Download presentation
Presentation is loading. Please wait.
Published byRandolf Marsh Modified over 9 years ago
1
OJT 2
2
50% Coding Defense Dec. 4-16 (schedule to be posted soon) Start of user’s manual
3
Technical Manual December before xmas break: finalization of the technical manual Technical Manual: First Draft: Jan. 4, 2009 Start of User’s Manual: First Draft (30%) Acceptance by panels: Jan. 15, 2009 Acceptance form Edited copy: Feb. 1, 2009 Layout, font, screen shots, etc. With certification from the english editor Submission of ready to bind copies: Feb. 15, 2009
4
75% defense January 7 – 13 January 14 -20 ** January 15: user’s manual (50%)
5
90% defense Feb. 1 – 5 at least 75% user’s manual (approved by the content adviser)
6
100% Defense Feb. 15 – 19 February 19. Submission of 100% finished user’s manual (draft copy – accepted by the content adviser) Client acceptance form (for those who have clients) Deployment: for those whose projects are web-based and testing process (you will be required a certain number of “testers”) for those who don’t have clients and will be required a feedback Feb. 26 (final draft, accepted by the members of the panel)
7
Post Implementation / Final Defense Feb. 26 (final draft, accepted by the members of the panel) A week before graduation: Final draft, edited Before graduation: Hard copies of both user’s, technical manual and the source code Forms 2 copies of users manual (for those who have clients)
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.