SwRR 4/28/2010 1 Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010.

Similar presentations


Presentation on theme: "SwRR 4/28/2010 1 Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010."— Presentation transcript:

1 SwRR 4/28/2010 1 Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010

2 SwRR 4/28/2010 2 Telecon Agenda Requirements Definition Baseline Software Requirements Specification (SRS) Software Documentation Tree Requirements Partitioning for Phased Delivery (Build Plan) Testing Requirements Requirements Traceability Matrix (in SRS)

3 SwRR 4/28/2010 3 Telecon Documents Management Plans/Standards MAVEN-PM-RQMT-0006 (Mission Assurance Requirements) MAVEN-PM-PLAN-0021 (System Review Plan) MAVEN-SYS-PLAN-0020 (Software Management Plan) MAVEN-SYS-PLAN-0032 (Eng Peer Review Plan) NPR_7150.2 (Software Engineering Standard) NASA-STD-2100-91 (Software Documentation Standard) NASA-STD-8739.8/1 (Software Quality Standard) NASA-STD-8715 (Software Safety) GSFC-STD-1000e (Gold Rules) MAVEN_PF_QA_002A_UCB_MAIP MAVEN_PF_SYS_009A_SEMP MAVEN_PF_SYS_011_CMP MAVEN_PF_SYS_012_RMP MAVEN_PF_SYS_006B_GoldRuleCompliance MAVEN_PF_SYS_008_PFDPUFlightSoftwareDevelopmentPlan

4 SwRR 4/28/2010 4 Telecon Documents Requirements/Specifications MAVEN-PFIS-RQMT-0016B.xls (Level 3) MAVEN_PF_SYS_010_FSWRequirements.xls (Level 4) MAVEN-SC-ICD-0007 (Spacecraft ICD) MAVEN_PF_SYS_004 (PF to Instruments ICD) MAVEN_PF_PFDPU_001C_DCB_Specification.doc MAVEN-PF-LPW-001E-Requirements_DOORS_Export.xlsx TBD - LPW ICD detailing commands & telemetry MAVEN Magnetometer Instrument Interface 7-April-2010.pdf MAVEN-PF-SEP-001a_Specifications.xls TBD - SEP FPGA Specification MAVEN-PF-STATIC-001A-Requirements_&_Specifications.xls MAVEN_PF_STATIC_012F_FPGA_Specification.pdf MAVEN-PF-SWEA-002_Requirements.xls MAVEN_PF_SWEA_012A_FPGA_Specification.pdf MAVEN-PF-SWIA-001g_Requirements.xls MAVEN_PF_SWIA_012B_FPGA_Specification.pdf

5 SwRR 4/28/2010 5 Telecon Documents Software Documents/Reports Preliminary plan MAVEN_PF_FSW_002_SRS (Software Requirements Specification) MAVEN_PF_FSW_003_SDD (Software Data Dictionary) MAVEN_PF_FSW_004_SAD (Software Architecture) MAVEN_PF_FSW_005_SID (Software Interface Design) MAVEN_PF_FSW_006_STP (Software Test Plan) MAVEN_PF_FSW_007_SUM (Software Users Manual) MAVEN_PF_FSW_008_SMP (Software Maintenance Plan) MAVEN_PF_FSW_009_SRD (Software Risk Database) MAVEN_PF_FSW_MPR_YYMM (Monthly Progress Report inc/ Metrics) MAVEN_PF_FSW_SVD_XXX (Software Version Descriptor) MAVEN_PF_FSW_STR_XXX_YYMMDD (Software Test Report) MAVEN_PF_FSW_SIR_XXX_YYMMDD (Software Inspection Report) MAVEN_PF_FSW_SCR_NNN (Software Change Request) MAVEN_PF_FSW_SPR_NNN (Software Problem Report) Review Packages (SwRR, SwPDR, SwCDR, SwATRR, SwAR) Sw Design Peer Review Packages (periodic) Sw Code Walkthrus (prior to each build delivery) PF Fault Management Design Peer Review (iCDR+90d) Test Procedures, GSE Display Definitions, Command & Telemetry Database files

6 SwRR 4/28/2010 6 Telecon Build Plan Software Products Boot FSW (PROM) Operational FSW (EEPROM) Generally developed in phases

7 SwRR 4/28/2010 7 Telecon Schedule

8 SwRR 4/28/2010 8 Telecon Test Requirements Test Platform : ETU Data Controller Board Initially ETU PFDPU when available Test Equipment: GSE PC GSEOS Software Spacecraft Simulation Instrument Simulation (w/ Good and Bad Data Sets) Logic Analyser Digital Scope Data Storage: All instrument data and housekeeping Command/Event logs Network access


Download ppt "SwRR 4/28/2010 1 Telecon MAVEN Particles and Fields Flight Software Requirements Review SwRR Peter R. Harvey April 28, 2010."