Page Avenue What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004 What has it done for the region? A comparison of traffic volumes from Fall 2003 to Fall 2004
2
Page History Identified as a need in late 1969 to early 1970 Design Public Hearing held June 1990 EIS approved November 1992 $350M in road construction began in July 1997 Identified as a need in late 1969 to early 1970 Design Public Hearing held June 1990 EIS approved November 1992 $350M in road construction began in July 1997
3
Page History Phase 1 - West of Interstate 270 to Route 94 (four lanes each direction with an auxiliary lane) is complete Phase 2 - Route 94 from east of Harvester to Route N. This project is not funded. Phase 3 - Rte. 94 at Rte. N to Route 40/61 (three lanes each direction). This project is not funded. Phase 1 - West of Interstate 270 to Route 94 (four lanes each direction with an auxiliary lane) is complete Phase 2 - Route 94 from east of Harvester to Route N. This project is not funded. Phase 3 - Rte. 94 at Rte. N to Route 40/61 (three lanes each direction). This project is not funded.
6
What Is The Goal Of Constructing Page Ave.? Provide immediate relief to traffic on US 40, I-70, and MO 370 by carrying about 60,000 vehicles per day at opening and 120,000 by 2020.
7
Has It worked? We have reason to celebrate!!! At the one year anniversary, Page Ave. is carrying nearly 50,000 (AADT), and 54,000 (AAWDT) Page Avenue, MO 364, is functioning as a congestion reliever for other routes between St. Louis and St. Charles Counties We have reason to celebrate!!! At the one year anniversary, Page Ave. is carrying nearly 50,000 (AADT), and 54,000 (AAWDT) Page Avenue, MO 364, is functioning as a congestion reliever for other routes between St. Louis and St. Charles Counties
8
March To November Growth We’ve seen a 38% increase in volumes on MO 364 from March 2004 to November 2004 Morning and evening rush periods carry about 40% of the total traffic on MO 364 Traffic patterns are still settling We expect some additional increase in traffic over a short period of time We’ve seen a 38% increase in volumes on MO 364 from March 2004 to November 2004 Morning and evening rush periods carry about 40% of the total traffic on MO 364 Traffic patterns are still settling We expect some additional increase in traffic over a short period of time
9
Route Fall 2003 (near the Missouri River) Fall 2004 (near the Missouri River) Decrease (%) I-70 186,773 165,079 21,694 (12%) Rte. 370 59,907 56,782 3,125 (5%) Rte. 40 85,183 77,523 7,660 (9%) Rte. 364 -- 49,969 -- Total Traffic Volumes
10
Total River Crossing Volume Total river crossings have increase by about 17,500 vehicles per day Trips being easier to make Trips are shorter for many people
12
Rush Hour Traffic Decreases A 26% decrease from 6-8 am on I- 70 (4600 vehicle decrease) A 23% decrease from 4-6 pm on MO 370 (2000 vehicle decrease) A 14% decrease from 6-8 am on MO 370 (1100 vehicle decrease) A 26% decrease from 6-8 am on I- 70 (4600 vehicle decrease) A 23% decrease from 4-6 pm on MO 370 (2000 vehicle decrease) A 14% decrease from 6-8 am on MO 370 (1100 vehicle decrease)
13
Rush Hour Traffic Decreases A 41% decrease in traffic on the ramp from EB 40 to NB 270 from 6-8 am (1300 vehicle decrease) A 50% decrease in traffic on the ramp from EB I-70 to SB I-270 from 6-8 am (3400 vehicle decrease) A 15% decrease in the traffic on the ramp from NB I-270 to WB I-70 from 4-6 pm (600 vehicle decrease) A 41% decrease in traffic on the ramp from EB 40 to NB 270 from 6-8 am (1300 vehicle decrease) A 50% decrease in traffic on the ramp from EB I-70 to SB I-270 from 6-8 am (3400 vehicle decrease) A 15% decrease in the traffic on the ramp from NB I-270 to WB I-70 from 4-6 pm (600 vehicle decrease)
14
Are There Still Congestion Points? A 276% increase in traffic on the ramp from NB I-270 to WB Page, carrying over 3000 vehicles, between 4-6 pm A 292% increase in traffic on the ramp from EB MO 364 to SB I-270, carrying over 3600 vehicles, between 6-8 am Traffic has also increased at MO 94 and Harvester in the rush periods A 276% increase in traffic on the ramp from NB I-270 to WB Page, carrying over 3000 vehicles, between 4-6 pm A 292% increase in traffic on the ramp from EB MO 364 to SB I-270, carrying over 3600 vehicles, between 6-8 am Traffic has also increased at MO 94 and Harvester in the rush periods
16
Future Improvements Upgrade to the interchange at I-270 and Page Avenue Flyover ramp from NB I-270 to WB MO 364 is currently being designed to alleviate congestion at the interchange Design complete in 2007, but project is currently unfunded Flyover ramp also being considered for SB I-270 to EB Page Avenue (RT D) Upgrade to the interchange at I-270 and Page Avenue Flyover ramp from NB I-270 to WB MO 364 is currently being designed to alleviate congestion at the interchange Design complete in 2007, but project is currently unfunded Flyover ramp also being considered for SB I-270 to EB Page Avenue (RT D)
17
Future Improvements Design of Phase 2 of Page Ave. extension is approximately 75% complete Design of Phase 3 of Page Ave. extension is approximately 80% complete Both Phase 2 and 3 are currently unfunded Design of Phase 2 of Page Ave. extension is approximately 75% complete Design of Phase 3 of Page Ave. extension is approximately 80% complete Both Phase 2 and 3 are currently unfunded
18
Are Phase 2 & 3 Still Needed? Without completion of Phase 2 and 3, I-70 will experience significant congestion Economic and environmental impacts could be significant Without completion of Phase 2 and 3, I-70 will experience significant congestion Economic and environmental impacts could be significant
20
Questions?