Presentation is loading. Please wait.

Presentation is loading. Please wait.

PRODML Review Energistics Western Europe London, 31 May 2011.

Similar presentations


Presentation on theme: "PRODML Review Energistics Western Europe London, 31 May 2011."— Presentation transcript:

1 PRODML Review Energistics Western Europe London, 31 May 2011

2 Summary - Aims of Presentation Review background Short term re-energize New Capability: Wireline/Drill Stem Testing Plan: Completions Find compelling business cases Request member involvement

3 “A Brief History of PRODML” ‘05 – formed by majors, invited service co’s ‘06 – $1.25m, Focus “DOF”, 4 pilots, plug & play demos, ATCE launch v1.0, SPE paper ‘07 - ~$0.7m, 7 pilots, 2 reporting, 1 DTS, 4 DOF, ATCE roadmap & 2 SPE papers ‘08 – slowing momentum, 1-2 pilots, SAM/GDA ‘09-’10 – fewer initiatives, incremental release

4 Re-energize during 2011 Demonstrate essential commitment by maintaining annual & “responsive” releases Identify a Compelling Business Case objective, achievable in 1-2 years, with commitment of current SIG membership to contribute Refine roadmap longer term around industry desires & matching commitments

5 2011 Development Release 2.1 - pending  adds Formation Tester Saudi Aramco requests - incr. release  Gain Aramco involvement and usage Completion Object – start work  Work with WITSML  Ensure Business Case & use cases understood & supported Regulatory reporting - prep. for 2012  Interact with NDR SIG to gain requirements

6 PRODML Data Objects 1.Flow Network 2.Product Volume 3.Production Operation 4.Well Test 5.DTS 6.Time series 7.Fluid Sample and Analysis 8.Wireline formation tester (coming in 2.1)

7 Slide #7 Scope of Formation/Drill Stem Testing P Gauge Flow Sample Pressure Transient Analysis Reservoir Inflow Parameters PVT Lab Analysis Fluids Properties Transient Welltest or Wireline FT Performance & Res Descr. Time-series Data P Q

8 WFT Packers 8

9 Slide #9 WFT Probe Types (examples) 9 Single Probe (Weatherford photo) See:~http://www.slb.com/content/services/e valuation/reservoir/quicksilver_probe.asp? Central plus annular Probe See:~http://www.halliburton.com /public/common/Data_Sheets/H 06089.pdf Oval Pad Probe

10 Slide #10 WFTs: Multiple Layers Tested Can test, sample, analyse and report flowing interval by flowing interval. Each “stop” is referred to as a Station

11 Slide #11 R1 Results Derived From Results WFT Station Sensor 1 Sensor 2 Tests Samples Events Example: property measured in test 2 is used to derive results from test 3 Methods Results R2

12 Slide #12 Results across stations  upscaling, form eval., res.descr. Results apply at each station individually, but also across multiple stations. WFT Stations Property Profiles Property Gradients Std. Logs

13 Slide #13 Completion Data Drilling  Production Perm. Gauge DTS Flowing Intervals, sensor depths Drilled Well Completed Well Perm. Gauge DTS Surveillance / Reporting E.g. Gas Lift Change Optimization Optimization using models New Completion Drilling & Completions Domain Production Domain Workover Planned Tubing Perforations SSSV Packer Completion DB Well Services Drilling system WITSML Drill Complete

14 Compelling Business Cases – e.g.’s Completions (D&C  life of well) NDR and/or NOJV reporting Service company data (field  office) DOF Formation Evaluation How? Member commitment to “make it happen” Roadmap Iterative approach to thorny problems

15 2011 Promoting Awareness Take story back to key members Promotion/assessment: current capabilities  e.g. survey of well test use (?others, e.g. reporting, DTS, etc.) Initiatives: compelling but achievable aims Get right expectations and engagement

16 2011 Processes Requirements capture - Use Case Team  Completions  Regulatory reporting Development - Specification Team  Data schemas & services Support - Deployment Support Team  Documentation and help  No team or resources currently in place

17 2011 Technology Trends Shared issues across standards Need for cross-standards workgroup to integrate all this

18 The Team Jim Green (CVX) – Board sponsor Bill McKenzie (CVX) & Mike Knewtson (SLB) – Spec Team co-leads + ~6 regular Dave Shipley (CVX) & TBC (svc co) – Use Case Team co-leads + ~ 2-3 regular Jerry Hubbard, Jana Schey, Gary Masters - Energistics Laurence Ormerod – PM (part time role)

19 Our Need Please get involved!! Any input welcome, esp:  Use Case Team (details or long term vision)  Deployment Support We want to be led by real world deployments


Download ppt "PRODML Review Energistics Western Europe London, 31 May 2011."

Similar presentations


Ads by Google