Project Location: El Chaguite, Yoro District, Honduras Northeastern University’s Student Chapter 1Project: El Chaguite Water System
2
2
3
3
4
4
5
Guides Project: El Chaguite Water System5
6
El Tecuan Project: El Chaguite Water System6
7
Los Planes Project: El Chaguite Water System7
8
Project Schedule Project: El Chaguite Water System8 Dates of TravelPurposeDescription December 2007Los Planes Implementation & El Chaguite Assessment Complete Transmission Main in Los Planes, Visit El Chaguite April – May 2008El Chaguite Assess.Water Quality, Hydraulic Investigations, Existing System Inspections, Topographic Survey, Health Survey December 14- December 29, 2008 El Chaguite Phase 1 Implementation Construct Transmission Main/ Begin Distribution System April – May 2010(proposed) El Chaguite Phase 2 Implementation Storage Tank/ Finish Distribution System
9
El Chaguite Existing System 9Project: El Chaguite Water System
10
Existing Conditions Project: El Chaguite Water System10 Sufficient, clean water source Limited service Unusable distribution system Damaged main line Diverse topography Hurricane damage Fire damage
11
11Project: El Chaguite Water System
12
Current and Future Conditions Project: El Chaguite Water System12 Chaguite now:Chaguite in 25 years: 60homes87homes 333people483people 68students99students Conditions now:Conditions in 25 years Total Average Available Flow (GPD) 22,349 Total Average Available Flow (GPD) 22,349 Total Average Demand for People (GPD) 8,797 Total Average Demand for People (GPD) 12,755 Total Average Demand for Irrigation (GPD) 3,000 Total Average Demand for Irrigation (GPD) 4,350 Total Demand (GPD)11,797Total Demand (GPD)17,105
13
Design Details Feasibility Transmission Main Distribution Network Float Valve Tank Sustainability Project: El Chaguite Water System13
14
El Chaguite Population: 333 people Project: El Chaguite Water System14
15
Overall Feasibility Project: El Chaguite Water System15 Water Source : 15.52 gpm (22,348 gallons/day) 25 year projected demand: 12,755 gpd +4,350 gpd (Irrigation use) 17,105 gpd Diurnal Demand Cycle Conclusion: Feasible with water storage tank
16
Design Process Project: El Chaguite Water System16 Excel water flow model WaterGEMS flow model Multi-phase implementation Phase 1 (COMPLETE) –Construct Transmission Main –Instruct villagers on construction of distribution system –Build break pressure tank (float-valve tank) Phase 2 –Water storage tank –Inspect village-constructed distribution system
17
Transmission Main Project: El Chaguite Water System17 Source Proposed Tank Site Existing Tank Site
18
Transmission Main Project: El Chaguite Water System18
19
Float Valve Tank Project: El Chaguite Water System19
20
Alternatives Considered Project: El Chaguite Water System20 North Water Storage TankEast Water Storage Tank
21
Distribution System Model Project: El Chaguite Water System21
22
El Chaguite Project: El Chaguite Water System22
23
Transmission Main Project: El Chaguite Water System23
24
Trench Detail Project: El Chaguite Water System24
25
Trench Examples Project: El Chaguite Water System25
26
Tank Design
27
Trip Schedule Project: El Chaguite Water System27 Jun-11 Fly to San Pedro Sula Get Supplies Order Materials Visit Rigo Jun-12 Buy Groceries Order Rest of Supplies Research Pumps for Carrizalito Project Jun-13 Drive To Rosario Meet with Village and Present Design Lay out Tank Site Jun-14 Dig Tank Site Transport Bricks, Cement, Rebar, etc. Jun-15 Train Villagers our process for concrete Jun-16 Layout casting of Foundation Jun-17 Cast Foundation Jun-18 Inspect Distribution System - Day 1 Install Services - Day 1 Jun-19 Start Walls of Tank Inspect Distribution System - Day 2 Install Services - Day 2 Jun-20 Visit Los Planes Visit El Tecuan Jun-21 Survey Carrizalito Take a trip to Yoro Jun-22 Cut GI pipe for tank Visit El Rosario School Jun-23 Visit El Chaguite School Jun-24 Final Meeting With El Chaguite Jun-25 Drive to San Pedro Sula Jun-26 Fly back to Boston
28
Budget Project: El Chaguite Water System28 El Chaguite Phase 2 Estimated Budget Travel Airfare $ 4,800 Exit Fees $ 210 Truck Rental $ 1,300 Gas $ 120 Ground Hotel $ 300 Food $ 600 Labor Guides $ 240 Laundress $ 100 Cooks $ 240 Materials PVC Fittings/Valves $ 180 GI Pipes & Fittings $ 281 Tools $ 164 Tank Materials $ 1,365 Contingency $ 928 Total $ 10,827
29
Building Materials Project: El Chaguite Water System29 ItemsQuantityUnitsUnit Price ($)Total Price ($) PipesGI2 Inch80ft $ 2.50 $ 200.00 Fittings/Valves TapsPVC 1/2 Inch60ea $ 3.00 $ 180.00 CouplingGI 2 Inch6ea $ 1.73 $ 10.38 Elbows (45 or 90)PVC 1/2 Inch120ea $ 0.40 $ 48.00 Valves PVC 1/2 Inch60ea $ 3.05 $ 183.00 GI Gate Valve 2 Inch3ea $ 17.60 $ 52.80 GI Globe Valve 2 Inch1ea $ 17.60 Tools Pliers4ea $ 10.00 $ 40.00 Trowel4ea $ 10.00 $ 40.00 Plasterer's Float4ea $ 10.00 $ 40.00 Bucket12ea $ 4.00 $ 48.00 Level2ea $ 10.00 $ 20.00 Tank Materials Cement60bags $ 5.10 $ 306.00 Sand9cy $ 12.00 $ 108.00 Gravel7cy $ 12.00 $ 84.00 Brick3000brick $ 0.13 $ 397.04 #3 Rebar2000ft $ 0.16 $ 320.00 #4 Rebar800ft $ 0.16 $ 128.00 Barb Wire1000ft $ 0.02 $ 17.37 Staples3lb $ 0.68 $ 2.05 Nails3lb $ 0.68 $ 2.05
30
Sustainability Extra materials supplied for maintenance and replacement. Locals will be educated on water conservation and proper system maintenance. Water Board will collect usage tax to fund future repairs. Simple design and construction Project: El Chaguite Water System30
31
Community Ownership & Education Project: El Chaguite Water System31 What kind of help will the community be providing? –Labor (digging trench, laying pipe, mixing cement, transporting materials). –We will coordinate a schedule of construction with El Chaguite’s Water Board. Who will own the project once it’s completed? –El Chaguite will own the water system upon completion of the project. The El Chaguite Water Board will manage the communally used infrastructure.
32
Community Ownership & Education Project: El Chaguite Water System32 Who will be overseeing maintenance once the team leaves and how will repairs be paid for? –El Chaguite’s Water Board will be overseeing the maintenance of the system. We will leave extra materials with the villagers to take care of any immediate necessary repairs. Hopefully, with improved health, the villagers will be able to establish community funds and pay for repairs further in the future. What education will be provided to the community? –The community will be educated on the maintenance of the system, and we also plan to provide information about health and sanitation. In order for this to be a successful effort we will be working with the community Water Board and local organizations to ensure that the people understand the situation and are well informed about health and sanitation issues.
33
Project Lead Sign-Off Project: El Chaguite Water System33 I, Daniel P. Saulnier, P.E., as the Professional Mentor of this project, have reviewed the technical and logistical contents of this project, and approve of the proposed design. I will also comply with TAC recommended changes and make suggested changes before traveling on the implementation trip. Daniel P. Saulnier October 8, 2008 [signed]
34
Questions? Project: El Chaguite Water System34 Thank you for your attention. This slide concludes our formal presentation.