Download presentation
Presentation is loading. Please wait.
Published byAngelina Summers Modified over 9 years ago
1
MAKING PROGRESS POSSIBLE 11/20/09 Technology in the Dirt GIS Day – McAllen, TX
2
MAKING PROGRESS POSSIBLE So what does all this mean? Will this impact your business? What are the Risks? What are the Rewards?
3
MAKING PROGRESS POSSIBLE
4
The Road Design Profile View 80 m Cross Section View A B C 8 m North Road South Road Top View
5
MAKING PROGRESS POSSIBLE Summary of the production study results Conventional: 24:32 hrs AccuGrade: 11:50 hrs
6
MAKING PROGRESS POSSIBLE Summary of the production study results 100% Increase in Productivity 3,0 days vs. 1,5 days Increased Machine Utilization Less waiting time Longer passes Savings in Operating Cost 43% less Fuel consumption Less wear on U/C and GET Conventional AccuGrade 43% fuel saving
7
MAKING PROGRESS POSSIBLE Summary of the production study results Reduction in Surveying Cost 18 hrs & 14 min. X 2 people (Old way) vs.. 54 min. for 1 person (New way): 95% time saved and 1 person less. Increased quality / potential for material saving 45% in tolerance vs.. 98% in tolerance & much more consistent Verges and side slopes visually looked much better with AccuGrade 9 Trucks vs.. 8 Trucks over 80M – 11% savings ConventionalAccuGrade
8
MAKING PROGRESS POSSIBLE Design Surface
9
MAKING PROGRESS POSSIBLE AccuGrade Product Line Overview Track Type Tractor AccuGrade Laser AccuGrade GPS AccuGrade UTS Motor Grader AccuGrade Cross Slope AccuGrade Sonic AccuGrade Laser AccuGrade GPS AccuGrade UTS Backhoe Loader AccuGrade Site Ref. AccuGrade Laser Ref. (indicate only) E Series Excavator Site & Laser Reference (indicate only 311-319) AccuGrade GPS (indicate only 320-385) Soil Compactors AccuGrade Compaction CS56, CS64, & CS76 Wheel Tractor Scraper AccuGrade GPS 613G
10
MAKING PROGRESS POSSIBLE AccuGrade ® Compaction System AccuGrade ® GPS AccuGrade ® CD700 display Records & maps compaction results Displays measurements and guides the operator Export compaction data to AccuGrade ® Office with Wireless Option
11
MAKING PROGRESS POSSIBLE AccuGrade Compaction vs. Traditional Testing Methods
12
MAKING PROGRESS POSSIBLE Intelligent Compaction
13
MAKING PROGRESS POSSIBLE Asset Management with Technology
14
Low Earth Orbiting Satellite Network GPS Position 0 0 1 1 2 2 3 3 8 8 Hours from the R Terminal ECM Location SMU Event & Diagnostic Codes System Overview
15
What’s going on with the machines at the Stone Ridge jobsite. Status Jobsite Productivity
16
Utilization They’re hardly using it! I’ll move it to the Main Street job. I won’t have to rent one after all. Jobsite Productivity
17
MAKING PROGRESS POSSIBLE Utilization Unit T12345 is Idling about 32% of the time. Jobsite Productivity
18
Owning & Operating Costs Planned Maintenance The service on the 420D is late. The D8T will come due this week.
19
Safety Operation We need to get this operator training?
20
MAKING PROGRESS POSSIBLE Conclusions What does all this mean? This is currently impacting our businesses? Are the risks manageable? Are there rewards already being reaped?
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.