Download presentation
Presentation is loading. Please wait.
Published byDominic Waters Modified over 9 years ago
1
PNCWA Operators Conference Eastern Oregon Region AWWA/PNCWA Short School Water Project of the Year City of Arlington Mesa Industrial Park Water System
2
Project Summary $2.3 million water and sewer system improvements project to the Arlington Airport and new industrial park area Water system improvements included two new booster pump station, a 250,000-gallon reservoir, and a full distribution system Funded by the City of Arlington and Gilliam County The City of Arlington has a shovel-ready industrial park area with full water and sewer system service
3
Reservoir Construction
4
Airport Booster Pump Station Piping
5
250,000-Gallon Steel Storage Reservoir and Booster Pump Station
6
Mesa Industrial Park Area
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.