Presentation is loading. Please wait.

Presentation is loading. Please wait.

Vicki Worden GBI Commercial Programs 202-841-2999

Similar presentations


Presentation on theme: "Vicki Worden GBI Commercial Programs 202-841-2999"— Presentation transcript:

1 Vicki Worden GBI Commercial Programs vworden@thegbi.org 202-841-2999 vworden@thegbi.org

2 GBI Solutions

3 Objectives GBI view of the problem Green Globes™ for Continual Improvement – U.S. Pilot Program GBI Solutions for Cities

4 The Problem: Adoption, Actual Performance

5 Why Are We Here?

6 Target Audience for Green Building

7 25 50 125 Energy Consumption, KBtu/sf-yr 75808590950005101520 Year * * * * * * * * DOE/EIA CBECS Trend with 95% CI (June 2006) ASHRAE Std 90-75 ASHRAE Std 90A-1980 ASHRAE Std 90.1-1989 ASHRAE Std 90.1-1999 ASHRAE Std 90.1-2004 XYY Z Y EO 13123 (PBS P100)    Typical GSA Target To 16K by 2025 DOE Goals (2006) No significant change in surveyed energy consumption for the last 25 years Insignificant change in energy targets for the last 30 years ∆ = 43% Ave = 88 KBtu/sf-yr AIA BEPS (1976) Energy Trends and Predictions /3 25(7.3) 50(14.7) 75(22.0) 100(29.3) 125(36.6) Data in brackets ekWh/sf-yr Source: James E. Woods, Ph.D., P.E The Building Diagnostics Research Institute, Inc.

8 GSA Portfolio Energy Use From: NIBS, 2003

9 Problem—Conclusions Buildings in operation are major contributors to carbon emissions Relying on predictions of energy performance and code is not enough for new buildings Improving the existing building stock is an imperative to meeting 2030 Challenge

10 GBI Suggestions for Cities 1.Set goals for existing building stock 2.Emphasize benchmarking using actual building performance data---such as the EPA’s Target of 75 or greater 3.Take Green Globes for Continual Improvement for a test drive… Join the U.S. Pilot of Green Globes for Continual Improvement of Existing Buildings. www.thegbi.org

11 GBI Solutions for Cities

12 Our Approach CommercialResidential

13 Green Globes System: A Building Life Cycle Approach Web-based questionnaire’s prompt next steps throughout the nine stages of planning Project Initiation Site Analysis Programming Schematic Design Design Development Constructions Documents Contracting and Construction Commissioning Measured Performance: Continual Improvement of Existing Buildings The Project Loop Verified Rating: Must have third-party verification to be a Green Globes building. This can occur after construction for new buildings or after 1-2 years of operations for existing structures. System generates early assessments to guide improvements in design and operations

14 Common Benchmark- EPA Target Finder Design Operation

15 Present Calculation 0 5 (17) 10 (34) 15 (51) 20 (68) 30 (102) 25 (85) US Building Average 50% Reduction – 2010 Challenge Energy Star 75% Target Annual Energy Consumption kWh/SF-year (kBtu/SF-year) Carbon Neutral – 2030 Challenge 0 Pts 100 Pts

16 2.Green Globes for Continual Improvement establishes the baseline, gives a current performance report, guides improvement. Sign up for U.S. Pilot today! 1.Green Globes for Design/New Construction guides the Integrated Design Process at each stage of project delivery. U.S. Pilot Completed 2006 Green Globes Offerings

17 Enter Building Performance Data Questionnaire Questions are “yes”, “no” or “n/a”, multiple choice, require data entry or description. Tip box Explains verification requirements.

18 Report Screen Chart shows percentage of points achieved for each section in meeting the best green design practice. Report Screen Chart shows percentage of points achieved for each section in meeting the best green design practice.

19 View the Report Achievements

20 View the Report Recommendations for improvement

21 View the Report Supplementary information Hyperlinked web references

22 Portfolio Approach Case Study The benchmarking can help identify the opportunities and track improvements. Region 2

23 GWL Case Study

24

25 Portfolio Case Study

26 Summary: GBI Solutions for Cities

27 GBI Residential Network

28 Government Recognition “ I would like to commend the efforts of the Central NM HBA and the GBI for making Build Green New Mexico a reality.” Martin Chavez Mayor, City of Albuquerque

29

30 GBI 2005-2006 Track Record 16 residential programs up and running NAHB guidelines released in 10 climate sensitive versions, interactive version in the works 1000 trained on Green Globes system U.S. pilot of Green Globes for Design/New Construction concludes—8 buildings certified, 150+ using the system U.S. pilot of Green Globes for Continual Improvement of Existing Buildings launched

31 Who We Are Leadership & Technical Committees

32 Board of Directors

33 ANSI Technical Committee for Green Globes--Commercial

34 Questions? Vicki Worden 202-841-2999 vworden@thegbi.org Questions? www.thegbi.org Vicki Worden 202-841-2999 vworden@thegbi.org


Download ppt "Vicki Worden GBI Commercial Programs 202-841-2999"

Similar presentations


Ads by Google