„ E U R O B U S I N E S S PARC O R A D E A ” - INDUSTRIAL PARK - O R A D E A E u r o B u s i n e s s P A R C.

Similar presentations


Presentation on theme: "„ E U R O B U S I N E S S PARC O R A D E A ” - INDUSTRIAL PARK - O R A D E A E u r o B u s i n e s s P A R C."— Presentation transcript:

1 „ E U R O B U S I N E S S PARC O R A D E A ” - INDUSTRIAL PARK - O R A D E A E u r o B u s i n e s s P A R C

2 Area of the park: Area of the park:121 hectares Location: Location: Oradea, Borului Road (E60) Owner of the land: Owner of the land:Oradea city Administrator: Administrator: SC EUROBUSINESS PARC ORADEA SRL Sole shareholder: Sole shareholder:Oradea city The title of industrial park: The title of industrial park: Order of MIRA no.685 /15th of December, 2008 O R A D E A E u r o B u s i n e s s P A R C

3 Activities: Activities:processing industry services (business, warehousing, logistic, others) Services and utilities in the park: Services and utilities in the park:interior roads, water and sewage supply, heating energy, electricity, natural gas, telecommunications Fiscal facilities: Fiscal facilities: no property tax is due for buildings land within Industrial Park is exempted from the land taxation O R A D E A E u r o B u s i n e s s P A R C

4 O R A D E A E u r o B u s i n e s s P A R C

5 O R A D E A E u r o B u s i n e s s P A R C

6 Location: Location:Borului Road, km 29 (E60/DN1) 4 km away from the border with Hungary 4 km away from the access point for the future Transilvania Highway 3 km from the entrance in Oradea 6.8 km from Oradea Airport 5.2 km from the city center (city hall) 2 km from the Oradea Railway Station Front side of the park to E60 Front side of the park to E60: 1,2 km O R A D E A E u r o B u s i n e s s P A R C

7 Road access: E60 - Hungarian border - Oradea - Cluj-Napoca - Cluj-Napoca - Târgu Mureş - Sighişoara - Braşov - Sinaia - Ploieşti - Bucureşti - Slobozia – Constanţa E671-(Connection way between E60 and E70) Oradea - Arad – Timişoara E79 -Oradea - Deva - Simeria - Târgu Jiu - Craiova – Bulgarian border DN1 -Bucureşti - Ploieşti - Braşov - Făgăraş - Sibiu - Alba Iulia - Turda - Cluj Napoca - Oradea – Hungarian border DN19-Oradea - Satu Mare - Negreşti Oaş - Sighetu Marmaţiei DN76-Oradea - Beiuş - Deva (DN7) DN79-Oradea - Arad O R A D E A E u r o B u s i n e s s P A R C

8 Neighbourhood: -International Transport Companies: Galassini, Centrum, Frigoexpres -Constructions companies: Selina SA, CIAC, SIMBAC SA -Company of producing IT components: Celestica, Connectronics -Heating and electrical power Supplier: Sc Electrocentrale SA -Custom house for goods -High Power Transformer Station -Water cleaning Station O R A D E A E u r o B u s i n e s s P A R C

9 The offer for land in the industrial park Concession - procedure:public tender - starting price:0,32 EUR/sqm/year – for the industry area 0,38 EUR/sqm/year - for the services area - administration tax:0,50 EUR/sqm/year purchase the land The possibility to purchase the land after realizing the investment (100%). Price of the land:starting from 8 EUR/sqm O R A D E A E u r o B u s i n e s s P A R C Exemption: The concession of the land can be done through direct negotiation in the case an investor engages to a minimum investment of 5 milions euros (the value of the building). In this case the investor has the possibility to buy the land after 15% of the investment is being realized.

10 The access of the investors in the Industrial Park Qualification requests – Qualification requests – constitutive documents of the company, certificates Evaluation of the offers: Score Score 100 points  Offered price35 points  The investment engaged35 points  The number of jobs created30 points O R A D E A E u r o B u s i n e s s P A R C

11 Mandatory clauses in the terms of reference Time limits for realizing the investment: - submit the documents for obtaining the building permit: within 4 months from the date on which the contract came into force - starting the works:within maximum 1 year from the date on which the contract came into force The carrying on of the activity for which the concession contract was concluded is necessary to be started within 2 months from finalization of the constructions. Statutes of Eurobusiness Parc Oradea – Decision of the Local Council of Oradea no.25/2009 O R A D E A E u r o B u s i n e s s P A R C

12 O R A D E A E u r o B u s i n e s s P A R C Activities forseen for the year 2009 Completing the Urbanistic Zonal Plan : August 2009 Completing Feasibility Study for infrastructure (roads and utilities) : August 2009 Opening up the public tender for the available lots: August 14 th, 2009 Estimated time for completing the works for providing basic utilities in the Industrial Park: Spring 2011