Download presentation
Presentation is loading. Please wait.
Published byCollin Norris Modified over 9 years ago
1
Reducing Development Risk, Time & Costs in M2M / IoT Projects Competitive Advantage in M2M – EDC (Everyware Device Cloud) Robert Andres
2
Toll Stations Traffic Management The Internet of Things M2M Applications are Everywhere … Logistics First Responders Transportation Value Transport Smart Grid Sports Medical Application Vending Reverse Vending Ticketing Farming Green Houses Cool Chain Monitoring Agriculture Automatic Vehicle Location Retail Medical Elderly Living Signage Passenger Information Public Transport Bus Environmental Environmental Monitoring Preventive Maintenance Safety POS Mining Construction Machines Smart City Smart Building Rail Train Research Vessels Green Energy Remote Monitoring Air Conditions Coolers Heating Mainenance Monitoring Mainenance Service Oil & Gas Pump Stations Pipelines Industrial Smart Factory Remote Monitoring Fitness Machines Metering Energy Monitoring Smart Metering
3
Device Cloud Solutions Required Building Blocks M2M Communication Infrastructure Device Firmware / Application Business Application Business Application Sensors & Device Hardware Business Application Integration Machine-to-machine communication solutions can be divided into the following fundamental building blocks:
4
Device Cloud Solutions Where M2M Projects most often fail… M2M Communication Infrastructure Device Firmware / Application Business Application Business Application Sensors & Device Hardware Business Application Integration 1 2 3 4 6 Selecting and integrating sensors, devices, sensors, human machine interfaces (HMI), Meters, legacy field busses & actuators Ensuring long life support Meeting certification requirements Selecting and integrating operating system, device support / drivers Implementing the business logic Optimum M2M protocols WAN cost reduction Security Device data management Device life cycle management Security 5 Decoupling of producers and consumers of data Write speeds Real-time data streams Data storage Standard APIs Ready to use adapters for standard applications CEP / Complex Event Processing capabilities 1 2 3 4 6 5
5
Device Cloud Solutions Everyware Device Cloud as M2M End-to-End Solution M2M Communication Infrastructure Device Firmware / Application Sensors & Device Hardware Business Application Integration Eurotech End-to-End Solution Excellent TCO – Total Cost of Ownership M2M Integration Platform
6
Device to Cloud in 15 Minutes… Could This Get Any Easier? ® Everyware Device Cloud Overview Most complete integrated (end-to-end) Device Cloud Solution in the industry: Hardware Device Software Connectivity Management / Operations Application Integration Financial model
7
Everyware Device Cloud Ensuring best TCO in M2M Projects / Infrastructures Fast Forward, End-to-End with Eurotech Eurotech`s Everyware Device Cloud gives you the advantage: Most Complete Offer from the Edge to the Display Multidimensional Flexibility Future-proof with mitigated risk Dramatically Reduced Cost Fast Time to Market Open and Simplified Development For end-to-end device applications, these benefits combined result in the best TCO (Total Cost of Ownership) at present and a clear competitive advantage for partners and customers that rely on Everyware Device Cloud solutions for their end-to-end device applications.
8
Development Time & Costs Overview Example: Conventional Development Business Application Business Application Communication Infrastructure Device Firmware / Application Sensors & Device Hardware Business Application Integration Time-to-Market: 8-24 Months / Initial Investment: $$$$$$
9
Development Time & Costs Overview Example: Everyware Device Cloud Communication Infrastructure Device Firmware / Application Sensors & Device Hardware Business Application Integration Time-to-Market: 2-6 Months / Initial Investment: $$ Dramatic reduction of time, cost and risk Shorter time to market (TTM) More deterministic development Lower barrier to entry Future proof
10
Development Time & Costs Overview Conventional Approach vs. Everyware Device Cloud Time-to-Market: 2-6 Months / Initial Investment: $$ Communication Infrastructure Device Firmware / Application Sensors & Device Hardware Business Application Integration Time-to-Market: 8-24 Months / Initial Investment: $$$$$$ Competitive Advantage ! Dramatic reduction of time, cost and risk
11
Eurotech Value Proposition We help Customers focus on their core competencies Competitive Advantage Dramatic reduction of time, cost and risk Shorter time to market More deterministic development Lower barrier to entry Future proof Higher value-add for Customers. Providing enabling platforms, not just components!
12
Eurotech Value Proposition Modular but Integrated Offering Boards & Modules Devices & Systems Value Add Software & Services Vertical Application Solutions Enabling our customers to focus on their core competencies Service & Support Adding Value
13
© 2013 Eurotech. All rights reserved This presentation has been prepared by Eurotech S.p.A. (or “Eurotech”). The information contained in this presentation does nor purport to be comprehensive. Neither Eurotech nor any of its officers, employees, advisers or agents accepts any responsibility for/or makes any representation or warranty, express or implied, as to the truth, fullness, accuracy or completeness of the information in this presentation (or whether any information has been omitted from the presentation) or any other information relating to Eurotech, its subsidiaries or associated companies, whether written, oral or in a visual or electric form, transmitted or made available. The information in this document is proprietary to Eurotech. No part of this document may be reproduced, copied, or transmitted in any form or for any purpose without the express prior written permission of Eurotech. The distribution of this document in other jurisdictions may be restricted by law, and persons into whose possession this document comes should inform themselves about, and observe, any such restrictions. No reliance may be placed for any purposes whatsoever on the information contained in this document or any other material discussed during this presentation, or on its completeness, accuracy or fairness. Eurotech assumes no responsibility for errors or omissions in this document. Eurotech does not warrant the accuracy or completeness of the information, text, graphics, links, or other items contained within this material. This document is provided without a warranty of any kind, either express or implied, including but not limited to the implied warranties of merchantability, fitness for a particular purpose, or non-infringiment. The information in this document and any other material discussed at this presentation is subject to verification, completion and change. The information and opinions contained in this document are provided as at the date of the presentation and are subject to change without notice. Some of the information is still in draft form and will only be finalized. By attending the presentation you agree to be bound by the foregoing terms. Trademarks or Registered Trademarks are the property of their respective owners.
14
www.eurotech.com Thank You! www.eurotech.com
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.