North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010.

Similar presentations


Presentation on theme: "North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010."— Presentation transcript:

1 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Wide Masterplan December 13, 2010

2 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Mission Statement: "The mission of the North Scott Community School District, a unique blend of rural and metropolitan opportunities, is to produce graduates with the capacity to be successful in a changing world, by incorporating abundant resources and offering a broad-based curriculum in a respectful, safe environment." Masterplan Process: The North Scott Community School District is currently faced with several challenges. With continued growth of community populations, there is need for expansion or redirection of the current district facilities. The Masterplanning process has included input of District administration, building administrators, staff and school board. It was determined that Long Term growth would consist of building need in a period of ten or more years from present day. The focus group took on the challenge of reviewing current and future needs for long term growth. Through review of the needs assessment results and comments, this group structured a document that would consider all of the long term requirements for each school facility. This was treated as a “wish” list for the school facilities. In addition, the existing school facilities and property were tabulated for analysis. “Wish” list need includes both building spaces and outdoor spaces or concerns.

3 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Facilities: Senior High School Currently Grades 9-12 Constructed 1957 Numerous expansion, renovation, and remodeling projects Building Population 967 students 206,000 square feet in size Junior High School Currently Grades 7-8 Ed White sixth graders currently in this building Constructed 1974 Expanded in 200 and 2008 Building Population 450 students 104,000 square feet in size

4 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Facilities: Ed White Elementary Currently Grades K-5, serving Eldridge White sixth graders currently at Junior High School Constructed 1966 Numerous expansion, renovation, and remodeling projects Building Population 458 students 44,500 square feet in size John Glenn Elementary Currently Grades K-6, serving Donahue and portion of Eldridge Glenn houses preschool programs for the District Constructed 1966 Numerous expansion, renovation, and remodeling projects Building Population 233 students 30,700 square feet in size

5 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Facilities: Alan Shepard Elementary Currently Grades K-6, serving Long Grove and a portion of Eldridge Shepard houses state based 4-yr old preschool program Constructed 1966 Numerous expansion, renovation, and remodeling projects Building Population 310 students 43,700 square feet in size Neil Armstrong Elementary Currently Grades K-6, serving Park View Constructed 1975 Expanded in 2000 and renovated in 2005 and 2006 Building Population 321 students 40,900 square feet in size

6 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Facilities: Virgil Grissom Elementary Currently Grades K-6, serving Princeton Grissom houses preschool programs for the District Constructed 1966 Numerous expansion, renovation, and remodeling projects Building Population 229 students 29,850 square feet in size District Administration Constructed in 1978 6 Private Offices 6 Workstations Board Room Conference room/break room Superintendent currently in board room

7 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Facilities: Vehicle Maintenance Pre-engineered metal building constructed in 1978 Three maintenance bays Communications system Transportation office Buses stored in parking lot District Maintenance, Grounds and Print Shop Constructed in 1979 and repaired in 2005 Wood frame structure Houses print shop, maintenance offices, maintenance storage, grounds department operations and grounds storage.

8 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS District Facilities: Lancer Stadium Football field, track and grandstands reconstructed in 2009 Visitor bleachers Ticket booths, rest rooms, storage and concessions Sports Complex Soccer Field Baseball Field 12 Tennis Courts Softball field is located on High School grounds

9 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Masterplanning Goal: Plan for all facilities for use throughout the entire school district. Masterplan to serve as Blueprint for facilities for next 10-15 years.

10 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Long Term and Short Term Goals: Attract and accommodate population. Elementary sites as community center. These buildings will have continued changing use. Update the exterior appearance of facilities. Improve aesthetic of public appearance. Update technology in all facilities. Provide opportunities for multiple activities. Educational facilities to adapt with changes in curriculum, technology, pathways, etc. Desire to provide best educational space possible. Desire to be environmentally friendly.

11 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Programmatic Needs of Facilities: Safe planning of parking and access considerations (traffic flow). Separation of cars, busses and pedestrians for safety on site. Green space: Maintain or provide adequate green space for aesthetic as well as curriculum based needs. Provision for adequate technology. Buildings and rooms shall be capable of housing the needed technology which is required by the changing curriculum. Improve the appearance of each building and the district for visitors. Improved entrances and exteriors. Possibly clean up or modify the area between the District Administration and the Senior High School. Accessibility at all facilities within the district. Rooms to allow easier implementation of co-teaching and interactivity. Adjoining doors or proximity of classroom doors to be considered.

12 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Programmatic Needs at Elementary School Facilities: White, Shepard and Armstrong: These facilities potentially to serve as three section buildings. All purpose room - Flexible space to be used for educational, meeting and other group functions. Possible to serve as cafeteria for these buildings. Staff work/conference space - Provision for a meeting and work/task area for teachers and staff within each building. Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance. Adequate parking, safety of building access.

13 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Programmatic Needs at Elementary School Facilities: Glenn and Grissom: These facilities potentially to serve as two section buildings. All purpose room - Flexible space to be used for educational, meeting and other group functions. Staff work space - Provision for a meeting and work/task area for teachers and staff within each building. Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance. Adequate parking, safety of building access.

14 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Programmatic Needs at Elementary School Facilities: Junior High School: Band/Orchestra/Choir rooms not meeting needs of the program. Need to define the programmatic needs of these spaces to determine changes required. Concerns with PA system. Staff work space - Provision for work/task area for teachers and staff. Update of restroom spaces, and inclusion of faculty rest room. Update/expand main office area. Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance. Meeting room/conference space - flexible meeting/multi-purpose room. Possibility of team meeting room and teacher work space as a combined space. Consideration for grouped teacher’s offices to allow teacher desk to be removed from classroom.

15 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Programmatic Needs at Elementary School Facilities: Senior High School: Staff work space - Provision for work/task area for teachers and staff. Update/expand main office area. Media center - Library collections are reducing, and technology is becoming integral to the classrooms. Media center to adapt with changes. Media Center to have more prominent location within buildings, easy access from main entrance. Meeting room/conference space - flexible meeting/multi-purpose room. Possibility of team meeting room and teacher work space as a combined space. Consideration for grouped teacher’s offices to allow teacher desk to be removed from classroom. Need for storage space - need to define what is to be stored. Update/expand main building entrance and activities entrance. Update and expand main activities rest rooms and concessions areas. Continued improvement of classrooms and building spaces - flooring, ceilings, lighting

16 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Programmatic Needs at Elementary School Facilities: Long Term Facility Spaces: Swimming Pool Possible new Pilot Elementary School Facility - K-6 Grounds department building expansion - or possible re-location of grounds and transportation department facilities. Sports complex concession stand and restrooms, ticket booths Football storage garage Bleachers/press box at soccer fields Administration building expansion/remodeling. Wind/solar power generation - building specific to each site Reconstruct baseball field Field house facility Remove “Silver Bullet” building to improve “front door” appearance to district. Relocate storage to different area. Repair or replace visitor bleachers, and expand home bleachers, at Lancer Stadium.

17 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Long Term Needs Assessment

18 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

19 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

20 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

21 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

22 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

23 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

24 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

25 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

26 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

27 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

28 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

29 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

30 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

31 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Options for Plan of Action

32 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS List of Possible Masterplan Options Option 1: Construct new Senior High School facility (10-12) Existing Senior High to be remodeled and repurposed into Junior High Facility (7-9) Existing Junior High facility to be repurposed into Elementary school Existing Elementary schools to receive programmatic additions or be reorganized Option 2: Selective demolition and reconstruction of portions of the existing Senior High School facility (10-12) Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices Existing Elementary schools to receive programmatic additions or be reorganized Construct new Elementary school facility Option 3: Existing Senior High school facility to be remodeled and expanded, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices Existing Elementary schools to receive programmatic additions or be reorganized Construct new Elementary school facility

33 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS List of Possible Masterplan Options Option 4: Construct New Senior High school facility (10-12) Selective demolition and reconstruction of existing High School building for use as events and activities center and supplemental programs Existing Junior High school to be expanded for grade 9, additional music room, office improvements and expansion of main offices Existing Elementary schools to be reorganized or reclassified: K-2 or 3-6 Option 5: District to continue current path: *Continue maintenance program for each building in district *Work towards pre-planned wish list items and long term goal items as developed through planning process *Needed expansion and remodeling of existing facilities sequentially

34 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Option 1

35 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 1 1. Senior High School Existing Senior High school facility to be remodeled and re-purposed into a Junior High School facility for grades 7 through 9. Selective demolition and remodeling of existing building to accommodate junior high curriculum requirements.

36 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

37 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 1 2. Junior High School Existing Junior High school to be remodeled and re-purposed into a new three section Elementary school. Selective remodeling of existing building to accommodate elementary school curriculum requirements.

38 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 1 3. Existing Elementary Schools Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas. Ed White

39 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Alan Shepard

40 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Neil Armstrong

41 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Virgil Grissom John Glenn

42 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 1 4. New Senior High School Construct new senior high school for grades 10 through 12 within the Eldridge city limits. 5. Transportation Department Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.

43 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 1 7. Lancer Stadium Expand existing home bleachers. Construct new ticket booths and athletic storage. Ticket Booths for Lancer Stadium Lancer Stadium

44 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Option 2

45 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 2 1. Senior High School Existing Senior High school facility to receive selective demolition and remodeling to allow re-purposing of building as senior high facility serving grades 10 through 12.

46 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

47 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 2 2. Junior High School Existing Junior High school to be expanded to accommodate grade 9 and for additional music room, additional classroom space, office improvements and expansion of main offices. Improve building aesthetic and image of facility.

48 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 2 3. Existing Elementary Schools Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas. Ed White

49 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Alan Shepard

50 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Neil Armstrong

51 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Virgil Grissom John Glenn

52 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 2 4. New Elementary School Construct new elementary school as K-5 facility within the Eldridge city limits. 5. Transportation Department Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.

53 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 2 7. Lancer Stadium Expand existing home bleachers. Construct new ticket booths and athletic storage. Ticket Booths for Lancer Stadium Lancer Stadium

54 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Option 3

55 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 3 1. Senior High School Existing Senior High school facility to be remodeled and expanded, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices. Improve building aesthetic and image of facility.

56 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 3 2. Junior High School Existing Junior High school to be expanded for additional music room, additional classroom space, office improvements and expansion of main offices, and possible expansion for grade 6 or 9 if needed. Improve building aesthetic and image of facility.

57 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 3 3. Existing Elementary Schools Consider potential re-alignment of building grade level organizations. Or, expand existing buildings for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas. Ed White

58 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Alan Shepard

59 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Neil Armstrong

60 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Virgil Grissom John Glenn

61 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 3 4. New Elementary School Construct new elementary school as K-5 facility within the Eldridge city limits. 5. Transportation Department Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.

62 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN – OPTION 3 7. Lancer Stadium Expand existing home bleachers. Construct new ticket booths and athletic storage. Ticket Booths for Lancer Stadium Lancer Stadium

63 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Option 4

64 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 4 1. Senior High School Existing Senior High school facility to receive selective demolition and remodeling to allow re-purposing of building as events and activities center. Re-purposed building would house athletic programs as well as arts and sciences programs.

65 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

66 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 4 2. Junior High School Existing Junior High school to be expanded to accommodate grade 9 and for additional music room, additional classroom space, office improvements and expansion of main offices. Improve building aesthetic and image of facility.

67 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 4 3. Existing Elementary Schools Consider potential re-alignment of building grade level organizations. Existing buildings to be reorganized into either K-2 or 3-6 facilities. Ed White

68 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Alan Shepard

69 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Neil Armstrong

70 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Virgil Grissom John Glenn

71 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 4 4. New Senior High School Construct new senior high school for grades 10 through 12 within the Eldridge city limits. 5. Transportation Department Construct new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department.

72 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 4 7. Lancer Stadium Expand existing home bleachers. Construct new ticket booths and athletic storage. Ticket Booths for Lancer Stadium Lancer Stadium

73 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Option 5

74 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 5 1. Senior High School Existing Senior High school facility to be remain. Long term sequential remodeling and expansion to accommodate long term needs, including: new main entry; activities entrance, concessions, ticketing; expansion of wrestling room; remodeling of boys locker rooms; remodeling of media center and library; remodeling and reorganization of main offices. Improve building aesthetic and image of facility.

75 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 5 2. Junior High School Existing Junior High school to remain. Long term sequential remodeling and expansion to accommodate long term needs, including: additional music room, additional classroom space, office improvements and expansion of main offices, and possible expansion for grade 6 or 9 if needed. Improve building aesthetic and image of facility.

76 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 5 3. Existing Elementary Schools Existing elementary school buildings to remain. Long term sequential remodeling and expansion to accommodate long term needs, including: Remodeling and expansion of existing building for all purpose room, staff work space, meeting space and media center. Address site safety by separating passenger vehicle, bus and pedestrian traffic. Improve building aesthetic and main entry areas. Ed White

77 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Alan Shepard

78 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Neil Armstrong

79 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Virgil Grissom John Glenn

80 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 5 4. New Elementary School Construct new elementary school as K-5 facility within the Eldridge city limits. 5. Transportation Department Future construction of new vehicle maintenance and storage facility within Eldridge city limits. Existing vehicle maintenance building to be used by District Grounds Department

81 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS MASTERPLAN - OPTION 5 7. Lancer Stadium Future expansion existing home bleachers. Future construction new ticket booths and athletic storage. Ticket Booths for Lancer Stadium Lancer Stadium

82 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS Opinion of Probable Cost Consideration for Options 1, 2 & 3

83 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

84 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS

85 North Scott Community School District District Wide Masterplan BRACKE. HAYES. MILLER. MAHON, ARCHITECTS