationUltimo 10Larry WestTeacherElectrical TradesUltimo

9 30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Project Reporting, BSB units & Assessment, Next steps Project Reporting: basis for F2F meeting discussions. Overview (Lisa); Sample case studies (Jeffrey). Mid Reports due at 1 st F2F sub group meeting – 10/11 May; Final reports due – 25 June Online program/ BSB sustainability units/ assessment (Evelyn): Sustainability online induction as a support/ training tool Sustainability units linked to program & assessment other sustainability units/ assessment options & process Comments / where to from here.


Download ppt "30 April 2010 © SI TAFE NSW Sustainability Trainer ADOBE CONNECT FORUM 1 Welcome SI Sustainability Trainers Adobe Connect Forum 1: 9.30-10.30am 30 April."

Similar presentations


Ads by Google