1 Summer 2010 Technology Projects

2 K-6 Pods 88 Pod Rooms - 352 Computers unboxed/imaged and installed in classrooms 88 Pod Rooms - 352 Computers unboxed/imaged and installed in classrooms Installed/Cabled network connections in all 88 classrooms Installed/Cabled network connections in all 88 classrooms Configured network switching for all classrooms as well as at the building level for both pods and IP Phones. Configured network switching for all classrooms as well as at the building level for both pods and IP Phones.

3 Voice Upgrades Installed over 400 New IP Phones at K-6 Installed over 400 New IP Phones at K-6 Updated Cisco CallManager (Phone System) and Cisco Unity(voice mail) servers Updated Cisco CallManager (Phone System) and Cisco Unity(voice mail) servers

4 MHS Labs Setup 5 business labs in MHS, 1 Adult Ed lab, 1 World Language lab, Math/Science Lab Setup 5 business labs in MHS, 1 Adult Ed lab, 1 World Language lab, Math/Science Lab Cabled for new connections and for changes in classroom layouts Cabled for new connections and for changes in classroom layouts Installed computers and tables in all rooms (256 computers,136 Tables) Installed computers and tables in all rooms (256 computers,136 Tables) Imaged computers with appropriate lab software Imaged computers with appropriate lab software Setup projectors and screens in MHS D106, D108, D110, D112, D114, CD102N, CD101S Setup projectors and screens in MHS D106, D108, D110, D112, D114, CD102N, CD101S

5 MHS B104, B110, B112, B114, A109, A111 Removed all computers and old tables Removed all computers and old tables New Carpet was installed in rooms and new computer tables were then installed (68 Tables) New Carpet was installed in rooms and new computer tables were then installed (68 Tables) Computers were re-installed into rooms, network connections were repaired and computers have been re- imaged with new updates. Computers were re-installed into rooms, network connections were repaired and computers have been re- imaged with new updates.

6 Moving around at Iddings and Miller All labs at Iddings and all classrooms with existing pods needed to be dismantled for installation of new carpet. All labs at Iddings and all classrooms with existing pods needed to be dismantled for installation of new carpet. Rooms at Miller needed to be dismantled in order for new carpet to be installed. Rooms are back together at this time. Rooms at Miller needed to be dismantled in order for new carpet to be installed. Rooms are back together at this time.

7 Software Updates and Installations All staff computers in K-6 have been updated with IE 8 and other needed updates to allow for operations of new software purchased for pods. The remaining buildings will be updated in the very near future. All staff computers in K-6 have been updated with IE 8 and other needed updates to allow for operations of new software purchased for pods. The remaining buildings will be updated in the very near future. Installation of Compass Odyssey servers and software Installation of Compass Odyssey servers and software Installation of FastMath software for pods Installation of FastMath software for pods Installation of Academy of Reading software for pods Installation of Academy of Reading software for pods

8 MHS Freshmen Center Labs updated with needed software for access to Plato PLE 2.0 updated with needed software for access to Plato PLE 2.0

9 Items planned for completion before the start of school Iddings is being worked on at this time and will be completed before the start of school. Pods, Phones, etc… Iddings is being worked on at this time and will be completed before the start of school. Pods, Phones, etc… Pierce Labs updated with needed software for access to Plato PLE 2.0 Pierce Labs updated with needed software for access to Plato PLE 2.0 Re-Image K-6 Labs Re-Image K-6 Labs Read 180 Rooms at MIS moved to new classrooms upstairs Read 180 Rooms at MIS moved to new classrooms upstairs

10 Upcoming Projects MIS Lab 101 New computers and furniture MIS Lab 101 New computers and furniture Kindergarten pod installation 19 Rooms Kindergarten pod installation 19 Rooms Freshmen Center Science lab computers (40) Freshmen Center Science lab computers (40) Projector/Document Camera install for grades 1-6 Projector/Document Camera install for grades 1-6 MCSC website upgrades MCSC website upgrades Incompatibility with old and new Plato at MHS Incompatibility with old and new Plato at MHS