Municipality of Kecskemét - General economic data Capital of Bács-Kiskun county Economic, administrative, educational, and cultural centre Population: 113.275 (2011), number of households: 42.541 Important investors (e.g., Mercedes-Benz factor opened in 2012) Economic structure: 48.3% service 41.39 % industry 10.31% agriculture Perfect location M5 Motorway 85 km from Budapest 70 km from the airport NATO airbase to be transformed for civil use
3
Scheme of the Existing district heating system Heat provider: Termostar Kft. Owners: 69.5% - Municipality 30.5% - EDF DÉMÁSZ Zrt. Heating Company Proprieraty Two independent distribution system Total heated space: 2 023 929 m 3 No. of heated flats: 11 234 Supplied heat amount: 405 167 GJ No. of heat transfer stations: 309 Distribution System Capacity requirement: 38 MW Hot water requirement: 3 MW Covers hot water heat requirements Capacity: 6,6 MW thermal capacity 6,2 MW electric capacity Capacity requirement: 19 MW Hot water requirement: 1,5 MW Széchenyiváros System Árpádváros SystemGas Engines
4
District heating system – Future plans Connection of the two separate networks financed by the Environment and Energy Operational Programme (Structural Funds) - executed Use of geothermal energy in the district heating system Installation of efficient gas boilers replacing the old ones Further extension of the district heating system with residential and industrial consumers is possible and considered
5
Future demand for the district heating network
6
Project plan
7
Layout of the geothermal system
8
Installed Geothermal Capacity Length of the heating season: 182 days Peak time capacity is required in very few days a year Produced heat amount is not linear in function of the installed capacity Optimal capacity Temperature distribution chart Produced geothermal heat Optimal capacity
9
Phase 1: 3,5 MW capacity; 38 400 GJ heat Phase 1+2: 18,3MW capacity; 254 500 GJ heat Phase 1+2+3: 28,2 MW capacity; 382 100 GJ heat Execution Phases (1) Install geothermal heat plant in heat transfer station no. 202. Drill 1+1 wells Pre-heat secondary loop return water Phase 1 Connect Széchenyiváros system into geothermal heat plant Drill 3+3 wells (total 4+4 operates) Pre-heat primary loop return water Phase 2 Connect Árpádváros system into geothermal heat plant Drill 2+2 wells (total 6+6 operates) Pre-heat primary loop return water Phase 3 Safety – Reduce drilling risk Adapted milestones Earlier operation Income Subsidy Advantages 3 parallel pipeline is installed (2 small + 1 large) Large pipeline is unused in phase 1 2 small pipelines reinject in phase 3 Supply and Reinjection Pipeline Energy produced
10
Kecskeméti Termálrendszer Beruházó Ltd. (project company) 7% Municipality of Kecskemét 93% EU-FIRE Ltd. Municipality of Kecskemét Termostar ( district heating company) 69% municipality of Kecskemét 31% EDF Additional professional investors Contractors Financial investors EU-FIRE Ltd. Contractual relation Ownership relation End users (present and future consumers of the heat) Actors involved
11
Discount rate is less than 15% The project is feasible, if the following criteria can be fulfilled Sale Price: greater than 2500 HUF OR Phase 1Phase 1+2Phase 1+2+3 Drilling3 000 000 €11 900 000 €17 800 000 € Execution8 375 000 €10 275 000 €12 575 000 € Total Investment Cost11 375 000 €22 175 000 €30 375 000 € Phase 1Phase 1+2Phase 1+2+3 Heat Amount40 000 GJ250 000 GJ380 000 GJ Revenues Sale price: 2500 HUF/GJ 581 000 €/year3 013 000 €/year4 758 000 €/year Expenditures601 000 €/year1 388 000 €/year2 006 000 €/year Operating income-20 000 €1 625 000 €2 752 000 € SubsidySale price:2500 HUF/GJ 20% NPV4 422 000 € IRR20,8 % Financing of the proposed investments (1) Investment Cost Yearly Net Income Financial Results with 15% discount rate
12
What has already been done? Task carried outDate (year/month) Heat market evaluation Existing system study 2011/2-2012/2 2011/3-2011/8 Preliminary geological data gathering Preliminary Well Site Report Reservoir modelling for the Pre-feasibility study 2011/7-2012/7 Pre-Financial modelling2011/11 Pre-feasibility study2011/3-2011/12 Project company founded with private investor2011/8 Preliminary negotiations with possible investors 2011/3 - 2014/8
13
Overview of the workplan 1: Management 2: Preliminary studies 3: Licensing and permitting 4: Technical and financial engineering of the geothermal plant and system 5: Procurement 6: Financing 7: Communication 8: EACI Dissemination Activities
14
Partners & Contacts Name of the beneficiaryContact personE-mail Municipality of Kecskemét Kecskemét Megyei Jogú Város Önkormányzata Dr. Lívia BUZÁSSYbuzassy.livia@kecskemet.hu EU-FIRE Ltd. EU-FIRE Kft. Péter KOVÁCSpeter.eufire@gmail.com Project Company (KTRB) Kecskeméti Termálrendszer Beruházó Kft. Imre KOVÁCSimre.kovacs@eu-fire.hu