Download presentation
Presentation is loading. Please wait.
Published byBrent Patterson Modified over 9 years ago
2
Danny Raz Architect Tel: 972-4-8100578 Mobil:972-52-2414878 Fax: 972-4-8380493 D. Pinsky St’ 13 Haifa Israel 34521 ADVANCED CONSTRUCTION SYSTEM moDClik danny@raz-arch.co.il NEW
3
A NEW EASY WAY TO CREATE SPACE FRAME STRUCTURES REGISTERD PATENT
4
LIGHT STRUCTURES FOR MANY PURPOSES THE FASTEST TO CONSTRUCT AND DISMENTEL. FLAXIBLE TO DISGN. EASY TO CHANGE AFTER CONSTRUCTION. STANDART PARTS FOR EVER CHANGING POSSEBILITIES. COMPACT TO STORE AND TRANSPORT. A PERFECT PLATFORM FOR CLIPON PARTS AND PANELS.
5
HOW IT WORKS BY STAGES WITHOUT NEED OF TOOLS OR PROFSIONAL SKILLS THE PICTURES ARE OF A MODEL. THE FINAL PRODUCT IS OF ANODIZED POLISHED ALUMINUM C L I K C L I K TWO BASIC PARTS
6
: IT WORKS AS SIMPLE AS 1 2 AND… 3! YES! SO SIMPLE AND ELEGANT C L I K
7
COMBINATION OF POLIMERS AND ALUMINUM MODCLIK SYSTEM FOR FURNITURES
8
Danny Raz Architect Tel: 972-4-8100578 Mobil:972-52-2414878 Fax: 972-4-8380493 D. Pinsky St’ 13 Haifa Israel 34521 ADVANCED CONSTRUCTION SYSTEM moDClik END OF SUMMERY CONTACT : Raz-arch@zahav.net.il
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.