Smart transmission system Marián Belyuš18. April 2012 R&D Conference ČEZ Měření ČEPS, a.s.
2
Table of contents Principal factors with impact on ČEPS SET Plan of European Commission and EEGI initiative Selected R&D activities in ČEPS Illustration of on-line operating information at ČEPS
3
External factor (Super Grid) Source: Project EWIS
4
Source: BMU PV boom (PV = Photo- Voltaic power sources) Internal factor and development in PV
5
PVE- History & maximum of power generation Generated power (monthly) Max. power generation value per a unit time period (15 min) Total PV power generated in 2011 = 2073 GWh
6
Regional factor - Nuclear Phase-Out in Germany Source: BMU Biblis A 1167 MW Neckarwestheim 1645 MW Philippsburg 1890 MW Unterweser 1345 MW Isar 1 878 MW Biblis B 1240 MW Brunsbüttel 771 MW Krümmel 1345 MW ------------------------------------- Total: 8281 MW
7
European Electricity Grid Initiative – EEGI SET Plan – a conceptual document of EC for support of research & development in power industry One of supported areas is represented by EEGI
8
Projects proposed by EEGI in 2011 X X X X X X- Priorities of ČEPS for 2012 X X
9
Selected R&D activities in ČEPS ACM - Automatic central monitoring of VHV & EHV equipment condition within TS Dynamic Rating Variable ampacity of transmission line in dependence on climatic conditions EPG -European Power Grid FACTS - Flexible AC Transmission Systems GCC -Grid Control Cooperation eHIGHWAY 2050 Modular Development Plan on Pan-European Electricity Highways System SCOPF -Security Constrained Optimal Power Flow TSC - Transmission System Cooperation UMBRELLA - Toolbox for Common Forecasting, Risk Assessment, and Operational Optimisation in Grid Security Cooperation of Transmission System Operators (TSOs) UA&MD -Study of connectivity of Ukraine & Moldavia with continental Europe WAMS - Wide Area Monitoring System
10
TSC - Joint control of operational security of TSs in the region, coordination of corrective actions 50Hertz Transmission (Germany) Amprion (Germany) APG (Austria) ČEPS (Czech Republic) ELES (Slovenia ) EnBW Transportnetze (Germany) PSE Operator (Poland) Swissgrid (Switzerland) TenneT TSO (Netherlands) TenneT TSO (Germany) VKW-Netz (Austria) HEP (Croatia) MAVIR (Hungary) The initiative covers the territory in Central Europe with population more than 165 million TSC members Former sphere of UCTE grid TSO with status of observer
11
TSC offers integrated output data which are useful for TSOs, as well as for other existing security initiatives (centralised or de centralised...) TSC is compatible with all organisational forms (among other TSOs) in Europe TSC can be extended, if there is an interest of other TS operators (even to other spheres of synchronous part of European grid) TSC improves operational security of TSs in Europe ENTSO-E CTDS CORESO TSC - SSC… Brussels Europe TSC for TSOs in a decentralised way Roemmerkirchen (DACF …)
12
TSC -TSO Security Cooperation Tool for closer cooperation between Transmission System Operators (TSOs) It solves unfavourable operating situations (caused e.g. by high transit of power from wind parks in Northern Germany). These flows of power result from increased installed power generation capacities in wind power stations as well as from prices of power on spot markets (such prices of power are directly related to the volume of wind power generation) Typical flows of power generated from wind
13
Real-Time Awareness & Alarm System (RAAS) in Central Europe Global knowledge of situation in electricity systems and real-time information on main parameters which are available at individual dispatching centres RAAS provides warnings and alarms relating to grid conditions to all TSOs in the whole region in real time. TSO 1 TSO 3 TSO 2 TSO 4 TSO 21 TSO 6 AMPRION TENNET CEPS ENBW AMPRION SWISSGRID ELES APG MAVIR SEPS PSE 50Hertz
14
UMBRELLA THEME [ENERGY.2011.7.2-1] [Innovative tools for the future coordinated and stable operation of the pan-European electricity transmission system] Full name of the project: Toolbox for Common Forecasting, Risk Assessment and Operational Optimisation in Grid Security Cooperation of Transmission System Operators (TSOs) 9 TSOs 5 Universities 1 Research centre
15
Illustration of on-line operating information at ČEPS Operating information 1 2 43 1 Trans-border power flows2 Load in CZ (GW) 3 Activation of power stations (MW)4 Dispatching tunnel (MW)
16
Thank you for your attention… Marián Belyuš R&D Department ČEPS, a.s. belyus@ceps.cz