US Army Corps of Engineers BUILDING STRONG ® Kansas Citys, Missouri and Kansas Flood Risk Management Project Presentation to Kansas City Industrial Council June 30, 2015 Agenda: System Description and History Phase 1 and Phase 2 Project Status
2
BUILDING STRONG ® History of Federal Involvement in Kansas City Flood Risk Management Initial 1940’s system construction incorporated some existing local works. Post-1951 Kansas River Flood: Repairs and additional authorizations for system improvement and upstream lakes in the Kansas River basin. Project phasing/modifications spread levee construction over several decades ending in late 1970s. Major flooding in 1903, 1908, and 1935, smaller events thru 1920’s Flood Control Act of 1936: Established Flood Control as an authorized Federal purpose of the Missouri River. Authorized Kansas City system. Flood Control Act of1944: “Pick- Sloan Plan” for upper Missouri Basin reservoirs and lower basin levee systems. Expanded Kansas City system. Missouri/Kansas River Confluence
3
BUILDING STRONG ® Kansas Citys System
4
BUILDING STRONG ® Kansas City System Description System Features: 46 miles earth levee; 6 miles of floodwall 60 pump stations Stoplog closures Relief wells 4 Benefits Provided: 32 sq mi; $22B investment 5,000 structures ~20,000 residents; ~90,000 jobs Critical Facilities: Rail & road systems of regional and national importance Significant industrial and utility facilities for the metropolitan region.
5
BUILDING STRONG ® Project Status Construction Complete ► North Kansas City Unit - Harlem and National Starch relief well installations Construction Underway ► Fairfax-Jersey Creek Unit - BPU floodwall and Jersey Creek sheet pile wall modifications. ► East Bottoms Unit – relief well installations Future Construction ► Argentine Unit design phase not yet started. ► Armourdale and CID Unit modifications pending authorization.
6
BUILDING STRONG ® Levee Unit Cost Estimate (1,000's, Oct 13) North Kansas City$4,030 FF-JC BPU$8,014 FF-JC Sheetpile$9,471 East Bottoms$4,492 Argentine$74,393 Total Phase 1$100,401 Armourdale$232,650 CID-KS$80,177 CID-MO$575 Total Phase 2$313,402 Total System$413,803 Notes: Estimates as published in the Final Feasibility Report, May 2014. Current construction estimates may vary. Estimates include design, construction, management, real estate, and contingencies. Estimates do not include future inflation. Initiation of construction requires execution of Project Partnership Agreement and is dependent on budget availability and future project authorizations. Estimated Project Costs
7
BUILDING STRONG ® Project Benefits and Performance Oct 2013 prices; 3.5% interest rate; 50 year period of analysis; $1000s Annual CostsAnnual BenefitsBenefit/Cost RatioNet Benefits Phase 1$ 5,046$41,4548.2$36,408 Phase 2$16,720$56,6873.4$39,967 UnitExistingFuture Armourdale3.50.12 CID0.330.12 Argentine1.10.12 East Bottoms1.40.1 North Kansas City0.40.14 Fairfax-Jersey Creek0.570.1 Birmingham0.1 Annual Exceedance Probability (%)