Left side compressor behind Left control box Right side compressor behind Right control box
2
Compressor Oil Sight Glass During normal operation sight glass should be ¼ to ¾ full of Oil System must run for 20 minutes prior to checking oil level
3
Opening the Discharge Access Valve Remove Valve Cap Turn CCW with wrench to back seat
4
Opening the Suction Access Valve Remove Valve Cap Turn CCW with wrench to back seat
5
Compressor Service Valves Open to the system - with access to the service connection!
6
Compressor Service Valves Flow from the compressor to the Suction or Discharge line is stopped Closed to the system - with Compressor Pressure access to the service connection!
7
Manifold Gauge Sets High Side Gauge Low Side Gauge - Compound Gauge Utility Hose High Side Hose Low Side Hose
8
Compound Gauge Positive Pressure Scale Built-in PT Charts Adjustment Screw Vacuum Scale (Reference Only!)
9
MGS - Frontseated Each Gauge is isolated to it’s Hose! High Side Hand Valve Low Side Hand Valve
10
MGS – Low Side Backseated High Side Hand Valve Low Side Hand Valve
11
MGS – High Side Backseated High Side Gauge and Utility Hose open to High Side! High Side Hand Valve Low Side Hand Valve
12
Installation, Purging & Removal of Manifold Gauge Sets (MGS)
13
Purging a MGS If MGS is new, was exposed to atmosphere or used on a different refrigerant, you must purge them! Remove Compressor Service Valve Stem Caps and insure valves are fully backseated. Remove Access Port Caps. Install High Side Hose and Low Side Hose.
14
Purging a MGS Do Not Connect the Utility Hoses. Backseat the high side MGS hand valve. Leave low side MGS hand valve frontseated. Open Discharge Service Valve - 1/4 turn. Use purge fitting to purge contaminants from utility hose. Frontseat high side MGS hand valve. Repeat process for low side.
15
Installation of MGS Remove Compressor Service Valve Stem Caps and insure valves are fully backseated. Remove Access Port Caps. Frontseat MGS hand valves. Install High Side Hose. If MGS has positive pressure and was used for the same refrigerant, purging is not necessary.
16
Installation of MGS Install Low Side Hose. Connect Utility Hose to MGS dummy port. Midseat Discharge Service Valve - 1/4 turn Midseat Suction Service Valve - 1-2 turns. Gauges are now installed and ready for checking system pressures!
17
Removal of MGS With the unit operating. –Backseat the Discharge Service Valve. –Midseat the MGS Hand Valves. –Let the pressure in the MGS stabilize to Suction Pressure. –Frontseat the MGS Hand Valves. –Backseat the Suction Service Valve. –Remove Hoses.
18
Low Side Pump-down Purpose –To perform general service on the Filter-drier, Modulation Valve, Suction Solenoid Valve, Heat Exchanger and TXV Valve. Procedure –Install Manifold Gauge Set. –Operate unit in Cool Mode for 15 - 20 minutes. –Close the Liquid Line Hand Valve.
19
Low Side Pump-down Procedure (con’t) –Monitor the Low Side Gauge and shut unit OFF when it reaches a slight vacuum (5” hg max.) –Monitor the Low side gauge: Pressure rises above 2-3 PSIG - pump down again! Pressure does not rise above 2-3 PSIG - continue! –Front-seat the Suction Service Valve. All Refrigerant is now trapped in the Condenser and the Receiver tank!
20
Manifold Gages hooked up to monitor Refrigerant Pressures
21
Refrigerant Charging with Manifold Gages Cylinder Valve R404a refrigerant cylinder
22
You can now service: