Download presentation
Presentation is loading. Please wait.
Published byBernard Small Modified over 9 years ago
1
“ The Champions ” Consulting Firm By Simon Foucher Kenny Somerville Leo Pérez Saba Shadi Mohamed Geneviève Lavigueur
2
AGENDA Market Overview Problem Definition Analysis of Variances Analysis of the Results Qualitative Analysis Recommendations Conclusion
3
Manufactures and sells patio chairs: Metal model Plastic model (lesser quality) Market increased by 10% more than forecasted MARKLEY DIVISION & ITS MARKET
4
Ineffective budgeting & control system: Unable to understand causes of variances Not able to implement pro-active corrective measures PROBLEM DEFINITION
5
(In thousands of dollars) Actual Results Static Budget Favorable (Unfavorable) Total Sales $930$875$55 F Total Variable Costs $735.8$702.5$(33.3) U Total Other Costs $155.8$101.5$(54.3) U Divisional operational income $38.4$71 $(32.6) U STATIC VARIANCES
6
FLEXIBLE BUDGET
7
(In thousands of dollars) Actual Results Flex Bud Variance Flex Budget Volume Variance Static Budget Total Sales $930 $30 F $900 $25 F $875 Total Var. Costs $735 $(16.8) U $719 $(16.5) U $702.5 Total Other Costs $155.8 $(54.3) U $101.5 - Divisional operational income $38.4 $(41.1) U $79.5 $8.5 F $71 FLEXIBLE BUDGET VARIANCES (L2)
8
SALES VOLUME VARIANCE STATIC BUDGET VARIANCE (In thousands of dollars) Actual Results Flex Bud Variance Flex Budget Volume Variance Static Budget Divisional op. income $38.4 $(41.1) U $79.5 $8.5 F $71 FLEX BUDGET VARIANCE $ (41.1) U$ 8.5 F $ (32.6) U FLEXIBLE BUDGET VARIANCES (L2)
9
(In thousands of dollars) Actual Results Flex Bud Variance Flex Budget Volume Variance Static Budget Var. MFG Cost Variance $49.6 $(49.6) U - - - FLEXIBLE BUDGET VARIANCES (L2) Who is responsible? What corrective measures can be applied?
10
Qty Purchased x (Price – Budget) 60,000 x ($5.65 - $5.00) = $(39,000)30,000 x ($6 - $6) = $0 MATERIALS PRICE (L3)
11
(Qty Used – Budget) x cost (56,000 – 55,000) x $5 = $(5,000)(23,000 – 22,500) x $6 = $(3,000) MATERIALS EFFICIENCY (L3)
12
Hours used * (Price – Budget) 9,300 x ($6 - $6) = 0$5,600 x ($8 - $8) = $0 DIRECT LABOUR PRICE (L3)
13
(Hrs Used – Allowed) x Cost (9,300 – 55,000/6 ) x $6 = $(800)(5,600 – 22,500/4) x $8 = $200 DIRECT LABOUR EFFICIENCY (L3)
14
(Tot.Var.OH/Budget DLH – Budget Rate) x DLH Used (43k+50k+19k)/9.3k = $12.04 ($12.04 - $12) x 9300 = $(400) (18k+15k+12k)/5.6k = $8.04 ($8.04 - $8) x 5,600 = $(200) VARIABLE OH SPENDING (L3)
15
(Hrs Used – Budgeted) x Rate (9,300 - 55k/6) x $6 = $(1,600)(5,600 – 22.5k/4) x $8 = $200 VARIABLE OH EFFICIENCY (L3)
16
DLDMVar OHTotal EFFICIENCY METAL200(3,000)200(2,600) PLASTIC(800)(5,000)(1,600)(7,400) SPENDING METAL(200) PLASTIC(400) PRICE METAL PLASTIC (39,000) Total(600)(47,000)(2,000)(49,600)
17
Effect on Balance Sheet
18
CM of metal is twice that of plastic. Majority of the variances come from flexible budget variance ($41,100 U) Mostly cost of plastic: $39,000 U Efficiency Plastic: ($7,400U) Metal: ($2,600U) ANALYSIS OF RESULTS
19
Fluctuations in inventory due to: Purchasing more materials than required Building inventories for Metal Liquidating inventories for Plastic These fluctuations do not affect the IS ANALYSIS OF RESULTS
20
QUALITATIVE ANALYSIS Major causes of variances: Purchase prices of raw materials Waste Intra Q1 status report without details: Management was not able to implement corrective actions.
21
Q1 average price of plastic (10.50$) might be due to raising list price as corrective measure Sales volumes were: Higher for lower CM item (Plastic @14%) Lower for higher CM item (Metal @27%) QUALITATIVE ANALYSIS
22
RECOMMENDATION Implement a flexible budget and update it monthly Change list prices: Plastic +1$ Metal -1$ Adjust the budgeted costs per unit
23
CONCLUSION PERCENT % TABLE
Similar presentations
© 2025 SlidePlayer.com. Inc.