ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid.

Similar presentations


Presentation on theme: "ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid."— Presentation transcript:

1 ATLAS Tracker Upgrade Stave Collaboration Workshop Oxford 6-9 February 2012 ABC 130 Hybrid

2 Overview First pass of the hybrid (and module) Proposed topology and geometry of hybrid Using realistic assumptions for asic geometries, hybrid build and layout Still some uncertainties Especially true for placement of SP bypass (and HV filtering) Proposal is to move off hybrid onto bus cable – is this possible? Hybrid now sits within the area of the sensor, no overlap Able to wire-bond to the bus cable? Use of 3 layer build hybrid without shield layer, does this matter? Hybrid LVDS Bus termination Propose making use of embedded resistors within ABC130 – no discretes Hybrid on Panel Testing, first pass.

3 ABC130 Hybrid/module - Topology & Geometry Assumptions Sensor geometry: 97.54mm x 97.54mm ABC130: 7.9mm x 6mm (target size) Width increased from 7.5mm to 7.9mm HCC: 3.5mm x 3.5mm (target size) Hybrid Detail Hybrid: 15mm x 97.5mm Sits within the area of the sensor – no overhang 3 layer build (top – down) Layer 1: Component + trace Layer 2: Trace + VDD + hatched GND Layer 3: GND Typically ≥100µm track & gap Two data loops of 5 x ABC130/loop 80MHz or 160MHz on hybrid data clocks Stave data rates of 160Mbs or 320Mbs Readout each end of a column – redundancy No SP Bypass circuitry on hybrid (+HV?) Propose attachment to the Bus cable Ideally ALL Hybrids to be identical 15mm 48.75mm 63.75mm Data Loop 0 Data Loop 1 Data I/O (Service side) Power Entry 0 1 2 3 4 5 6 7 8 9 HCC NTC

4 ABC130 Hybrid – Layer Detail Layer 1Layer 2 Layer 3 7.9mm 1.636mm ABC130 Data Paths 0508 Capacitor Array (4 x 100nF,10V, X7R) Front-end and Digital Decoupling Stave I/O Capacitor Bank for AC-Coupled Stave Side Signals (100pF, 50V, X7R, 0402 devices) HCC Pad count ~80 (double row bonding) VDD Hatched GND Added to balance the build GND ASIC Bus Bond Field Hybrid Bus termination embedded in final ABC130 Strip Bias Capacitor Bond pads typically 150µm x 300µm

5 Hybrid to Bus Cable wire-bonding Bus Detail 225µm pitch 150µm x 400µm 2mm Multi-drop Bus is 100µm track & 125µm gap (was originally 100µm T&G) Minimum gap is 100µm between bond pad and track 3.675mm Stave I/O

6 ABC130 Hybrid – Is 3 layer build ok? Tests on present ABCN-250 hybrid, provisionally show there is a problem with pickup Test module constructed using a shielded (reference) and a shield-less hybrid Input noise from 3PTG for both hybrids identical BUT shield-less hybrid shows a regular pattern in occupancy from the DTnoise scan (see below) Peaks correlate geometrically with vias associated with the COM line on the hybrid – not the bus trace Problem due to vias not being blind whereas on shielded hybrid they are Expect the use of blind vias throughout hybrid build to resolve this Final submission of the ABCN-25 asic hybrid planned to be shield-less as proof of principle Dtnoise Plot

7 Hybrid Bypass (DCDC?) PWR Panel Testing of hybrids, first pass To facilitate tooling, plan is to make the panel ‘flat’ – minimise the use of connectors around hybrid areas Hybrid data I/O will bond out to a bus embedded within the flex circuit Terminates to a connector to hook up to DAQ (Samtec 1.27mm pitch, detail as per HSIO for stavelet?) Propose using NTC as vacuum interlock – necessary to exclude from HCC? Assume Serial Powering? What are the overheads? Hybrid power and bypass (on separate PCB carrier) Matches up to pads on panel – sprung loaded pins or connector (on carrier) used for connection to hybrid AC coupling of hybrid data paths back to DAQ Parallel powering might be easier... DC connection for hybrid data paths, but not easy to get power in to hybrids (DCDC maybe?) Data I/O Bus Termination (on panel) Wire Bonds to bus on panel DAQ NTC