Download presentation
Presentation is loading. Please wait.
Published byRoxanne Harrison Modified over 9 years ago
1
Office of Research and Information Technology International Border Crossing Program Electronic Screening Transportation Border Working Group April 19, 2011
2
1 Office of Research and Information Technology FMCSA Priorities, and Goals Priorities Raise the bar Maintain high safety standards Remove high-risk carriers Strategic Plan 2006-2011 Advance Electronic Safety and Credential Monitoring to Facilitate International Traffic Flow at our Nation's Borders
3
2 Office of Research and Information Technology 11 million Mexican and Canadian commercial CMV trips into the United States annually State and FMCSA border inspectors are responsible for ensuring that CMVs are compliant with State and Federal safety and regulatory standards Primarily accomplished through safety inspections Border Crossing Enforcement
4
3 Office of Research and Information Technology FMCSA Driver Credentials Equipment fitness Federal operating authority status Proof of insurance/appropriate coverage Border State Vehicle registration status Size and weight limitations Other State-specific requirements Safety and Compliance Requirements
5
4 Office of Research and Information Technology Current screening is manual Limits coverage Time consuming Based on: Inspectors’ knowledge of specific carriers Visual check of obvious physical defects Limited conversation with driver Random selection Determining Which Vehicles to Inspect
6
5 Office of Research and Information Technology Phase I – Demonstration of Concept – Completed 2007 Phase II – Analysis of Demonstration – Completed 2009 Phase III – Field Operational Test – Starting in 2011 International Border Screening Program
7
6 Office of Research and Information Technology International Border Crossing (IBC) e-Screening concept Use of radio frequency identification device (RFID) transponders to identify drivers and vehicles RFID technology selected because 90% of trucks entering the U.S. are equipped Enhancing the Screening Process
8
7 Office of Research and Information Technology Demonstrated at Santa Teresa, NM port of entry - Low volume (120-140 trips per day) - Staffed 80% of time - Ideal environment for testing and evaluation 14 carriers participated Vehicles screened to validate: - Currency of CVSA decal and truck registration - Federal operating authority status of carrier - Current insurance - Driver tags/commercial drivers license status Over 5,500 transponder reads in demo Phase I – IBC E-Screening Demonstration
9
8 Office of Research and Information Technology Technology performed reliably (99% accurate) Reduced processing time for selection for inspection (1 sec vs. 15 min.) Increased number of vehicles subject to inspection (237/month baseline vs. 965/month during demo) Focused limited enforcement resources Reduces processing for compliant vehicles Major Findings
10
9 Office of Research and Information Technology Currency of CVSA decal On-site enrollment is time consuming and limiting No way to identify trailer electronically verify compliance All drivers did not have ID cards Screening decision displayed only inside facility Limitations of Concept
11
10 Office of Research and Information Technology Utilizing International Trade Data System (ITDS) shared by Customs and Border Protection (CBP) with FMCSA Identify carrier, truck, trailer, and driver Eliminate need for on site enrollment Tied to other data sources Screen on more than 20 factors of interest Requirements analysis in seven border States Analysis of 20 ports of entry Developed system requirements Phase II – Analyses of Demonstration
12
11 Office of Research and Information Technology Deployment and testing of IBC e-Screening system at 4 border locations Development of partnerships with States and CBP Conduct outreach with stakeholders to deploy system nationally Ensure user needs are met Currently in acquisitions process Phase III – Field Operational Test
13
12 Office of Research and Information Technology Chris Flanigan Office of Analysis, Research, and Technology (202) 385-2384 Chris.Flanigan@dot.gov Questions?
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.