Download presentation
Presentation is loading. Please wait.
Published byElizabeth McDowell Modified over 9 years ago
1
Proposed Changes to PTCS Air Source Heat Pump Specifications April 18, 2006 RTF Meeting Bob Davis, Ecotope
2
Overview of Changes PTCS Provider requirements/duties enumerated (major addition) Technician reporting requirements more completely described Duct location designation made more generic Controls section slightly expanded and clarified Refrig. charge section expanded and clarified Wording changes added throughout to distinguish between new installs and service
3
PTCS Provider Reqs Expanded Section 1 Text addresses PTCS Provider role –Training on specs –Data mgmnt –Tech registry –Data review –Field QA
4
Duct Language Changes Section 3.2 Unconditioned/cond- itioned space language taken out (left up to specific programs to define) New section 8.2.3 says new duct systems should meet PTCS tightness requirements
5
Controls Changes/Addition Was Section 4.3/4.4; now Section 5 Aux heat staging/sequencing language removed Added sentence to clearly specify no aux heat allowed in Stage 1 call Single capacity compressor: added explicit sentence saying discharge air sensor control not allowed Multi-stage compressor: added option to allow discharge air sensor staging temperature warmer than 85° F (current req) as long as ODT is installed
6
Refrigerant Checks (formerly Section 5.4, now Section 7) Complying methods now more specific: –Operating pressures (year- round) –Capacity check (ditto) –Superheat/subcooling (summer) Documentation –CheckMe –ACRx –New HP start up form –“other approved method”
7
Summary Recommend acceptance of revised/amended HP specs Need to come up with language for dual- fuel “hybrid” systems Need to revise/amend ground/water-source HP specs
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.