Download presentation
Presentation is loading. Please wait.
Published byOwen Cobb Modified over 9 years ago
1
GALİP ZEREY BOARD MEMBER OF ICTA A PRIL 2013
2
/22 ICT R EVENUES IN T URKEY 1 Turkish ICT Market, Billion $ Source: TÜBİSAD
3
/22 2 N UMBER OF A UTHORIZATIONS
4
/22 3 T OTAL I NCOME AND I NVESTMENT
5
/22 I NVESTMENT /I NCOME R ATES 4 2012 Investment/Income Rate Türk Telekom, 18% Mobile operators, 13%
6
/22 R EVENUE D ISTRIBUTION 5
7
/22 F IXED AND M OBILE M ARKET 6
8
/22 T OTAL T RAFFIC V OLUME 7
9
/22 M INUTES OF U SAGE (M O U) 8
10
/22 SMS 9
11
/22 N UMBER P ORTABILITY 10
12
/22 N UMBER OF I NTERNET S UBSCRIBERS, MILLION 11
13
/22 12/21 ICTA NPS Recipient Operator Systems Recipient Operator Customer Center Donor Operator Systems Porting date and time..... Application Form -Number -ID info -Donor operator -Prefered porting time -Contact info GSM Operators Türk Telekom Other Operators 1 2 4 3 5 6 7 N UMBER PORTABILITY S YSTEM - 2
14
/22 C ENTRAL E QUIPMENT I DENTITY R EGISTER (CEIR) - 1 13 Between 2002-2005 7 people were killed 600 were wounded As victims of mugging After 2006 Thievery of mobile phones decreased by 90% in first 3 years Black market shopping reduced ~ $9 Billion of tax collection
15
/22 C ENTRAL E QUIPMENT I DENTITY R EGISTER (CEIR) - 2 14 CEIR White List Paired White List (5.139.127) Black List Mobile Operators Number of registered mobile equipments as of April 11, 2013
16
/22 E LECTRONIC S IGNATURE – 1 Electronic Signature Law came into force in January 2005 Four electronic certificate service providers were authorized and they began to service in July 2005. One of them serves to public sector and the others serve to private sector. 15
17
/22 E LECTRONIC S IGNATURE – 2 16
18
/22 M ARKET S URVEILLANCE L ABORATORY 17 EMC Test SAR Test Established in April 2007 Wireless and telecommunication equipments are tested for some technical characteristics (EMC, RF, SAR, TBR and LVD) Number of Tests Applied -Q1 Additionally, in RF Laboratory 399 pieces of radio equipment coming from customs tested for checking whether they are appropriate for national frequency plan in 2012
19
/22 N ATIONAL M ONITORING S YSTEM 18
20
/22 IP V 6 T RANSITION 19 National IPv6 Infrastructure Design and Transition Project completed and outputs were published at www.ipv6.net.trwww.ipv6.net.tr First IPv6 Conference 12-13th of January 2011. Second IPv6 Conference 15th of February 2012. Prime Ministry Circular (Plan for Public Sector's Transition to IPv6)
21
/22 S AFER I NTERNET – 1 Two profiles: Children and Family optional free of charge no need to install any program or software switching between profiles and turning off SIS is available every time (just 10 seconds) 20
22
/22 S AFER I NTERNET – 2 Internet Hotline http://www.ihbarweb.org.tr ICTA Internet Hotline became a member of INHOPE in May 2011. 21
23
/22 I NTERNATIONAL E DUCATION P ROGRAMS International technical education program: Duration was 6 weeks At the beginning of 2012 Participants coming from Kosovo, Bosnia Herzegovina, Sudan, Macedonia and Montenegro 22 International regulation programs: Duration for each was nearly 1 week June and November 2011, 60 participants coming from 19 countries May and November 2012, ~70 participants coming from 23 countries
24
GALİP ZEREY BOARD MEMBER OF ICTA A PRIL 2013
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.