Professional Engineering Services For Restoration Project John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction John Mitnik, P.E. Engineering & Construction Bureau Chief Operations, Maintenance & Construction Pre-Proposal Meeting November 21, 2013
2
The PROJECT Part 3 Section 4 describes the PROJECT as: The PROJECT contains restoration activities for refurbishing, enhancing and/or adding components... while also accomplishing the additional needs of the environment... Restoration activities under the PROJECT may include, but not be limited to: stormwater treatment areas, flow equalization basins, reservoirs... as contained within the District’s Restoration Strategies Regional Water Quality Plan, Comprehensive Everglades Restoration Plan and Northern Everglades and Estuaries Protection Plan.
3
Which consists of:... design and construction management of various restoration activities further described as being similar in nature but not limited to high and low hazard embankments and levees, associated canal excavation/bank stabilization, stormwater pump stations, control structures, spillways, bridges, monitoring systems, communication... and control systems... the associated features of grading, paving & drainage systems and electrical facility improvements... including architectural, structural, mechanical, electrical and landscaping components,... Refurbishment/retrofitting of existing facilities, rather than design of new facilities, may be applicable to any of the restoration activities listed above The PROJECT
4
Water Control Structure - Spillway Reinforced Concrete Gated Spillway Vertical lift roller gates Type Hoist: Electric Motor drum and Cable hoist; or portable power-drive for manual operations Control by remote telemetry through SFWMD SCADA system Normal Power Source: Commercial Electricity Emergency Power Source: Portable Backup generator
5
Water Control Structure – Culvert Reinforced Concrete Box Culvert CMP pipe Non-gated as well as Gated culvert structure 5
6
Architectural Design - Control Building TYPICAL CONTROL BUILDING PLAN TYPICAL CONTROL BUILDING ELEVATION
7
Levee, Embankments, and Dams Seepage Analysis Wind and Wave Analysis Freeboard Analysis Seepage Management
8
Canals Bank Stabilization / Slope Stability Erosion Protection Hydraulic conveyance Operating Plans
9
Pump Stations Vary in Size from 100 cfs to 3000 cfs Diesel, Electric, Natural Gas, or Dual Fuel Flood Control and Non-flood control
10
Additional Services Construction Management Inspections Engineering During Construction
11
Things To Touch On Methodology and approach to the PROJECT Quality Assurance / Quality Control Schedule Cost Control Anticipated volume of work $150M
12
Questions? For more information on Restoration Strategies and CERP please refer to the following websites: www.sfwmd.gov/restorationstrategies www.evergladesplan.org