Download presentation
Presentation is loading. Please wait.
Published byMegan McCarthy Modified over 9 years ago
1
2010 Comprehensive Statewide Freight and Passenger Rail Plan – Moving Forward presented by: Minnesota Department of Transportation
2
Accomplishing the Passenger Vision Develop HSR service with Mid West Regional Rail Initiative to connect the Twin Cities to the Chicago Hub Network Develop a regional passenger rail network connecting the Twin Cities to major regional trade centers, coordinated as part of a larger integrated regional/national multimodal system Use interchangeable and interoperable equipment, common facilities, fully coordinated routes, schedules in network All corridors serve state and full Metro area connected through the Minneapolis downtown terminal and St. Paul Union Depot Advance system incrementally to develop network connectivity and grow ridership in timely manner Advance projects simultaneously depending on readiness, funding, ROW acquisition, agreements with freight RRs
3
Phase I Projects (2010-2030) Phase II Projects (Future Expansion) Other Freight Lines
4
Chicag o Detroit St. Louis Madiso n Pontiac Cleveland Cincinnat i La Crosse Rochester Duluth Milwaukee A B C C Twin Cities St. Cloud Willmar To Sioux Falls To Fargo- Moorhead Dayton Columbu s Louisville Kansas City Mankato Eau Claire Midwest Regional Rail Initiative
5
Implementing the Plan Prepare initial planning and environmental assessments on all identified corridors of passenger system to establish eligibility for federal funding Pursue federal funding applications for all projects that are in state of readiness Formalize operating agreements with partner states and regional compacts, railroads, funding partners Advance implementation plans for design, engineering, contracting, equipment and facility procurement, operations, and continuing incremental improvements
6
Moving Forward Corridor Advocates – Build support/ momentum for corridor development Mn/DOT Passenger Rail Office – Manage corridor projects, create corridor development plans partner with other study activities Legislature – Address funding issues and establish institutional framework to develop, manage and operate the system
7
ARRA Awards $2.6b in the MWRRI service area $823m Milwaukee – Madison – Construction $600k Twin Cities to Madison – Service level NEPA – Alternatives analysis – Position the project for federal PE/EIS application spring 2011
8
Questions?
9
9 Dan Krom, Director daniel.krom@state.mn.us 651.366.3193 Praveena Pidaparthi, Planning Program Coordinator praveena.pidaparthi@state.mn.us 651.366.3199 Passenger Rail Office - Contact Information
Similar presentations
© 2024 SlidePlayer.com. Inc.
All rights reserved.