1 Broward County-wide Master Reuse Plan
Southeast Florida Utility Council March 10, 2014 Develop a regional reuse master plan Broward County, Municipalities, and Water Providers Short term Work to establish a regionally coordinated master plan for the development and delivery of reclaimed water on a county-wide basis.

2 Presentation Overview - Road Map
Where we started: Background Goals What we did: Team Selection Scope Development Project Tools Development Where we’re going: Implementation Planning, and Data Collection

3 BACKGROUND

4 Background: Water Resources Task Force
Task Force Report - January 2011 Included 40 recommendations in the areas of: Water conservation Reuse planning and development Regional water supply projects Investigation and modeling Recommendations addressed regional water resource needs ensuring the sustainability of the environment, the quality of life for the residents as well as the economic vitality of the region. The Technical Team was directed to give special consideration to reuse opportunities as part of later development of regional water supply alternatives for the Task Force’s consideration.

5 Background: Water Resources Task Force
Eleven (11) recommendations specific to reuse including; Recommendation #19 Regional Reuse Master Plan 20) Recognize utility investments in reuse – Pursue a system of allocated alternative water supply credits for utilities that pay for reuse. (SFWMD and Water Providers – short term) 21) Develop and maintain a regional coverage of local reuse infrastructure – Support County efforts to develop a regional GIS coverage of local reuse infrastructure for use in future 22) Coordinate with the Florida Department of Transportation (FDOT) – Work with the FDOT to obtain annual updates 23) Coordinate with the Florida Department of Environmental Protection (FDEP) Reuse Work Group and related entities 24) Utilize corridors in reuse planning efforts – Investigate the use of rights-of-way, canals and other waterbodies for laying reuse lines. 25) Coordinate with the Broward County Metropolitan Planning Organization (MPO) 26) Update local 5-Year Capital Improvement Plans (CIP) – Phase into 5-year CIPs the necessary infrastructure to more fully utilize available reclaimed water supplies 27)Amend land use and comprehensive plans – Encourage better integration of reuse planning and projects in future development and redevelopment plans 28) Further the use of reclaimed water for irrigation – Develop new county and/or municipal ordinances, or amend current ordinances establishment of mandatory reuse zones, fully considering the availability of flows, proximity of irrigation systems to reclaimed water lines, costs and

6 Background: Water Reuse Challenges
Developed urban areas 25 distinct water providers 15 distinct wastewater providers Seasonal demand fluctuations Treatment costs/disposal options RWAR- limiting traditional water sources Ocean outfall legislation (Senate Bill 1302) requiring the elimination of treated wastewater disposal via ocean outfalls and the transfer of 60% of facility actual flow on an annual basis to beneficial reuse applications by Two of the six ocean in Broward County. The combined flows of these two facilities is approximately 77.5 MGD; hence, fulfillment of obligations under this legislation will require that 46.5 MGD of current wastewater flows be redirected to beneficial reuse applications within Broward County.

7 Background: Water Reuse Drivers
Key Drivers in the Past Key Drivers Today Water/Wastewater concurrency Saltwater intrusion Costs for alternatives Regional Water Availability Rule Ocean Outfall Rule Climate Change Regulatory Requirements RWAR- limiting traditional water sources Ocean outfall legislation (Senate Bill 1302) requiring the elimination of treated wastewater disposal via ocean outfalls and the transfer of 60% of facility actual flow on an annual basis to beneficial reuse applications by Two of the six ocean in Broward County. The combined flows of these two facilities is approximately 77.5 MGD; hence, fulfillment of obligations under this legislation will require that 46.5 MGD of current wastewater flows be redirected to beneficial reuse applications within Broward County.

8 Background: Regulatory Reuse Drivers
Reclaimed Water Feasibility Study Renewing Facility Permits Renewing Water Use Permits Renewing UIC Permit

9 Background: Reuse Master Plan Goal
To develop a Regional Reuse Master Plan that will build upon current municipal and county efforts and coordinate a regional approach to reuse planning, maximizing cost-effective reuse development within Broward County To create a platform for shared communication To provide flexible and interactive planning tools reduce demands on the Biscayne Aquifer, the development of alternative water supplies, and fulfills legislative and consumptive use permit requirements for reuse development.

10 Coordination & Tool Development

11 Work Effort: Team Selection
Water and Wastewater Providers/Local Gov’ts Consultants Hazen and Sawyer, P.C. Craven Thompson & Associates, Inc. Cordova Rodriguez & Assoc., Inc. Steve Lamb Broward County: Natural Resources Planning and Management Development and Environmental Review BC Water and Wastewater Services FLDEP, DOH, DOT, SFWMD

12 Work Effort: Team Collaborations
Review of Previous Studies/Reports Stakeholder Meetings Stakeholder Specific Interactive Project Analysis Reclaimed Water Planning Tools Development

13 Work Effort: Tool Production
GIS Reclaimed Water Planning Tool Project Evaluation Model ...tools can be easily adapted and updated as reclaimed water needs and drivers change over time

14 Work Effort: GIS Planning Tool
Foundation for data storage and interpretation Database of existing and planned reclaimed water infrastructure Addition of planned County Public Works Projects Google Earth platform allows for easy manipulations of alternatives Tool was used to develop proposed regional projects

15 Work Effort: BC WWS Example
Broward NRWWTP 5 Miles 3 Miles 1 Mile Broward WWS Utility Boundary Evaluated potential users based on distance from WWTP Two scenarios: With utility boundaries Without utility boundaries

16 Within Utility Boundary
Work Effort: BC WWS Example, cont. Scenarios Within Utility Boundary No Utility Boundary No. of Customers Demand (mgd) Potential Partners One mile radius 3 0.37 4 0.39 Pompano Beach Three mile radius 38 3.63 78 9.42 Pompano Beach, Deerfield Beach, Margate Five mile radius 59 4.55 154 13.83 Pompano Beach, Deerfield Beach, Margate, Coral Springs, Fort Lauderdale, North Lauderdale, Parkland

17 Work Effort: Project Evaluation Model
Criteria were developed with stakeholders Final criteria included the following categories Project Benefits Project Implementation Project Reliability General Acceptance of Project Project Costs Weights and scaling factors were established Model is in Excel – simplifies revisions

18 Work Effort: Master Reuse Plan
Existing and planned reclaimed water infrastructure Planned County Public Works projects Costs and carbon footprint of potential reclaimed water projects Climate change impacts on reclaimed water options Potential reclaimed water opportunities by utility Regional reclaimed water projects Regional projects using Criteria Model Guidelines for future maintenance of tools

19 Future implementation

20 Implementation: Benefits
Current: Database of existing reclaimed water infrastructure-not previously available Catalyst for multijurisdictional partnering Documents reuse projects for future funding under SB 444 or other Future: Reduction in engineering costs for future planning efforts Ability to visually analyze options Platform to coordinate with future public works projects and potentially reduce construction costs

21 Implementation: Potential Projects for Analysis

22 Implementation: Criterion

23 Implementation: Initial
Initial Implementation Plan is based on criteria today The Implementation Plan is flexible Will be updated as drivers change over time To be updated by utilities in the future

24 Implementation: Preliminary
Regional Projects Implementation Phasing Capital Cost per Gallon Total Capital Cost Reason for Grouping: Project Name Reclaimed Water Demand (mgd) Phase & Timing MGD per Phase Cumm. MGD BC - PBC Agreement (to PBC) 15.00 I 24.54 $5.43 $104M ongoing/ocean outfall requirement BC - PBC Agreement (within BC) 4.2 Sunrise Sawgrass Large User - Phase A 2.00 $14.62 $29M ongoing/ FDEP permit requirement Davie Large User - Phase A 3.34 $10.23 $34M ongoing/outfall compliance Cooper City (credit sharing with other) 0.96 II 23.61 48.15 TBD outfall compliance by 2025 Pompano Beach Residential Irrigation – Phase A for BC Outfall Compliance 2.25 Hollywood Aquifer project 20.40 $ $13.82 $182M - $282M Plantation Large User 3.92 III 13.87 62.02 $6.66 $26M score 40-50 Margate Large User 1.83 $9.10 $17M Miramar Large User (across boundaries or with Pembroke Pines Effluent) 8.12 $8.64 $70M Pompano Beach Residential Irrigation – Phase B 1.58 IV 9.12 71.14 $10.42 $16M score 30-40 Davie Large User - Phase B 0.85 $9M Sunrise Springtree 2.72 $8.14 $22M Sunrise Sawgrass Large User - Phase B 3.97 $9.71 $39M CSID Large User 2.17 V 3.86 75.00 $10.83 $24M score <30 Sunrise Southwest Large User 0.69 $15.45 $11M Fort Lauderdale - unidentified 1.00

25 Implementation: Preliminary
Regional Projects Implementation Phasing Capital Cost per Gallon Total Capital Cost Reason for Grouping: Project Name Reclaimed Water Demand (mgd) Phase & Timing MGD per Phase Cumm. MGD BC - PBC Agreement (to PBC) 15.00 I 24.54 $5.43 $104M ongoing/ocean outfall requirement BC - PBC Agreement (within BC) 4.2 Sunrise Sawgrass Large User - Phase A 2.00 $14.62 $29M ongoing/ FDEP permit requirement Davie Large User - Phase A 3.34 $10.23 $34M ongoing/outfall compliance Cooper City (credit sharing with other) 0.96 II 23.61 48.15 TBD outfall compliance by Pompano Beach Residential Irrigation – Phase A for BC Outfall Compliance 2.25 Hollywood Aquifer project 20.40 $ $13.82 $182M - $282M

26 Reclaimed Water Demand (mgd)
Implementation: Phase I Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners BC - PBC Agreement (to PBC) 1 15.00 $104 M Palm Beach County, Deerfield Beach, Coconut Creek BC – PBC Agreement (within BC) 1 4.20 Sunrise Sawgrass Large User – Phase A 2 2.00 $29 M Plantation Davie Large User – Phase A 3 3.34 $34 M Sunrise PHASE I RECLAIMED WATER DEMAND 24.54 1 – BCWWS will progress in incremental amounts. 2 – City is required to construct 2 mgd but may install additional capacity. 3 – Town is presently constructing.

27 Reclaimed Water Demand (mgd)
Implementation: Phase II Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners Cooper City Credit Sharing 1 0.96 TBD Pompano Beach Residential Irrigation – Phase A for BCWWS 2 2.25 -- Hollywood Floridan Aquifer 20.40 $182 M –$282 M PHASE II - RECLAIMED WATER ADDED 23.61 TOTAL RECLAIMED WATER DEMAND 48.15 1 – City will pay another utility to construct for ocean outfall compliance. 2 – BCWWS compliance alternative for ocean outfall compliance.

28 Reclaimed Water Demand (mgd)
Phase III – Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners Plantation Large User 3.92 $26 M -- Margate Large User 1.83 $17 M Miramar Large User (with additional effluent, if desired) 8.12 $70 M Pembroke Pines, Cooper City PHASE III - RECLAIMED WATER ADDED 13.87 TOTAL RECLAIMED WATER DEMAND 62.02

29 Reclaimed Water Demand (mgd)
Phase IV – Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners Pompano Residential Irrigation – Phase B 1.58 $16 M -- Davie Large User – Phase B 0.85 $9 M Sunrise Sunrise Springtree Large User 2.72 $22 M Lauderhill, Tamarac Sunrise Sawgrass Large User – Phase B 3.97 $39 M PHASE IV - RECLAIMED WATER ADDED 9.12 TOTAL RECLAIMED WATER DEMAND 71.14

30 Reclaimed Water Demand (mgd)
Phase V – Project Name Reclaimed Water Demand (mgd) Total Capital Cost Partners CSID Large User 2.17 $24 M Coral Springs, Tamarac Sunrise Southwest Large User 0.69 $11 M FPL Fort Lauderdale - Unidentified 1.00 TBD PHASE V - RECLAIMED WATER ADDED 3.86 TOTAL RECLAIMED WATER DEMAND 75.00

31 Implementation: Phase I 2015-2020

32 Implementation: Phase II 2020-2025

33 Implementation: Future !!!

34 Questions? Barbara A.Powell (954)

35 Weights Established by Stakeholders
Example: Project Costs Criteria Criterion No. Criterion Criterion Weight (Plantation) Criterion Weight (others) 18 Available Funding Assistance 5% 19 Capital Costs 60% 45% 20 Operation and Maintenance Costs 18% 15%

36 Criterion Values Included in Model
No. Criterion Description Criterion Values 2 Potable Offset Indicates if Utility has a need for AWS 0 = No need 2 = Provides AWS 3 Susceptibility to Climate Change Sensitivity of project to climate change/SLR. 0 = Benefits will be significantly lower 1 = Benefits will be moderately lower 2 = Benefits are NOT expected to change 3 = Benefits will increase 4 Complies with Outfall legislation or permit requirement Indicates compliance with reuse requirements 0 = Does not meet/not required 1 = Project partially meets requirements 2 = Project fully meets


Download ppt "Broward County-wide Master Reuse Plan"