Presentation is loading. Please wait.

Presentation is loading. Please wait.

CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011.

Similar presentations


Presentation on theme: "CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011."— Presentation transcript:

1 CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011

2 2 © 2011 Electric Power Research Institute, Inc. All rights reserved. Agenda 1.Progress since last meeting 2.Issues, opportunities and risks arising during the previous week 3.Verify progress against stakeholder expectations 4.General issues discussion 5.Action items for individuals 6.Expected work output during next week

3 3 © 2011 Electric Power Research Institute, Inc. All rights reserved. Progress Since Last Call Mark Ortiz furnished VPN client for Consumers server –Windows 64 bit version available EPRI FTP site –Windows 32 bit version also needed Sample messages created

4 4 © 2011 Electric Power Research Institute, Inc. All rights reserved. Paris CIM Interop Test Last Week

5 5 © 2011 Electric Power Research Institute, Inc. All rights reserved. Meter Outage System Test ECITP 2.05 / 2.06

6 6 © 2011 Electric Power Research Institute, Inc. All rights reserved. Outage Management Part 9 Message Mapping Test Procedures Systems Under Test Service Operati ons MessagesPayload XSD XSD created 1.05 Meter Outage Nominal Conformance 1.06 Meter Outage Message and XML Errors 2.05 Meter Outage Nominal Interoperability 2.06 Meter Outage System Errors MDMS, OMS Created Create Reply Create Reply Create Reply EndDeviceEvents MeterServiceRequest MeterServiceRequest EndDeviceControls EndDeviceControls MeterReadings MeterReadings EndDeviceEvents MeterServiceRequest (Message) EndDeviceControls (Message) MeterReadings MeterReadings EndDeviceEventsMessage MeterServiceRequestsMessage MeterServiceRequestsMessage EndDeviceControlsMessage EndDeviceControlsMessage MeterReadingsMessage MeterReadingsMessage

7 7 © 2011 Electric Power Research Institute, Inc. All rights reserved. CIM Common Message Structure

8 8 © 2011 Electric Power Research Institute, Inc. All rights reserved. UML for EndDeviceControls Messages

9 9 © 2011 Electric Power Research Institute, Inc. All rights reserved. Sample CreateEndDeviceEvents Message Create EndDeviceEvent 2011-05-10T12:00:00-05:00 source_identifier of requesting machine Need Sample “Initiate Service” message

10 10 © 2011 Electric Power Research Institute, Inc. All rights reserved. Sample “Last Gasp” Meter Power Outage EndDeviceEvent Message Created EndDeviceEvent 2011-05-10T12:00:00-05:00 2011-11-04T18:52:50.001-05:00 3.26.17.85 Meter Last Gasp loss of power 3dc53ee5-777e-50b4-8699-a1c224f45f3d Meter23253

11 11 © 2011 Electric Power Research Institute, Inc. All rights reserved. Open Action Items AssigneeActionStatus John SimminsWork with internal resources to separate lab network completely from the EPRI operational network. In process Mark OrtizProvide written procedures on access to Consumer’s DMZ network and server In process Kay StefferudContract Mark Ortiz to request written procedures to access the Consumers server. In process Margaret GoodrichReview sample abstract test case.In process Mark OrtizSend Kay excel spreadsheet with test set-up information. In process

12 12 © 2011 Electric Power Research Institute, Inc. All rights reserved. Expected Work Output During the Next Week Meeting with Consumers (Mark) and EnerNex (Kay) –Consumer server login process Continue Sample Messages –Sample message from IOP would be helpful Process to connect multiple test sites needs to be dry run

13 13 © 2011 Electric Power Research Institute, Inc. All rights reserved. Together…Shaping the Future of Electricity


Download ppt "CIM Test Development Process John Simmins Weekly Status and Planning Meeting 4/5/2011."

Similar presentations


Ads by Google