PEIP National workshop in Montenegro: developing environmental infrastructure projects in the water sector Feasibility Study Preparation Venelina Varbova Project Manager, REC for CEE
2
www.rec.org Session Overview The Feasibility Study process according to international standards The Feasibility Study structure Discuss the challenges faced by many SEE consultants and local governments in preparing projects
3
www.rec.org The Feasibility Study: something we already know Feasibility study as project plan - assumes the project concept is feasible and maps out the course for project implementation Focus on engineering aspects – low attention to social, institutional, environmental aspects Economic and/or financial analysis limited to budgeting exercise and some cash flow Feasibility analysis as part of the process is missing
4
www.rec.org The Feasibility Study: international standards Feasibility study is the result of feasibility analysis Convince the reader (financing entity) that the project is worth funding Document relevant information and aspects regarding the project Assess whether the project is relevant, viable and implementable Enable the project proponent to prepare financing application and present the project to sources of financing
5
www.rec.org Project as a Solution to a Problem COMMON APPROACH Environmental investment project = Equipment and construction ALTERNATIVE APPROACH Environmental investment project = Solution to a problem
6
www.rec.org Project Preparation vis-à-vis Project Cycle Strategic and Sectoral Considerations Design Phase Feedback loops Process flow Project Identification Project Preparation Implementation Planning Project Start-up Project Execution Project Sustainability Implementation Phase Feasibility Study, EIA, PSD Pre-feasibility Study, PPD PIP
7
www.rec.org FS Components Technical Analysis Institutional Analysis Social and Stakeholder Analysis Environmental Analysis Economic Analysis Financial Analysis Project Feasibility
8
www.rec.org Project Strategic Context Strategic goals; priority programs at local/regional level National policies: National, regional or sectoral goals which the project supports Project environment issues: policy, legal and regulatory, institutional framework, environmental, etc.
9
www.rec.org Technical Assessment Technical assessment of existing services, physical system, and treatment, and measures for their optimum use Demand (wastewater flow) analysis and forecasting Establish gap between the current level service and future demand Develop technical alternatives for the project required outputs (design, technology, process, scale)
10
www.rec.org Financial and Socio-economic rationale of environmental investment project Purpose of the financial analysis is multiple: Assessment the project in terms of costs and benefits A tool for assessment of financial and economic viability of the project A tool for preparing financing plan A tool for analyzing, structuring and selecting different project options
11
www.rec.org Financial cost-benefit analysis of a project Evaluates and calculates the project’s financial: Revenues Costs Net benefits (of revenues over the costs) Consultants in the SEE region are knowledgeable in environmental technologies but lack expertise in preparing economic and financial analyses
12
www.rec.org Economic Cost-Benefit Analysis of a project Purpose: To assess the project economic worth to the country Evaluates and calculates the project’s economic benefits and costs to the whole economy in constant economy prices ( adjusted financial prices ) including external benefits: Environmental benefits Health effects Non-technical losses (UFW)
13
www.rec.org Social and Stakeholder Analysis Local Government Consumers Operator/Utility Vulnerable groups Wider community Ultimately all ventures are about people! It’s more important to understand the people than the technology: Who gains? Who loses? Social and distribution analysis of project effects (different beneficiaries) Poverty Impact Analysis
14
www.rec.org Environmental Impact Assessment Assessment of project impacts to physical and also non- physical environmental aspects: Physical (water, air, land) Biodiversity Noise, odors Safety Aesthetics, cultural and historical heritage Two possible levels of assessment: Preliminary (Initial) Environmental Review Full Environmental Impact Assessment
15
www.rec.org Institutional Analysis Purpose: Relationship and independence of the water company from the municipality in setting tariffs Capacity of the project entity to: implement, manage and maintain the project Financial sustainability of the project entity Adequate project management processes, including procurement and human resources Capacity building programs Many of these aspects are often overlooked in the analysis
16
www.rec.org Summary of main challenges in project preparation Analysis and comparison of alternatives Insufficient expertise of SEE consultants in preparing economic and financial analyses and assessing the human aspects of the projects in terms of stakeholders and institutions Cooperation of consultants with local governments Local governments still know little of the market for project financing
17
www.rec.org Summary The feasibility analysis is an internationally accepted process used to evaluate various project dimensions important for achieving the desired project results. An effective tool for appraising the project from standpoints of all project stakeholders It is not a waste of time. It significantly reduces the risks in project implementation Capacity building projects need to take account of the major challenges in FS preparation and address them