Download presentation
Presentation is loading. Please wait.
1
Lean Systems and Six-Sigma Quality
Chapter 10 Lean Systems and Six-Sigma Quality
2
Lecture Outline What is Lean? Lean Production Respect for People
Total Quality Management (TQM) Statistical Quality Control (SQC) Six-Sigma Quality Lean Six-Sigma Supply Chain
3
What is Lean? Lean is a management approach for creating value for the end customer through the most efficient utilization resources possible Standard in many industries Often results in: large cost reductions improved quality increased customer service
4
Lean Six Sigma Combines the approaches of Lean and Six Sigma Six Sigma
methodology to identify and eliminate causes of quality problems
5
Tenets of Lean There are six tenets of the Lean Philosophy:
Elimination of Waste eliminate all non-value adding activities A Broad View decisions made for the success of the entire supply chain all supply chain members responsible for adding value Simplicity the simpler the solution the better
6
Tenets of Lean Continued
Continuous Improvement emphasis on quality and continuous improvement called kaizen Visibility visible problems are identified and solved Flexibility easily switch from one product type to another, using flexible workers that perform many different tasks
7
Elements of Lean Lean is composed of three elements that work in unison: Lean Production Total Quality Management (TQM) Respect for People
8
Elements of Lean
9
Lean Production Coordinated system for producing the exact products desired, delivered in right quantities to where needed Just-in-Time The Pull System Visual Signals Small Lot Production Uniform Plant Loading
10
The Pull System Traditional approach Pull approach
supply chains work as “push” systems inventory carried to cover up problems Pull approach each stage in supply chain requests quantities needed from the previous stage no excess inventory generated reduced inventory exposes problems
11
Visual Signals Communication between workstations Kanban
“signal” or “card” in Japanese contains information passed between stations authorizes production
12
Visual Signals
13
Small Lot Production The amount of products produced at any one time is small reduces inventory and excess processing increases flexibility shortens manufacturing lead time responds to customer demands more quickly setup time must be low
14
Uniform Plant Loading Problem Uniform Plant Loading
demand changes are magnified throughout the supply chain contributes to inefficiency and waste Uniform Plant Loading production schedule is frozen for the month also called “leveling” helps suppliers better plan own production
15
Respect for People Respect for all people must exist for an organization to be its best flatter hierarchy than traditional organizations ordinary workers given great responsibility supply chain members work together in cross functional teams Look at Role of: workers, management, and suppliers
16
Role of Workers Workers have the ability to perform many different tasks and are actively engaged in pursuing company goals Worker Duties improve production process monitor quality correct quality problems Work in Teams quality circles
17
Role of Management Create the cultural change in the organization needed for Lean to succeed provide atmosphere of cooperation Empower workers to take action based on their ideas develop incentive system for lean behaviors
18
Role of Suppliers Lean builds long-term supplier relationships
companies partner with suppliers improve process quality information sharing goal to have single-source suppliers
19
Total Quality Management (TQM)
TQM is an integrated organizational effort designed to improve quality at every level Look at: Quality Gurus Voice of the Customer Costs of Quality Quality Tools ISO 9000
20
Quality Gurus
21
Voice of the Customer Quality is defined as meeting or exceeding customer expectations Determine customer wants: focus groups market surveys customer interviews
22
Costs of Quality
23
Quality Tools Lean requires workers to identify and correct quality problems Seven Tools of Quality Control: Cause and Effect Diagrams Flowcharts Checklists Control Charts Scatter Diagrams Pareto Analysis Histograms
24
Cause and Effect Diagrams
Identify causes of a quality problem sometimes called “fishbone diagrams”
25
Flowchart Diagrams the sequence of steps in an operation or process
26
Checklist Lists common defects and number of occurrences of the defects
27
Control Chart Determines whether a process is operating within expectations
28
Scatter Diagram Graph that visually shows how two variables are related to one another
29
Pareto Analysis Based on the premise that a small number of causes create the majority of problems identifies problems based on degree of importance
30
Histogram Chart that shows the frequency distribution of observed values of a variable
31
ISO 9000 “Family” of standards for quality management ISO 14000
increased international trade developed a need published by International Organization for Standards (ISO) in 1987 concerns measuring and documenting the quality process ISO provides a certification process ISO 14000 standards for environmental management
32
Statistical Quality Control (SQC)
SQC is the use of statistical tools to measure product and process quality Three categories: Descriptive Statistics describe quality characteristics Statistical Process Control (SPC) a random sample of output is used to determine if characteristics are acceptable Acceptance Sampling sample determines if whole batch is acceptable
33
Sources of Variation All processes have variation Assignable Variation
caused by factors that can be clearly identified and managed Common Variation inherent in the process also called random variation
34
Process Capability Process Capability evaluates the variation of the process relative to product specifications Product Specifications ranges of acceptable quality characteristics also called tolerances Process Variation all processes have natural variation defects are produced when variation exceeds product specifications
35
Process Variation Equal to Specification Range
36
Process Variation Exceeds Specification Range
37
Process Variation Narrower than Specification Range
38
Process Capability Index
where: USL = upper specification limit LSL = lower specification limit Cp Values: Cp = 1: process is minimally capable Cp ≤ 1: process is not capable of producing products within specification Cp ≥ 1: process exceeds minimum capability
39
Cp Example Given a process with three separate machines that are used to fill jars with pasta sauce. specification range is between 30 and 34 ounces process mean, μ, is 31 ounces Machine σ A 0.6 B 0.7 C 1.2 Calculate the Cp for each machine to determine capabilities
40
Cp Example Continued A: B: C:
Machine A has a Cp > 1, however the process mean is not centered
41
Cpk Example Cpk addresses the lack of centering of the process over the specification range Machine A: Cpk = min (1.66, 0.55) = 0.55
42
Process Control Charts
Graph that shows whether a sample of data falls within the common range of variation sample process output plot result on the control chart use to determine if process is in control can monitor: variables characteristics that can be measured attributes characteristics that can be counted
43
Process Control Charts
44
Control Charts for Attributes
A p-chart monitors the proportion of defective items in a sample centerline: average value of p across all samples, p UCL = p + z sp LCL = p – z sp where: z = standard normal variable p = sample proportion defective sp = = standard deviation of avg. proportion defective
45
# of Incorrect Procedures
P-Chart Example Given the following five samples of data tracking incorrect procedures in a hospital Sample # of Incorrect Procedures # Inspected Fraction Defective 1 10 0.1 2 3 0.2 4 5 Total 50
46
P-Chart Example Continued
p = 5/10 = 0.10 UCL = p + z sp = (0.095) = LCL = p + z sp = (0.095) = 0.185
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.