Presentation is loading. Please wait.

Presentation is loading. Please wait.

Ready. Resourceful. Responsive!

Similar presentations


Presentation on theme: "Ready. Resourceful. Responsive!"— Presentation transcript:

1 Ready. Resourceful. Responsive!
NAVSEA SNT MATT MULLINS CDR, USN 5 NOV 2003 Ready. Resourceful. Responsive!

2 Outline Background/Overview Implementation Demonstrations
System Access AIT Demonstrations Parts Marking Military Standards (Product, Package, Contracts, IRRD) Web Site - Reports Future / Initiatives Summary

3 Aviation Maintenance-Supply Readiness
How SNT Got Started Background/Overview Aviation Maintenance-Supply Readiness (AMSR) Review – 1998 Challenge: Lower Maintenance & Supply Cost Increase Readiness

4 System Concept Definition: Plan:
Background/Overview Definition: Closed-loop, cradle-to-grave tracking of maintenance critical, serialized components, providing asset visibility and material status, and enabled by automatic identification technology (AIT) Plan: Collect data through interfaces with various supply and maintenance systems and provide access to stakeholders via a Virtual Shared Data Warehouse

5 System Concept Major Benefits Maintenance Supply
Background/Overview Maintenance Identify Maintenance Deficiencies Measure Reliability Accurate Record Configuration Determine Training Requirements Assist Engineering Investigations Supply Assess Repair Turn Around Time Decrease Misidentification and Losses Warranty Management Predict Parts Requirements Better Procurement Decisions Measure Reliability Achieve Total Asset Visibility

6 SNT SNT Foundation SECOND FIRST SNT requires two components
Implementation SNT Data Base Access AIT SECOND Automatic Identification Technology (AIT) is used by SNT to maintain data accuracy. FIRST Live access to databases via the SNT Web-enabled portal. WMRIL/A-ORS eRMS/WMPS UICP WEB-CAV CAV-ORM CAV-Navy FACTS OOMA/OIMA R-Supply IBS CMB 2D Data Matrix 2D PDF417 Linear Bar Code ISO15418/15434 MILSTD129 MILSTD130 MSL IRRD

7 Shipboard Asset/Information Flow
Organic Depot System Access Carcass Screening Transshipment Carcass Shipment Shipboard Supply ATAC Hub / Node SIMA (O)-Level Retail Sector CDMD-OA (Future) NEMAIS FACTS WMPS eRMS Web-MRIL / A-ORS OMMS UICP NRFI Inventory 3M DB ATAC DB R-Supply Shipboard Inv Web-enabled SNT System DDD/ FISC Navy/CAV FIMARS Depot Repair GTN CAV DB LCAV GTN Organic CAV-ORM Inter Service Navy\CAV DDD/ FISC Commercial CAV NSWC Crane ILSMIS Wholesale Sector UICP Depot Repair Connectivity Not Connected S/N No SN Asset Flow

8 Available for Future Navy Use
CMB Contact Memory Button (CMB) AIT Scheduled Removal Component Card Name Plate Data Computer, Air Data CPU-175/A P/N MFR CONTR SERNO K0656 0152 F C-0025 Warranty Data Maintenance History** CMB Stats: 2k,8k,32k ~$7-$13 each Read/Write Dual CMB/BC Reader $1200 **Use TBD within aviation maintenance Available for Vendor Use Available for Future Navy Use

9 Demonstrations SCADC SQQ-32 SONAR HOSS Camera (AN/SXY-1)
H-60/HSL-40 SCADC SQQ-32 SONAR HOSS Camera (AN/SXY-1) CAMS II A5 MODULE on SUBMARINES Demonstrations

10 Steps to Marking Parts Identify Parts to be Marked Get Approval
Update Drawings & Technical Manuals & Directives Provide Configuration & ILS Support Establish Plan for Marking Plane Side Warehouse (Wholesale & Retail) Amend Repair Contracts/ New Items for Supply Parts Marking

11 Create IRRD with Serial Number
Contracts AIT Package marking Invoices Cage: PN: Ser: 6694 NSN CONT: N T-0023 Name: Magnetic Tape U/I: EA QTY: 1 Mil-Std 129 PDF417 2D ANSI MH 10 Product Marking Nameplate Data CASREP URGENT Serial Number CMB CAGE: V23456 PN: NSN: S/N: Cont: N G010N-0017 Name: Main Rotor Blade 2D Create IRRD with Serial Number

12 Retrograde from Customer
IRRD – AIT Serial Number

13 Retrograde to DD IRRD – AIT Serial Number

14 www.snt.navsup.navy.mil HOMEPAGE

15 SNT Web Page Query Results
Asset Visibility

16 Reliability Decision Support Strong candidate

17 SNT Web Page Query Results
Decision Support Generate, Collect & Analyze Maintenance Data SNT Existing Reports Additional Reports – Top Cost Driver, Top Degraders

18 Carcass Tracking Watch

19 Carcass Watch Notification
Web Page Dear ____________ This is an notifying you of the status of your Carcass Watches: Document Number: N GC23 NIIN: Serial Number: 16740 Condition Code: F Quantity: 0 Shipped From: N NAVAL AIR STATION OCEANA Date Shipped: LTCN: Transportation Mode: - Ship To: N ATAC HUB Norfolk, VA Date Received: Quantity: 1 Shipped From: N ATAC HUB Norfolk, VA LTCN: N GC23XXX Transportation Mode: T - Air, Air Freight Forwarder Ship To: SW3142 Date Received:

20 Wholesale System Reporting S/N
Future Coming Soon DSS Reports SN of Selected Items For Receipts/ Issues SNT WEB Site Accesses Navy Repository Web-enabled SNT System DDNV 12/8/02– 3/3/03 DDDC/DDCN 1/12/03 – 3/3/03 Navy Repository Receipts W/ SN W/O SN DDNV DDDC DDCN Issues DDNV DDDC DDCN

21 Maritime Focus DATA BASE ACCESS: • CDMD-0A
- Display Shipboard Configuration Data • LCAV - In Transit Query INITIATIVES: • GPETE – Working with NAVSEA Code 04L52 • Ship Configuration Validation – Working with NAVSEA Code 04L51 • Rapid Securing Device (RSD) • AN/UYQ-70 • AEGIS Tubes • MK92 TWT • BARCO ATDC monitors and COHU cameras (Tomahawk). • Digital Modular Radio System Initiatives I would be a little leary here on listing inventory as an available query capability. We are addressing Serial Number Capability…. That while we have access to inventory by NSN, we do not have inventory information by Serial Number. The driving theme believe should be Serial numbers.

22 SIM / SNT Parallel Goals
DRID 54 Summary Optimize Logistics Processes to Minimize Customer Wait Time (CWT) using Variance Based Metrics Total Asset Visibility Through Use of AIT, Shared Data Environment and Other Applications Customer Confidence In a Simplified Priority System With Time Definite Delivery Real-Time, Actionable, Web-Based Logistics Information Systems Complements FY02 FY02 FY04 FY04 A big picture slide showing how SNT is helping Navy meet other goals both Navy and DOD level - SUPER REG SIM Directive ADC 44 & 89 DoD UID Policy – 29 JUL 03

23 Summary SNT Project well underway
SNTS Web Application on line – accessing live data Decision Support and Reliability Modules Prototypes completed - proven concept Complying with DOD directives SNT is a part of (and complements) TAV


Download ppt "Ready. Resourceful. Responsive!"

Similar presentations


Ads by Google