Download presentation
Presentation is loading. Please wait.
Published byFrancis Allen Modified over 9 years ago
1
Intro to GovDev for TFS Accelerator Microsoft Public Sector http://govdevfortfs.codeplex.com
2
Core Problem to Address Software planning & delivery is rigid and based on outdated Waterfall process. Software development teams desire Agile but planning & delivery framework does not match. PlanRequirementsDesignDevelopmentTest Release
3
Secondary Problems to Address Due to Waterfall roots, reports such as “Requirements Traceability Matrix” are desired. Government projects highly leverage contractors and need new ways to measure work contribution.
4
GovDev Process Flow Requirements PlanRequirementsDesignDevelopmentTestRelease UC Tasks Tests Bugs Tests
5
Requirements Traceability Report
6
Contribution By Team Member
7
GovDev for TFS Accelerator: Open Source – Download at http://govdevfortfs.codeplex.comhttp://govdevfortfs.codeplex.com Built by Microsoft PubSec Developer Team (http://blogs.msdn.com/publicsector) Built for TFS 2010; SP1 Posted as “Beta” on March 1, 2012 (v1.0 by 5/2012) ---------------------------------------------------------------- Comments and Questions: http://govdevfortfs.codeplex.com/workitem/list/basic http://govdevfortfs.codeplex.com/workitem/list/basic For Training & Support, contact CEI America: www.ceiamerica.com/solutions/microsoft.aspx www.ceiamerica.com/solutions/microsoft.aspx
Similar presentations
© 2025 SlidePlayer.com. Inc.
All rights reserved.