Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing.

Similar presentations


Presentation on theme: "Navajo County Public Works Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing."— Presentation transcript:

1

2 Navajo County Public Works

3 Major Capital Improvement Projects Porter Mountain Road - $2.7 Million Realign, Replace and Reconstruct 1.7Miles of Existing Roadway to Apache County Line – under way Lone Pine Dam Road and Bridge - $5.0 Million Realign Existing Roadway Construct New Bridge South of Dam Hope to be out to construction this fall or next spring Obed Bridge - $2.6 Million Replace Bridge Truss System and Deck with new Bridge

4 Navajo County Public Works Porter Mountain Road

5 Navajo County Public Works Porter Mountain Road

6 Navajo County Public Works Porter Mountain Road Project Details Upgrade Roadway & Existing Drainage System Coordinate with Local USFS District Federal Land Exchange Issues Selected Design-Build Team Plans and GMP completed at $2.27 M. Construction well underway, to be done in October, 2008

7 Navajo County Public Works Lone Pine Dam Road and Bridge

8 Navajo County Public Works Lone Pine Dam Road and Bridge Roadway Alignment Study

9 Navajo County Public Works Project Details 1 Mile of Roadway Construction Realignment and Reconstruction 440 ft Bridge Span 100% Plans completed and submitted to ADOT in August, 2008 Construction hopefully to bid in late 2008 Lone Pine Dam Road and Bridge

10 OBED BRIDGE In final Design -Estimated cost $2.6 million

11 Navajo County Public Works Roadway Maintenance Surry Seal Completed 20 miles this summer AC Overlay Double Chip Seal Completed 5 miles near Taylor Rejected Bids, will re-bid in Spring 2009

12 Navajo County Public Works Subdivisions Currently Processing 45 Subdivisions Lot Sizes from.5 to 10 acres

13 Navajo County Public Works Transportation Study Sub-Regional Study Completed in late 2007 Pinetop-Lakeside Show Low Snowflake Taylor Vernon Concho Now Expanding study to include remainder of County, Winslow and Holbrook with ADOT support.

14 Navajo County Public Works Transportation Study

15 Navajo County Public Works Transportation Study

16 Navajo County Public Works Transportation Study

17 Navajo County Public Works Transportation Study Summary: Study Completed July 2007 – Provides Traffic Impact Projected to 2030 Additional Study Areas to be Incorporated (Holbrook, Heber/Overgaard, Winslow) Began additional study January 23, 2008 Coordination with Statewide Study Interim Projection to 2015

18 Navajo County Public Works Planning and Zoning Total New Roads added to Book of Maintained Roads: 15 Miles (2007) Propose Development Impact Fees; Study on hold till new President elected Implementation may be delayed due to economic concerns

19 Navajo County Public Works Flood Control Preliminary DFIRM received Sep 2007 Digital GIS Format Mapping Process - 27 miles of levees o Ruby Wash o Winslow o Holbrook o Met with public in November o Asked for additional time for review County Flood Control Audit – Feb 2007 Rating Improvement from Level 9 to 8 10% Discount in Flood Insurance Rates Revised Subdivision and Drainage Policy Requires 100-year, 2-hour Detention Complies with Applicable State Standards

20 Navajo County Public Works Current Vacancies Our positions are pretty well frozen for the time being, until the economy turns around. Eliminated Deputy Planning Director position Have position open for County Engineer (P.E.)

21 Current Projects Navajo County Public Works On-Call Engineering Services, 2007 - Retained four firms – kept them for 08-09 On-Call Soils Testing Services, 2007 - retained one firm – may expand in 09 Obed Road Bridge final Design - under contract (Transystems) Selected one firm to perform Mountain View ID and one small ID (North Whistle Stop Loop) Selected one firm to do Hilltop Lane ID Two new IDs in formation stage