Download presentation
Presentation is loading. Please wait.
Published byGary Simpson Modified over 9 years ago
1
2015 ACEC Washington + WSDOT Joint Meeting WSDOT/ACEC bridge &Structures sub-committee Report WSDOT Co-Chair Geoff Swett, PE / SE, Bridge & Structures (current) Jeri Bernstein, PE / SE, WSF (future) ACEC Co-Chair Jim Schettler, PE / SE, Jacobs Engineering June 11, 2015
2
2015 ACEC Washington + WSDOT Joint Meeting Pasco Bakotich Team Sponsor – State Design Engineer Geoff Swett – PE, SE Co-Chair - Bridge Design Office Eric Schultz – PE Bridge Design Office Jeri Bernstein – PE, SE Washington State Ferries Glen Scroggins, PE, SE Bridge Design Office Eric Ferluga – PE Bridge Design Office Jed Bingle – PE, SE Bridge Design Office Mark Gaines – PE Construction Office Bijan Khaleghi – PE, SE Team Mentor - Bridge Design Office Lindsey Yamane Team Sponsor – Parametrix Jim Schettler – PE, SE Co-Chair - Jacobs Engineering Paul Guenther – PE, SE Ben Gerwick Bill Elkey – PE, SE Parsons Richard Patterson – PE, SE Buckland and Taylor Chester Werts – PE, SE HDR Paul Brallier – PE, SE HNTB Corp Matthew Lengyel- PE, SE David Evans and Associates
3
2015 ACEC Washington + WSDOT Joint Meeting Who are we? Team Vision: “PROVIDE A PLATFORM FOR THE EXCHANGE OF STRUCTURAL ENGINEERING IDEAS BETWEEN WSDOT AND THE CONSULTANT COMMUNITY.” Promote cost-effective, constructible, quality projects Share best practices, lessons learned and new engineering innovations Establish design guidelines for all delivery methods
4
2015 ACEC Washington + WSDOT Joint Meeting Who are we? (Continued) Enhance understanding of WSDOT and consultant business Promote innovation Maintain awareness of environmental permitting requirements Provide value to engineering and construction communities
5
2015 ACEC Washington + WSDOT Joint Meeting 2014-2015: SUB-COMMITTEE ACTIVITIES Provide Value to Engineering Communities WEBSITE DEVELOPMENT: http://www.wsdot.wa.gov/bridge/acec/ http://www.wsdot.wa.gov/bridge/acec/ DESIGN REVIEW SERVICES: “Ask a Question” & “Request a Project Review” Bridge & Ferry Terminal: Post-earthquake Evaluation Implementation
6
2015 ACEC Washington + WSDOT Joint Meeting 2014-2015: SUB-COMMITTEE ACTIVITIES Share best practices, lessons learned and new engineering innovations Digital Signatures Implementation Technical Presentation: Innovated Materials for Seismic Resilient Bridge Columns 100 vs 75 Year Design Life Impacts – Research Standard Specs & SP’s – Review & Comment
7
2015 ACEC Washington + WSDOT Joint Meeting 2014-2015: SUB-COMMITTEE ACTIVITIES Establish design guidelines for all delivery methods WSDOT’s D/B BDM – Review & Comment DRAFT GC/CM Contract Language – Review & Comment
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.