Presentation is loading. Please wait.

Presentation is loading. Please wait.

Government Furnished Equipment (GFE) Overview

Similar presentations


Presentation on theme: "Government Furnished Equipment (GFE) Overview"— Presentation transcript:

1 Government Furnished Equipment (GFE) Overview
Edlouie S. Ortega, MSM, CDFM Equipment and Technology Management Medical Equipment and Logistics Solutions Naval Medical Logistics Command

2 Assets (Financial World)
DoD Concerns Assets (Financial World) PP&E Inventory/OM&S Real Property Personal Property Repairables Consumables Internal Use Software Land 2017: DoD audit readiness goal! Facilities Equipment 2017 Military Equipment Buildings Structures General Purpose Equipment Linear

3 Distilled into four (4) types under the Federal Acquisition Regulation
Assets PP&E Inventory/OM&S Real Property Personal Property Repairables Consumables Internal Use Software Land Distilled into four (4) types under the Federal Acquisition Regulation Facilities Equipment Military Equipment Buildings Structures General Purpose Equipment Linear

4 4 1. Equipment (for use or repair) 2. Special Tooling
Assets Personal Property 1 Equipment Special Tooling Special Test Equip. Material 2 3 4 For Repair 1. Equipment (for use or repair) 2. Special Tooling 3. Special Test Equipment 4. Material For “Use” 4 types of contract property

5 Cost of an Airplane The Airframe is the price on the contract
CAP transferred from Developmental Contract The engines provided as GFE from a different contractor GFE parts requisitioned from DLA

6 Cost of Care Output: Image for Clinical Review Repair Parts/
Special Tooling Network Switches Network Acquisition Devices Network Gateway Network Switches Maintenance Monitoring System

7 Baseline information needed
Inadequate data No standard method Do we know: What is GFE; where it is; and what its worth Why? Contracts (especially legacy contracts) do not always contain GFE listings; listings are often ad-hoc and inaccurate DoD Component past practice was to “zero out” equipment (GFE) records Little rigor in evaluating contractor need for GFE

8 The Latest GFE Memo… OSD memorandum issued on January 7, 2012 Goals
Promote the current clause requirements Demonstrate the relationship between the clauses, the DoD policy, and the system capabilities (IUID Registry) Get a starting point for equipment already used by contractors Laptop Computers Offsite equipment w/no gov’t representative Increase visibility and awareness of the “mystery” surrounding GFE Highlight the criticality to auditability

9 The Memo Explained Based on existing policy
NO NEW POLICY is in this memo Requires HQ Level coordination Each DoD Component will take a unified approach Standardizes DoD practices Eliminates ad-hoc data calls to contractors Promotes a common enterprise approach Use of IUID Registry as master data source for GFE Single face to industry Consistent with DoD Instruction

10 OSD Methodology Highlights
Create integrated Project Team to execute methodology Program Managers Acquisition Managers Accountable Property Officers, etc. Use IUID Registry to interface with Contractors

11 OSD Methodology Highlights
Leverage DCMA’s Property Management System Analysis (PMSA) to validate data: “Adequate” record rating & “Low” risk = accept contractor data “Inadequate” record rating & “High” risk = Ctr perform wall to wall inventory to validate data, data validated independently “Inadequate” record rating & “Moderate” risk = evaluate Corrective Action Plan and use sampling techniques to validate data Emphasize focus on improving business processes to improve accountability for GFE going forward Modify contracts to list GFE to bring contracts into FAR, DFARS compliance Amended contracts to serve as supporting documentation for government’s rights/obligations to equipment

12 OSD Expectations Contracting Officers (Buying Commands)
Use the opportunity to update property clauses (FAR and DFARS) and other terms and conditions Modify contracts with appropriate property info per PGI 245 Program Offices Work with Accountable Property Officers to establish needed property records based on risk assessments of contractors Contractors Report property per contract terms; utilize the IUID Registry as appropriate

13 DOD Recommended Step by Step
First [immediate]: Stop the bleeding. No GFE should be furnished without PCO first meeting PGI Second: [short term]: Identify contracts coming to completion within one year Third: [intermediate]: Identify contracts going beyond one year Modify contracts as needed to add GFE listing Fourth: [long term]: Update local policy and procedures; sustainment & compliance

14 “How to account for GFE in DMLSS” HM1 Sherwin Villagracia
DEMONSTRATION “How to account for GFE in DMLSS” HM1 Sherwin Villagracia

15 QUESTIONS? (301)

16 Related Sessions LO-M-1-F Business Objects Training for Equipment Managers LO-T-3-B Equipment Management Self Assessment - Conduct Your Own LAV LO-W-3-C Automatic Identification Technologies (AIT) /IUID and RTLS LO-W-3-D Equipment Management Process LO-W-3-E Annual Inventory Process and Requirements


Download ppt "Government Furnished Equipment (GFE) Overview"

Similar presentations


Ads by Google