Download presentation
Presentation is loading. Please wait.
Published byLeslie Barry Modified over 11 years ago
1
Work Package 9 Task 9.5: Granular Calorimeter Studies Infrastructure Felix Sefkow AIDA Kick-off Meeting CERN, February 17, 2011
2
2 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Outline Proposal –Partners –Deliverables and Milestones –Description of work Sub-tasks Look ahead –fill it with life Meeting and reporting
3
3 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Proposal WP 9: Infrastructure for detector R&D, 2.6M out of 8M Calorimetry 0.75M, cf EUDET: 1.99M of 7M total Much smaller budget, but still aim at integrating all active European partners Enlarged community: DHCAL effort grown after EUDET start AIDA is only a small part of CALICE and FCAL activities Proposal kept vage and general
4
4 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Partners CERN UCL - Louvin IPASCR - Prague CNRS –IPNL Lyon –LAL Orsay –LAPP Annecy –LLR Palaiseau –LPC Clemront –LPSC Grenoble DESY UHEI ( third party) MPG-MPP Munich Wuppertal TAU Tel Aviv UIB Bergen AGHUST Kracow IFJPAN Kracow CIEMAT Madrid (3rd p) 18 groups, 10k/y
5
5 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Deliverables D 9.7: Integrated infrastructure for highly granular calorimeters –Due month 40 (May 2014), lead DESY D 9.9: Adequation of Geant 4 simulation of hadronic showers in different media (report) –Due month 46 (Nov 2014), lead DESY In WP 9.1, but probably requesting input: D 9.8: Infrastructure performance and utilization (report) –Due month 46 (Nov 14), lead CSIC
6
6 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Milestones MS 42 Gas system, control and bench structure –due month 24 (Jan 2013), lead CNRS-LAPP MS 43 3rd generation fast read-out chips –due month 30 (Jul 2013), lead CNRS-LAL MS 44 Multilayer tungsten structure with position control and monitoring for forward calorimeters –due month 30 (Jul 2013), lead DESY-Z MS 45 Calibration and power supply system –due month 36 (Jan 2014), lead UIB MS 46 Electromagnetic calorimeter of at least 18x18cm 2 area –due month 36 (Jan 2014), lead CNRS-LLR MS 47 Multichannel readout ASICs for luminosity detector –due month 40 (May 2014), lead AGH-UST
7
7 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Description of Work Mechanical structure to place and move elements –CERN, DESY, UCL, CIEMAT Lumical structure, W radiator and ASICs –DESY, TAU, AGH-UST, IFJPAN ECAL extension of the EUDET module –IPASCR, CNRS-LAL, -LPSC, -LLR Hadronic structure with tungsten radiator and services –CERN, DESY, Wuppertal, MPG-MPP, IPASCR, CNRS-LAL, -IPNL, - LAPP, -LPC, UIB, UCL, CIEMAT
8
8 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Sub-tasks ECAL: Daniel Jeans –LLR, LPSC, IPASCR AHCAL: Erika Garutti –CERN, DESY, MPG-MPP, IPASCR, UIB, Wuppertal DHCAL: Imad Laktineh –LAPP, IPNL, LPC, CIEMAT, UCL FCAL: Wolfgang Lohmann –CERN, DESY, AGH-UST, IFJPAN, TAU FEE: Nathalie Seguin-Moreau –LAL, UHEI TBM: Erik van der Kraaij –CERN, DESY, UCL, CIEMAT
9
9 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 ECAL R.Poeschl
10
10 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 ECAL
11
11 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 ECAL plans
12
12 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 AHCAL E.Garutti
13
13 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 AHCAL
14
14 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 AHCAL plans
15
15 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 DHCAL I.Laktineh
16
16 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 DHCAL
17
17 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 DHCAL plans
18
18 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 DHCAL plans
19
19 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 FCAL
20
20 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 FCAL
21
21 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 FCAL plans
22
22 AIDA Kick Off meeting: WP9.5 FEE Second generation ASICs for EUDET Auto-trigger, analog storage, digitization and token-ring readout Power pulsing : <1 % duty cycle Optimize commonalities within EUDET (readout, DAQ…) Dedicated run produced in March 2010 –25 wafers received in June –20 000 chips packaged in the US FLC_PHY3 (2003) HARDROC2 SDHCAL RPC 64 ch 20 mm 2 SKIROC2 ECAL Si 64 ch. 65 mm 2 SPIROC2 AHCAL SiPM 36 ch 32 mm 2 G.Martin
23
23 AIDA Kick Off meeting: WP9.5 FEE WP9.5: electronics readout 1st year: –Characterization of the 2 nd generation ROC chips –Testbench/testbeam measurements Prototyping of the 3 rd generation of ROC chips. Main modifications: –New Slow Control with I2C link For all the ROC chips –New digital part: Independent channels (all chips ?) Read-Out, BCID management New TDC (step=1 ns, no dead time): –For SKIROC3 and SPIROC3 New SCA: –For SPIROC3 and SKIROC3 Circular memory for HARDROC3 ? –Analog part Preamp modifications for SPIROC3 HARDROC2 SDHCAL RPC 64 ch 20 mm 2 SKIROC2 ECAL Si 64 ch. 65 mm 2 SPIROC2 AHCAL SiPM 36 ch 32 mm 2
24
24 AIDA Kick Off meeting: WP9.5 FEE MILESTONES and SCHEDULE Milestones: Report in 30 months (August 2013) AIDA budget for 3 rd generation of electronics: –78 k (equipment) => 2 chip submissions (Hardroc3 and Spiroc3) –30 ppm Cost: –Multi Project runs (MPW): 1k/mm2 –Packaging: $3500 –Test-board: 1500 Schedule –1 st chip : SPIROC3 Submission March 2012 Reception June 2012 1 year for tests and report –2 nd chip : HARDROC3 Submission March 2013 Reception June 2013 1 year for tests HARDROC2 SDHCAL RPC 64 ch 20 mm 2 SKIROC2 ECAL Si 64 ch. 65 mm 2 SPIROC2 AHCAL SiPM 36 ch 32 mm 2
25
25 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 TBM E. van der Kraaij
26
26 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 TBM plans
27
27 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Meetings The sub-task structure just reflects the more global LC R&D organization, no new structures Projects will be followed in CALICE and FCAL –technical meetings as necessary Expect AIDA annual meetings few months before reports –WP 9.5 parallel session Suggest regular task leader phone meetings to stay in touch –milestone reports
28
28 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Reporting
29
29 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Summary Excellent starting point from EUDET Transition ensured Clear project structure Tantalizing visions Lets make it a success!
30
30 Back-up slides
31
31 MC WP 9.5: Calo Summary Felix Sefkow CERN,, Feb 17, 2011 Budget
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.