Download presentation
Presentation is loading. Please wait.
Published byElla Sharp Modified over 11 years ago
1
Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 1 Agenda RussMechanical Fred / Drew / AbidCFT / PS Bill L.STT Michael / SergeySMT RobertCAL DmitriForward Muon Al ItoCentral MuonFritz / GeoffControls JeffL1MuonBrendanLuminosity Stefan / BrigitteCTTMike S.FPD MiroslavL2
2
Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 2 Store 3118 (Dec 31) Initial Lum. 1.5 10 31 cm -2 s -1 STT out BLS PS trip Special runs (CTT, Muon)
3
Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 3 Store 3120 (Dec 31 – Jan 1) Initial Lum. 2.7 10 31 cm -2 s -1 Take STT out, SMT HDI problem MDT problem
4
Arnd Meyer (RWTH Aachen) Jan 2, 2004Page 4 Store 3122 (Jan 1 – 2) Initial Lum. 4.3 10 31 cm -2 s -1 Multiple crate x51 downloadsSMT trip STT (in, one out, all out) Efficiency: Dec 31 st 77% (0.70/0.91 pb -1 ) Jan 1 st 87% (1.34/1.55 pb -1 )
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.