2
Northwind project Concession granted: 15 May 2006 Fully permitted
Permit for construction and exploitation Export Cable Permit Land cable Declaration of public use Flemish road permit Federal road permit Building permit Area: 14,5 km² Water depth: 16 to 29 m Distance from shore: 37 km
3
Northwind project 216 MW 72 Vestas turbines V112 3 MW
Yearly production estimated: 0,875 Terrawatthours = 875 million kilowatthours Meaning: 1% of the yearly electricity consumption in Belgium in 2011. Green energy for households each year.* Reduce CO2 emission by tons each year.** * cfr VREG ** cfr Eurostat
4
General information Turbine model: Vestas V112 – 3.0 MW
Rotor diameter: 112 m Foundation type: Monopiles Export cable: 220 kV Length export cable: 43 km Construction will start: spring 2013
5
Shareholders Parkwind
6
Connection to transmission grid
Offshore windfarm Monopile Transition piece Windturbine Inter array cables OHVS (transformation station) Export cable 5 3 Connection to transmission grid 2 1 4 6
7
Contractors WE Power Project management
EPCI - Engineering Procurement Construction Installatie Supply monopiles Supply Transition pieces Supply & termination inter-array cables Installation hammer Detailed design Supply foundation installation vessel WE Power Moet dit allemaal nog naar het Nederlands vertaald? En van sommige kan ik de logo’s niet vinden
8
Contractors Installation export cable & dredging:
Supply and termination land cable: WTG installation vessel: Supply and termination export cable: Vanden Bergh logo???!
9
Contractors WTG: Supply & installation Offshore High Voltage Station:
HV equipment: CG Power systems Foundation design certification: Power purchase agreement:
10
Partners Financial & legal BnP Parisbas Fortis Mott Macdonald
Green giraffe Loyens & Loeff White & Case Contrast JLT Freshfields KPMG Insurance Profin Marsh Belgium Codan Forsikring A/S AXA Versicherung AG AXIS Specialty Europe Ltd. HDI-Gerling Verzekeringen N.V
11
Belgian content Belgian content: 50% Deme-GeoSea Jan De Nul
CG Power systems Belgium GI Windforce Vanden Bergh/Heijmans Other than procurement WE-Power Freshfields Lawyers Brussels Aspiravi Offshore BNPParibasFortis Electrabel Belfius Bank Loyens Loeff Lawyers ING Bank White & Case Lawyers Brussels & London IMDC Contrast Lawyers Tractebel-Technum Marsh Belgium ONDD-Delcredere. KPMG Tax advice Moet dit allemaal nog naar het Nederlands vertaald? En van sommige kan ik de logo’s niet vinden
12
TeamPartners InControl SA WE Power ABS Aspiravi offshore Chevalyse
Ensol EPCM IMDC Noren quality consulting Offshore wind power consulting Polymira Qualsurv SGS Technum Tractebel Verenigde fiducaires Wind Support Limited
13
Belgian support & Northwind team FOD economy Federal authorities MUMM
Flemish authorities Elia CREG DG Leefmilieu & Northwind team
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.